Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Estimation of Hydraulic Conductivity of Underground Rock Cavern: A Case Study

    By Zhiye Zhao, Jianping Sun, Zhipeng Xu

    "The subsea rock cavern project is an underground storage facility. For cost-effective and safe excavation, the risk caused by the groundwater seepage into the rock cavern must be addressed. As one of

    Jan 1, 2015

  • CIM
    Model-based Improvements at the Sarcheshmeh Copper Mine

    By S. Banisi, M. Pourkani, A. R. Laplante, A. Partoazar

    "Canadian experience in industrial modeling of grinding, classification, and flotation kinetics was applied at the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9 % Cu, in an effort

    Jan 1, 1998

  • CIM
    Heat Balance Control Changes- Further Steps and Safety Issues

    By T. Kho, W. Zhang, M. E. Reed

    The control of flash furnace heat balances is critical. Suspension smelting control and stability comes from stable operation of the heat balance, and this leads to a stable reaction shaft exit temper

    Jan 1, 2019

  • CIM
    Peirce-Smith Converters: Automation, Design, Operation and Environmental Improvements at Kansanshi Copper Smelter

    By David deVries, James Rajith, Paul Mascrenhas, Nurzhan Dyussekenov, Lawrence Hanschar

    Kansanshi Copper Smelter commenced operation in March 2015. The smelter features four Peirce- Smith Converters (PSCs) operated in a three hot, two blowing configuration. This paper describes some of t

    Jan 1, 2019

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing

    By M. Redfearn

    "DUST COLLECTION EQUIPMENT LIST Primary Dust CollectorModular Mikro-Pulsaire - Model 2G1-96TR Capacity: 20,000 c.f.m.Bags: Total of 288; 8' x 4 1/2"" diameterMaterial: Dacron HCE feltAir to cloth rati

    Jan 1, 1976

  • CIM
    Advanced Blasting Technology for Large Scale Destress Blasts at Brunswick Mine

    By Qian Liu

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick Mine. Two large regional pillars were established on the 1000 m Level to support the ground for safe extra

    May 1, 2003

  • CIM
    Gold Marketing Initiative: Steering Committee findings and recommendation

    Building off the enthusiasm generated by Credit Suisse First Boston on the potential benefits of an industry-wide effort to market gold jewellery, a group of gold producers, led by Randall Oliphant, C

    May 1, 2002

  • CIM
    The exothermic behavior of intermetallic reactions in the assimilation of manganese additions in liquid aluminum

    By K. Sun

    The exothermic behavior of the intermetallic reactions inside an Al-Mn metallic powder compact and its assimilation fundamentals in molten aluminum were examined. In this study cylindrical compacts we

    Jan 1, 2004

  • CIM
    Influence of Desorbed Species of Xanthates and Dialkyldithiophosphates on their Collecting Ability

    By V. I. Ryaboy, S. A. Kondratyev

    "The paper describes influence of desorbed species (DS) of a number of xanthates and higher dialkyldithiophosphates on the collective ability of these reagents. Adsorbed on mineral DS of the reagents

    Jan 1, 2016

  • CIM
    Giant Earthquakes are Occurring at Lunar Phases Specific to Each Subduction Zone

    "Here, we statistically proved that giant earthquakes occur at lunar phases specific to each subduction zone. Enough attention during the lunar period, especially when seismicity is occurring, will si

    Jan 1, 2015

  • CIM
    Constitutive Model for Mechanical Properties of Highly Porous Organic-Rich Chalks from Central Israel

    By S. Feinstein, I. Reznik, Y. H. Hatzor, O. Shitrit, Y. O. Rosenberg, H. J. Vinegar, S. Nguyen

    "We report the effects of porosity and total organic carbon (TOC) content on the mechanical behavior of organic-rich chalks, based on laboratory measurements. The organic-rich chalks are from the Seno

    Jan 1, 2015

  • CIM
    Laboratory Flotation Separation of Inco "Bulk" Matte

    By A. Mukherjee, C. Kelly, B. Markovich, G. E. Agar, G. E. Robertson, F. Khan, B. Shea

    "Laboratory batch flotation tests were performed on a sample of bulk slow cooled converter matte (Cu:Ni = I) to optimize the time in each of the separation stages. Numerical simulations were carried o

    Jan 1, 1996

  • CIM
    Investigation of Permascand Coated Titanium Anodes in Copper Electrowinning at Glencore Nikkelverk

    By J. Gustavsson, S. Holmin, Å. Afvander, E. Rosseland, E. Zimmerman

    There are numerous advantages in replacing lead-based anodes with mixed metal oxide (MMO) coated anodes in copper electrowinning; for example, lower energy consumption, improved working conditions for

    Jan 1, 2019

  • CIM
    The Economics of Diamond Projects in the Canadian Arctic

    By Warwick Bullen

    A hypothetical economic model has been developed for diamond projects in the Canadian Arctic using data from recent exploration and mining projects. The model reflects economic conditions as it applie

    Apr 1, 2005

  • CIM
    Mine Conveyance Safety: The Evolution and Regulation of Safety Catches

    By B. Galy, L. Giraud

    "This paper compares Canadian provincial mining safety regulations regarding the use and testing of cage safety catches, including a brief history and evolution. Regulations are similar across provinc

    Jan 1, 2016

  • CIM
    Influence of Low Iron Inputs on Impurity Co-Precipitation in Teck’s Iron Removal Processes at Trail Operations

    By B. R. Neufeld, M. G. Heximer, S. J. Roach, W. G. Van Luven, D. G. Reynolds

    "Teck Metals Ltd. operates an integrated zinc-lead complex at Trail, British Columbia, Canada. In the zinc plant, zinc concentrates are roasted to produce calcine, which is then processed in the leac

    Jan 1, 2016

  • CIM
    Conflict Impact Assessment Between Objects in a BIM System

    By Yi-Chun Lin

    Mechanical/Electrical/Piping (MEP) systems, due to their complexity and diversity, are the most intricate part of building construction. This being the case, Combined Services Drawings (CSD) and Struc

    Aug 1, 2013

  • CIM
    How 3D Images Support Rock Engineering

    By Andreas Gaich

    COMBINED 3D IMAGES _ Highly detailed 3D geometry _ Identification of fine fractures together with a general impression of the situation _ Dealing with unfavourable outcrop geometries

    May 1, 2009

  • CIM
    Pelletizing and agglomeration

    By D. Maddocks

    "IntroductionThe greater part of the iron ore industry in Canada is located along the Labrador-Quebec border on a geological formation known as the Labrador trough. The Labrador trough is a 700 · mile

    Jan 1, 1989

  • CIM
    Zero Gravity Dry Environment Mineral Separation

    By A. Taylor

    This paper considers mineral processing in zero gravity dry environments typical of asteroids or comets. The electro-dynamic separation technique using pneumatic flow systems is explored. Pneumatic de

    May 1, 2001