Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The role of a pilot scale facility in performing R&D and helping Canadian coal and mineral industries

    By O. E. Humeniuk, A. I. A. Salama, M. W. Mikhail

    "The Western Research Centre (WRC) of CANMET operate a unique pilot plant facility where ongoing R&D on coal preparation and mineral processing is conducted. The pilot plant carries out two functions:

    Jan 1, 1992

  • CIM
    Monarch and Kicking Horse Mines (e1256bf9-531c-4f9f-a430-d293cf06c4ff)

    By W. L. Brown

    "The properties of Base Metal Mining Corporation are in Yoho Park about 2 1/2 miles northeast of Field; British Columbia; on the main line of the Canadian Pacific railway. There are actually two mines

    Jan 1, 1954

  • CIM
    Geology of limestone and dolomite deposits Cape Breton Island, Nova Scotia

    By Donald J. MacNeil

    The commercial carbonate industry of Cape Breton Island, Nova Scotia, began about eighty years ago with the opening of the Sydney steel plant. Significant carbonate deposits are confined to the Precam

    Jan 1, 1984

  • CIM
    Continuous casting of steel

    By F. Weinberg

    "The recent development of the continuous casting process for steel has required basic understanding in a number of areas in the metallurgcal sciences. In some areas, information is still lacking. The

    Jan 1, 1981

  • CIM
    Application of longhole drilling methods for narrow vein mining

    By Richard Cyr, Peter Larsen, William Quesnel

    "The need to continually improve efficiency and lower costs in mining operations is of paramount importance to all concerned in the industry. Mining operations are constantly testing new methods and e

    Jan 1, 1990

  • CIM
    Phalen Colliery: Production and productivity

    By George R. White

    "The Phalen Colliery, the Cape Breton Development Corporation's flagship, is now producing thermal and metallurgical grade coal in Eastern Canada's Sydney Coal Field. The colliery is a drift

    Jan 1, 1990

  • CIM
    Value added products

    By J. A. E. Bell

    "Inco has shifted part of its traditional extractive research effort at its J..Roy Gordon Research Laboratory in Mississauga toward new, value-added products. Most of the effort is being expended on n

    Jan 1, 1990

  • CIM
    Dewatering Brunswick concentrates by pressure filtration

    By J. E. Nesset

    "As an alternative to conventional dewatering by vacuum filtration and oil-fired rotary dryers, Brunswick Mining conducted extensive pilot-scale testwork on its copper, lead, zinc and bulk concentrate

    Jan 1, 1982

  • CIM
    A calibration probe for level detection systems in flotation columns

    By A. Uribe-Salas, J. A. Finch, B. J. Huls

    Froth depth or interface level is an important control variable in column flotation which can influence both grade and recovery. A common method of locating the level is based on sensing the hydrostat

    Jan 1, 1990

  • CIM
    Geological engineering aspects of the conceptual design of a radioactive waste vault in hard crystalline rock

    By M. A. Mahtab, A. S. Burgess, R. G. Charlwood, P. O. Sandstrom, J. L. Ratigan

    "Addressing a current operating and environmental concern, this paper first presents an overview of the design program for an underground radioactive waste storage vault. It then reviews the construct

    Jan 1, 1980

  • CIM
    Guyana Goldfields Flagship Aurora Project – Road to Success

    By Jon Errey, Aleksandar Petrovic, Karl Haase

    "Developing a gold deposit of this magnitude in the Amazonian jungle of Guyana posed many challenges. This paper describes not only the process & logistical challenges arising from the remote mine sit

    Jan 1, 2016

  • CIM
    Uranium In Argentina: Resources, Demand And Perspectives For Nuclear Supply

    By L. López

    Argentina reported about 40,000 tonnes of uranium (tU) as reasonably assured resources and inferred resources for the production cost category <130 US$/kgU in the OECD-NEA/IAEA classification scheme.

    Jan 1, 2020

  • CIM
    Earth Observation in Support of Mineral Industry Sustainable Development ? The EO-Miners Project

    By Stéphane Chevrel

    Non-energy raw materials are vital inputs for the EU?s economy and maintaining fair and undistorted access to these materials for EU industry and citizens is increasingly difficult. Within the EU, exp

    Aug 1, 2013

  • CIM
    Conversion of a crushing plant to a gold mill in a copper smelter

    By G. Macfarlane

    "In 1985, a crushing plant, located in the feed preparation area of Kidd Creek&apos;s copper smelter, was modified. The plant, which originally had treated only copper-bearing materials for the smelle

    Jan 1, 1988

  • CIM
    Slope failure kinematics

    By Z. M. Zavodni, C. D. Broadbent

    "Major rock slides in open-pit mines are rare, but they can develop in spite of sophisticated slope engineering design practice. Experience has shown that, except under high seismic load conditions, t

    Jan 1, 1980

  • CIM
    The measurement of radon emanation rates in a Canadian cut-and-fill uranium mine

    By J. W. M. Porritt, K. C. Cheng

    Knowledge of radon emanation rates from uranium-bearing rocks is essential to the design of mine ventilation systems for uranium mines. Measurements of equilibrium ratio between radon and its daughter

    Jan 1, 1981

  • CIM
    Copper smelting to the year 2000

    By W. G. Davenport

    Methods of extracting copper are evaluated in terms of innovations during the 1970&apos;s, and predictions to the end of this century are made. It is concluded that between one and two new smelters an

    Jan 1, 1980

  • CIM
    Environmental impact of uranium mining and milling in Australia

    By Desmond M. Levins

    "Australia has almost twenty per cent of the Western World&apos;s low-cost uranium reserves, located mostly in the Alligator Rivers region of the Northern Territory. At present, only one uranium mill

    Jan 1, 1980

  • CIM
    Proper equipment replacement timing the key to replacement economy

    By R. E. Stewart

    "Using the concept of economic life and marginal analysis, it can be shown that proper equipment replacement timing can save a mining company many thousands of dollars. To assist management with deter

    Jan 1, 1980

  • CIM
    Dense Medium Process Efficiency

    By W. Lamb

    Feed Preparation ? Five primary parameters affect the screening efficiency ? Ore characteristics ? Operational characteristics ? Screen characteristics ? Water addition and washing ? System des

    Apr 1, 2005