Optimization of Cemented Rockfill Practices for Sublevel Stoping Mining SystemBy Muhammad Zaka Emad
ABSTRACT: Sublevel stoping mining methods with delayed backfill employs cemented rockfill (CRF) as a backfill material. It is used in underground mines to achieve ground control and reduce wall slough
May 1, 2013
-
Aspects of Wear in Mill Circuit Pumps (26c5c6b3-69c9-4fe1-85a7-a5b64099587a)By C. I. Walker
Field tests at a number of large mineral processing operations have been undertaken to better understand the wear life impact of different aspects of pump design, materials of construction and mainten
Jan 1, 2012
-
Thin Spray-On Liner: A Project Update on Current Work In Sudbury, CanadaBy C. Graham
Thin Spray-On Liners (TSLs) have been researched and in development for over two decades and yet their fully functional and widely justifiable application in mining has yet to be achieved. While the e
Aug 1, 2013
-
Investigation of the Correlation Between Homogenisation and Tensile Properties of Almgsi-AlloysBy G. Anger, J. Enser, H. Antrekowitsch, S. Koch
Homogeneous chemical composition and microstructure are always necessary, but not always attained in practice. As-cast aluminium alloys tend to have a segregation microstructure. Features of the cast
Jan 1, 2006
-
Polymer Cable Carriers: A Reliable Cable Management & Protection Solution for the Mining IndustryCarrying Energy ?Energy ?Power, data, signal, hydraulics, pneumatics? ?Needs to be conveyed from a stationary point to a system in motion ?Cable Carriers (steel and plastic), Festoon Systems,
Nov 1, 2011
-
Investigation of Hydrodynamic Flow in Heap Leaching Using a CFD Computational ModelBy J. E. Gebhardt, D. McBride, M. Cross
Heap leach processes can encounter diverse flow conditions, such as infiltration into dry ore material, drainage, perched water tables and heterogeneous materials, leading to large variations in perme
Jan 1, 2014
-
The Open-Pit Mine at Asbestos HillBy Roméo Roussin
"The yearly production from the Asbestos Hill pit is 1,550,000 tons of asbestos ore, with a yield varying between 18 and 20 % . The orebody was exposed at the top of a hill, and initial production sta
Jan 1, 1976
-
Involving Communities And Measuring The ImpactsBy D. M. Aloi
In today's evolving and globalized world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to "e
Jan 1, 2007
-
Projected Demand of Manganese Ore as Raw Material to Indian Iron & Steel Industry ? An Overview of MoilBy G. P. Kundargi
India is one of the fastest growing economies in the world. The role of the Iron & Steel industry is very important for the development of the country. Iron and steel are among the most important comp
Aug 1, 2013
-
Failure Mechanism and Damage Characterization in Axially Crushed AIMg3.5mn Aluminium TubesBy H. R. Shakeri, R. Mayer, M. J. Worswick, A. Rahem
The current focus of research and development in transportation industry is to use lightweight materials such as aluminium alloys for more structural components. In this regard, maintaining safety of
Jan 1, 2006
-
Sulphide Precipitation and Ion Exchange Technologies for Cost Effective Removal of Selected Metals in WastewaterBy A. Consigny
New "clean technologies" to treat mining and metallurgical effluents containing dissolved metals have been successfully applied at mine sites in North America and Asia, treating water flows up to 24,0
Jan 1, 2011
-
Copper concentrate pressure leaching studies at Anglo American ChileBy G. Zárate, G. Tapia
Anglo American Chile has been doing copper concentrate leaching studies at the laboratory and small pilot plant scale since 1992. Among the processes evaluated are bacterial leaching and pressure leac
Jan 1, 2004
-
Advances in Process Control of SAG Mills at Kennecott Utah Copper Copperton ConcentratorBy Mark Holdsworth
In 2002, Kennecott Utah Copper Copperton Concentrator installed an Expert Control system for optimization of their SAG and Ball milling circuits. The advanced process control has been well received an
Jan 1, 2012
-
Ammonia Nitrogen Removal by Enhanced Algae Growth – Case Study of a Subarctic Mine SiteBy Thomas Genty, Pascal Marcotte, Matthew Gillman, John Baechler
Elevated concentrations of ammonia nitrogen is a common characteristic of mine impacted water and generally results from the dissolution of undetonated explosives (i.e., Ammonium Nitrate and Fuel Oil
Jan 1, 2023
-
MacIsaac's Mining and Milling Project at Inco Limited's Shebandowan MineBy E. J. Marcotte
"INCO LIMITED'S Shebandowan Mine and Mill is located in a scenic tourist and cottage area near the western tip of Lower Shebandowan Lake, approximately 90 Km west of Thunder Bay, Ontario. This nicely
Jan 1, 1992
-
Heap Leaching Optimization For The Imouraren Deposit: Synthesis Of A Laboratory Testwork ProgramBy M. Vaillé, B. Bossé, N. Durupt, A. Michaut
Imouraren is a sedimentary uranium deposit (> 150,000 tU @ 800 ppm), located approximately 100 km North-Northwest of Agadez (Niger); its depth reaches 110 to 170 meters. For low-grades ores, heap leac
Jan 1, 2020
-
Tridem airborne conductivity mapping as a lignite exploration methodBy A. B. Barlow, D. H. Pitcher
"The Geophysics/Geochemistry Section of the Ontario Geological Survey initiated an aerial geophysical survey in the James Bay Lowlands, Cretaceous Basin area, District of Cochrane, Ontario. The survey
Jan 1, 1980
-
Modification of Feeding System for the Smelting Furnace and Other Recent Improvements at Gresik Copper SmelterBy Kenta Kusunose, Dadang Sundana, Ahmad Munib Fikry, Yosuke Unno
PT Smelting has operated the Mitsubishi Process in which feed materials are charged into the S- furnace through top lances using a pneumatic conveying system comprising 6 feeding tanks (S-Feeding Tank
Jan 1, 2019
-
Energy Conservation Measures at Syncrude Oil Sand Processing OperationsBy George J. Cymerman
Since 1978, Syncrude Canada Ltd. has been expanding steadily its oil sand mining and processing capacity while reducing unit energy requirements. At the current rate of ~180 M tonne/year oil sand, the
May 1, 2006
-
Development and Applications of Thermodynamic Database in Copper SmeltingBy D. Shishin
Continuous integrated experimental and thermodynamic modelling work is conducted in Pyrometallurgy Innovation Center (PYROSEARCH). The target is to develop a tool, which is capable to predict the comp
Jan 1, 2019