Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Impact on Mill Design and Flotation Control of New Discoveries in the Relationship between Macro and Micro Grindability

    By J. H. Starkey

    Large differences between macro and micro grindability relationships have been discovered for mill design measurements using the patented SAGDesign(TM) test. Crushing, Rod and Ball Mill Wi tests, and

    Jan 1, 2009

  • CIM
    Simulation of Bulk Earthwork and Quarry Material Delivery During Surface Mine Transformation

    By S. Duvah Pentiah

    The transformation of an open pit coal mine to a horizontal-punch underground mine is subject to a number of challenges. These include scheduling the operation of various sizes of trucks over a long p

    Aug 1, 2013

  • CIM
    Extraction Design of Locked-Up Coal by Highwall Mining in India

    By John Loui Porathur

    Highwall Mining has been recently introduced in India. The first Continuous Highwall Mining extraction in India started operating at Ramagundem Opencast Project-II (OC-II) of Singareni Collieries Comp

    Aug 1, 2013

  • CIM
    Performance Reporting Using Schedule Compression Index

    By Bahaa Hussein

    Considerable number of methods and procedures has been introduced for trending and progress reporting of engineering, procurement and construction projects. This paper introduces a novel method, desig

    Aug 1, 2013

  • CIM
    Availability and Reliability of Siemens? Gearless Drives

    By Kurt Tischler

    This paper presents the field experience of Siemens with regard to Gearless Drives in the mining industry ? We consider the elapsed production hours of Siemens Gearless Drives to be extensive enough t

    Jan 1, 2012

  • CIM
    Malartic Gold Fields Mine

    By R. A. Halet

    "The Malartic Gold Fields mine is a good example of the association of ore deposits with a major fault zone. It also exemplifies the control exerted by the physical and chemical character of the host

    Jan 1, 1954

  • CIM
    Investigation of the Silica Slag of Norddeutsche Affinerie's Flash Furnace

    By T. Loos

    The Norddeutsche Affinerie operates an Outokumpu-Flash-Furnace as a smelting unit. The pyrometallurgical slag cleaning process is based on the slag reduction and settling in the electric furnace. Sinc

    Jan 1, 2007

  • CIM
    Remote Firmware Upgrading in the Emergency Communication Dispatcher's Broadcasting System Sat, Product of Telvis Ltd.

    By A. Kowalski

    Telvis Limited, manufacturer of an emergency communication dispatcher's broadcasting system, now introduces the possibility of a remote software upgrade to its devices. The paper presents methods

    Aug 1, 2013

  • CIM
    Paste Slot Raise Drilling, a Novel Alternative to Slot Drilling in Long Hole Stoping: A Case Study

    By Gurupraveen Ramanathan

    Slot raises are relief holes within a stope in longhole stoping methods, designed to provide a free face that facilitates the expansion of the blasted rock during blasting, ultimately achieving the de

    Oct 1, 2024

  • CIM
    An Analysis of a Detailed Engineering Study in Accordance with IESO IAP Requirements

    By N. D. Wineinger, J. Jodouin

    "An Independent Electricity System Operator Industrial Accelerator Program (IESO IAP) case study was completed for a mine in Ontario, Canada by SRK Consulting, Inc. The purpose of the study was to ana

    Jan 1, 2019

  • CIM
    Enhanced Liberation In HPGR Circuits

    High Pressure Grinding Rolls (HPGR) are said to be a good option in new grinding circuits. Due to their low energy consumption compared to other grinding systems such as SAG milling, there is a strong

    Jan 1, 2012

  • CIM
    Remote, Non-Contact Sensors for Control of the Integrated Process Route

    By M. S. Millman

    Close monitoring of performance at each process stage, from raw material through to finished product, is vital for operational consistency and the production of high quality steel. However, many of th

    Jan 1, 2004

  • CIM
    New Formulations for Reverse Flotation of Phosphate from Sedimentary Ores

    By A. Klingberg, M. Svensson, N. Smolko Schwarzmayr

    "Removal of silicates and carbonates from sedimentary phosphate ores by the use of new synthetic collector/formulations was investigated in a comparative study with traditionally used collector system

    Jan 1, 2016

  • CIM
    Use of Conditional Simulation to Assess Mesclassifcation of Ore and Waste in a Highly Discontinuous Gold/Copper Deposit

    By W. Hardtke, B. Perry

    Model reconciliation problems at the low-grade, high-nugget Phoenix gold-copper deposit led to an examination of the influence of production decisions on ore-waste classification. A conditional simula

    Jan 1, 2011

  • CIM
    Phosphorus and Arsenic in Steel and the Substitution Theory

    By A. E. Cameron

    The theory of atomic distribution of the stranger atoms in the space lattice of the solvent metal has been well developed by Rosenhain. It has long been known that the addition of one metal to another

    Jan 1, 1927

  • CIM
    SABC Circuit Operations at Eldorado?s Jinfeng Gold Mine

    By Yan Yang

    The Jinfeng gold mine is one of the three gold mines that Eldorado Gold has in China and it is the second largest gold mine in China. The mine is located in a relatively remote and mountainous area in

    Jan 1, 2012

  • CIM
    Selective Removal of Mercury from Gold Mining

    By J. G. Stevens, S. W. Colley

    "Selective separations of metals and ions in mineral extraction and refining are becoming more challenging as ore bodies become more complex and environmental pressures increase. The separation and co

    Jan 1, 2016

  • CIM
    Design of Extra-Large Coal Preparation Plant in China

    By Minghui Li

    China is the largest coal producer in the world. In 2012, the coal production in China is 3.65billion tonnes, accounting for approximately 49% of global coal production. The raw coal production in 201

    Aug 1, 2013

  • CIM
    Silicothermic Extraction of Magnesium from Dolomite by Induction Heating

    By N. K. Jaber

    The "Pidgeon Process" for the extraction of magnesium from dolomite ore utilizing ferrosilicon as the reducing agent has been studied extensively by active metallurgists such Mr L,M, Pidgeon the fathe

    Jan 1, 2006

  • CIM
    Ventilation System Design for the Wassa Underground Mine

    By B. S. Prosser, K. G. Wallace, A. Akansobe

    "This paper describes a ventilation project at the Wassa gold mine in Ghana. Golden Star (Wassa) (GSWL), a subsidiary of Golden Star Resources, owns and operates the mine. Golden Star holds a 90% inte

    Jan 1, 2019