    Biooxidation of a High Arsenic-Bearing Refractory Gold Ore

    By Linlin Tong, Xiangling Song, Guobao Chen, Zhenan Jin, Hongying Yang

    Biooxidation of a high arsenic-bearing refractory gold ore was investigated to determine the arsenic removal efficiency by the cultured bacteria and to examine the effect of biological pretreatment on

    Jan 1, 2014

  • CIM
    Follow-up of production equipment availability and its contributing factors in selected Canadian underground mines (c91cec33-4a50-430e-af5f-a02039dc2e40)

    By D. Komljenovic, E. Lafontaine, J. Paraszczak

    Availability of the production equipment used in underground mines has a substantial impact on production costs and, thus, on mine profitability. Appropriate collection of pertinent data and informati

    Jan 1, 2008

  • CIM
    Electrodeposition of Cobalt Metal: Effect of Sodium Octyl Sulphate

    By B. C. Tripathy, S. K. Padhy, R. K. Paramguru, Pinak Patnaik

    "Cobalt is regarded as technology enabling metal among the less abundant metals found in the earth crust. Electrodeposition of the metal from aqueous sulphate solutions is the preferred technology for

    Jan 1, 2016

  • CIM
    Report on the Rockburst Situation in Ontario Mines

    By R. G. K. Morrison

    By arrangement between the Ontario Mining Association and Messrs. John Taylor & Sons, Mining Engineers, 6 Queen Street Place, London, E.C.4, the writer was engaged for a period of not more than three

    Jan 1, 1942

  • CIM
    A Chemical Survey of Alberta Coals

    By Edgar Stanfield

    Since April, 1923, the Scientific & Industrial Research Council of Alberta has had an analyst, Mr. W. P. Campbell, steadily employed analyzing coal samples taken by the provincial Mine Inspectors. Mr.

    Jan 1, 1925

  • CIM
    Electric-field-ratio Profiling at the Silsilah Tin-bearing Greisen Deposit, Kingdom of Saudi Arabia

    By Charles J. Zablocki, Robert J. Kamilli

    "Buried, possibly mineralized granite cupolas at the Silsilah tin deposit in Saudi Arabia (lat. 26°06' N, long. 42°40' E) have been successfully located using a closely spaced electric-field

    Jan 1, 1993

  • CIM
    Recent Advances in Geophysical Prospecting

    By Hans Lundberg

    PREFACE THE successful conclusion of all geophysical work depends on the operator's skill and sound judgment, as well as on his knowledge of geology and geophysics. We have been fortunate enough

    Jan 1, 1937

  • CIM
    West Bay Fault

    By N. Campbell

    "The fault under consideration follows a northerly trend past the west; side of the original settlement of Yell ow knife; which is situated 600 miles; north of Edmonton and 400 miles from the Northern

    Jan 1, 1954

  • CIM
    The Present Situation in the Mining Industry of New Brunswick

    By W. J. Wright

    Summary This paper describes the general situation of the mining industry in New Brunswick, and gives a detailed description of the recent developments in the antimony deposits at Lake George and the

    Jan 1, 1931

  • CIM
    Structural Equation Modelling of Leaching of Oxidized Copper-Cobalt Ore in a Hydrochloric Acid Solution (d1bb6c1c-b49b-45ef-b105-a03ee63ff41f)

    By M. B. Kime

    "A set of experimental batch leaching tests studied the effect of pH, time, temperature, and stirring speed on the relative Cu, Co, Ni, and Fe leaching yields of an oxidized copper-cobalt ore sample i

    Jan 1, 2017

  • CIM
    Simultaneous Optimization of Ultimate Pit and Production Scheduling Using a Heuristic Approach

    By A. K. Mahto, B. Samanta

    "A heuristic model was developed to simultaneously generate the ultimate pit and production scheduling at a mining project. The method consists of a preprocessing step to select a starter pit, the imp

    Jan 1, 2017

  • CIM
    Are We Overtaxing Our Resources?

    By Peter M. Watt

    The objective s of this paper are: (a ) to examine and discuss the burdens we place on our extractive industry; (b) to compare the levels of taxation in Canada with those in other countries; and ( c)

    Jan 1, 1977

  • CIM
    Engineering design for a ferric chloride leaching plant to leach complex base metal sulphides

    By R. A. May, P. J. Brooks, W. M. Smith

    "Neill and Gunter Limited (NGL) has prepared a preliminary design and a cost estimate for a ferric chloride leach plant to recover copper, lead, zinc, and silver from a typical complex sulphide ore. T

    Jan 1, 1997

  • CIM
    Reservoir Analysis of the Redwater Pool

    By I. Haskett

    ABSTRACT The Redwater pool, in north-central Alberta, was discovered in October, 1948, and at the end of 1950 was about 85 per cent developed. Production is from a Devonian coral limestone reef and i

    Jan 1, 1951

  • CIM
    Exploration significance of the emplacement and genesis of massive sulphides in the Main Zone at the Norita Mine, Matagami, Quebec

    By W. H. MacLean, P. J. MacGeehan, A. J. Bonenfant

    "The Norita deposit is an Archean volcanogenic-exhalative Fe-Zn- Cu sulphide accumulation of the distal type, consisting of six overlapping stratiform massive sulphide lenses, interbedded with exhalat

    Jan 1, 1981

  • CIM
    Synthetic Testing for Flotation

    By C. G. McLachlan

    INTRODUCTION The work described in the following paper was under-taken with a view to determining, if possible, the relative importance of some of the phenomena on which flotation seems to depend, in

    Jan 1, 1926

  • CIM
    Exploration• Expenditure, Discovery Rate and Methods

    By D. R. Derry

    This paper up-dates an earlier paper by the author on the rate of new Canadian mineral discoveries and the exploration methods which were principally responsible for these finds. He concludes that the

    Jan 1, 1970

  • CIM
    How One Sell-Side Analyst Values Mining Stocks

    By Greg Barnes

    Agenda ? The Mining Stock Life Cycle ? Current Environment ? Valuation ? Golds ? Valuation ? Base Metals ? Case Study ? Quebrada Blanca Hypogene Commodity Investment Cycle ? Macro-Economic Indi

    May 1, 2010

  • CIM
    Engineered Completions Increase Oil Recovery

    By R. W. Coburn

    The results of field experiments on wells which required stimulation indicated that engineered well-completions will cause an increase in ultimate recovery at reduced costs. Techniques and tools have

    Jan 1, 1960

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 2

    By D. Berkley

    The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining an

    Mar 1, 2003