Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Optimizing Grinding Circuits

    By James Anstey

    BHP Billiton?s Cannington facility is a mining and minerals processing plant near Mt. Isa in Central Queensland, Australia, producing silver, lead and zinc. Mine ore is processed in a concentrator, wh

    Apr 1, 2005

  • CIM
    A Techno-Economic Assessment of the Coal Gold Agglomeration Gold Recovery Process

    By I. G. Townsend, S. A. Buckley, C. I. House

    "SummaryBritish Petroleum plc is developing a new gold recovery process known as coal gold agglomeration (CGA) for the recovery of gold from its ores. Liberated gold grains are recovered with high eff

    Jan 1, 1989

  • CIM
    Operations at La Luz Mines and Rosita Mines Nicaragua, Central America

    By John Plecash

    This paper comprises a general outline of all of the developments, including the history, geology, mining, milling, power and transportation installations, at the gold mining operation of La Luz Mines

    Jan 1, 1963

  • CIM
    Mineralization and Metallurgy of the Samatosum Project

    By P. J. Gron

    "The Samatosum Project is a base and precious metal deposit located in south central British Columbia. A dilute ore reserve of 766, 682 tonnes grading an average 1.1% copper, 3.0% zinc, 1.4% lead, 833

    Jan 1, 1990

  • CIM
    Golden Giant Mine Mill Process Description and Operating Highlights

    By R. Tessier, C. R. Larsen

    "INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca

    Jan 1, 1986

  • CIM
    Predicting Locked Cycle Flotation Test Results from Batch Data

    By G. E. Agar

    This paper deals with the prediction of locked cycle flotation results from data developed from individual batch tests. A postulate is made that the distribution of material in a separation stage is d

    Jan 1, 1978

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    An Improved Definition of Rock Quality Designation, RQDc

    By L. Li

    The rock quality designation (RQD) was initially introduced by Deere (1963) for civil engineering. But, its application has been largely extended to rock mechanics and has become a fundamental paramet

    May 1, 2009

  • CIM
    Cluff Lake Mill - Phase 2 Expansion

    By H. A. Schnell

    "The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m

    Jan 1, 1985

  • CIM
    Comparison of Ore Hardness Measurements for Grinding Mill Design for the Tenke Project

    By David Meadows, John Starkey

    "As part of the ongoing project development for the Tenke Fungurume Copper-Cobalt Project in the Democratic Republic of Congo, Phelps Dodge Corporation has examined methodologies for determining the s

    Jan 1, 2007

  • CIM
    Process Design Consideration for a Small Gold Mill in the Northwest Territories

    By A. M. Childs, R. F. Mather, K. R. Rawling

    "The challenges encountered in the design and construction of mines and their process facilities today are becoming more intense and the engineering more competitive. The need to incorporate new techn

    Jan 1, 1983

  • CIM
    New Mill Design for Large Grinding Mills

    By Kjell Winther

    "Hydralift Scanmec introduced early in the eighties a new and different mill design for very large grinding mills. The design described has actually no size limitation upwards and is so far suggested

    Jan 1, 1995

  • CIM
    Precision and Bias For Settlements

    By Jan W. Merks

    "The settlements between mines and smelters are based on the mass of metal contained in concentrate lots. The mass of contained metal is a function of the wet mass of a lot, and its moisture content a

    Jan 1, 1995

  • CIM
    Lamella Thickener Performance in Potash Refining (eda27180-f1f6-4ab3-854e-c986b2a1249d)

    By Douglas M. Smith, G. A. Maki

    "The initial development of the massive potash deposits of the prairie evaporite formation took place over a decade ending in 1970. The potash mining and refining facility near Rocanvi11e, Saskatchewa

    Jan 1, 1983

  • CIM
    Treatment of Non-Magnetics at Falconbridge

    By C. H. Dionne, J. A. Holmes, B. J. Huls

    "Falconbridge Limited is presently developing flowsheet alternatives for implementation at the Strathcona Mill. The main thrust for change arises from the need to reject more pyrrhotite from the conce

    Jan 1, 1991

  • CIM
    The Recovery of Copper from Copper Oxide Ore using Heap Leaching, Solvent Extraction and Electrowinning

    By R. H. Walton

    "In recent years the recovery of copper from low grade oxide ores has received widespread attention. The cost of treating such ores using conventional technology, such as milling and flotation, is fre

    Jan 1, 1990

  • CIM
    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011

  • CIM
    The Use of Diagnostic Testwork and CIP/CIL Modeling to Improve the Metallurgical Performance at Two IAMGOLD Operations

    "A simple approach to optimizing the performance of an operating carbon in pulp (CIP) or carbon in leach (CIL) plant is presented. It is possible to reproduce the performance of an operating CIP or CI

    Jan 1, 2011

  • CIM
    Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.

    By Bruno Lemelin

    Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther

    May 1, 2004

  • CIM
    Flotation Feed Size Distribution

    By Claude Bazin

    "Laboratory semi-batch flotation tests were conducted using two different sulphide ore samples. The size reduction was adjusted to cover a wide range of flotation feed size distributions. Results show

    Jan 1, 2006