Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Theoretical Approach to the Evaluation of In-Situ Coal

    By K. W. Edwards

    The formulation of a theoretical basis for the evaluation of in-situ coal through the use of geophysical logs is outlined. This involved the development of an approach to the interpretation of resisti

    Jan 1, 1978

  • CIM
    Metallurgie Hoboken-Overpelt?s Zinc Electrowinning Plant

    By E. Van Den Neste

    A concise historical review is given of the Overpelt plant and the general principles of zinc hydrometallurgy are briefly outlined, together with a description of the new electrolytic zinc plant ore r

    Jan 1, 1977

  • CIM
    Underground Mining at Rio Tinto (c7c56392-f932-47d1-9671-af3125a26a3d)

    By C. R. Julian

    MECHANIZATION During the last fifteen years, numerous attempts have been made to mechanize the operations of loading ore and placing till. It is to be regretted that, to date, little progress has be

    Jan 1, 1940

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "Abstract - The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the La Joya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein (BPV)

    Jan 1, 1997

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia (5a50eab3-2567-48d0-8c87-7819113638f7)

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the LaJoya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein(BPV) type, with a

    Jan 1, 1997

  • CIM
    The Distillation of Calcium and Magnesium

    By I. I. Betcherman

    INTRODUCTION A DISTILLATION process offers one of the most effective methods of refining metals. Its use is particularly attractive in the case of reactive metals which are not readily treated by pyr

    Jan 1, 1951

  • CIM
    Blast-Furnace Slag Cement

    By J. A. Brothers, M. R. Foran

    "AbstractThis paper reviews the progress made in the manufacture of hydraulic cement from iron blast-furnace slag by simply grinding the granulated material with other constituents. The influence of t

    Jan 1, 1950

  • CIM
    Comparison of Uranium Solvent Extraction Strip Options (CIM Journal | Vol. 4, No. 4)

    By D. Van Tonder, C. Edwards

    ABSTRACT Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium-bearing solution prior to final product precipitation. A number of strip options are available

    Jan 1, 2013

  • CIM
    The Application of Rare Earth Element Analyses in the Exploration for Volcanogenic Massive Sulfide Type Deposits (4936ee37-b636-4400-b88e-78f06ae61654)

    By G. H. Gale, M. A. F. Fedikow, L. B. Dabek

    Rare earth element (REE) data are reported for ores, sul?de-bearing rocks and host rocks from massive sul?de deposits and barren sul?de facies iron formations in Proterozoic volcanic rocks of the Flin

    Jan 1, 1997

  • CIM
    The Application of Rare Earth Element Analyses in the Exploration for Volcanogenic Massive Sulfide Type Deposits

    By G. H. Gale, M. A. F. Fedikow, L. B. Dabek

    Abstract-Rare earth element (REE) data are reported for ores, sulfide-bearing rocks and host rocks from massive sulfide deposits and barren sulfide facies iron formations in Proterozoic volcanic rocks

    Jan 1, 1997

  • CIM
    Report of Council

    The Mineral Industry of Canada in 1951 Continuance of the remarkable, successive increases in the value -of Canada's mineral production, chief basis of the nation's post-war expansion, was

    Jan 1, 1952

  • CIM
    Follow-up of the uranium reconnaissance program in northwest Manitoba

    By N. M. Soonawala

    Detailed regional geophysical and geochemical surveys, ground surveys and drilling were undertaken to follow-up the federal-provincial Uranium Reconnaissance Program (URP) over the 27,OOO-km2 Kasmere-

    Jan 1, 1979

  • CIM
    Continuous Improvements of Porcupine Joint Venture (PJV) Dome Mine's Gravity Circuit

    By T. Y. Chong, J. A. Folinsbee, M. Fullam

    PJV Dome Mine has used some form of gravity concentration since start of milling operation in 1909 to recover free milling gold. Amalgamation and conventional jigs were first used and were replaced wi

    Jan 1, 2005

  • CIM
    Progress in Coal Mining Technology

    By A. Ignatieff

    This is the first in a series of Coal Technology Reviews being prepared in accordance with a recommendation voted by the Coal Division in session at the Jubilee Meeting, Vancouver, April, 1948, that t

    Jan 1, 1948

  • CIM
    CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines

    By CIM Mineral Resource, Mineral Reserve Committee

    The CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (MRMR Best Practice Guidelines) were prepared by the Canadian Institute of Mining, Metallurgy and Petroleum's (CIM

    Nov 29, 2019

  • CIM
    Stratigraphy and Structure of the Corbin Coalfield, British Columbia

    By B. R. MacKay

    Introduction The Corbin coalfield is one of the smallest, and at the same time one of the principal, producing bituminous-coal areas in southeastern British Columbia, and is unique on account of the

    Jan 1, 1931

  • CIM
    Transportation of Paste Backfill: Mouska Mine Case Study

    By Emilie Williams

    Introduction Mouska Mine, Doyon Division site Background and timeline Obstacles to standard paste delivery system Components of Mouska paste system Technical considerations Operational considera

    Oct 1, 2010

  • CIM
    No. 8 Shaft, Britannia Mines

    By Paul W. Billwiller

    Introduction In 1937, the Britannia Mining and Smelting Company, Limited, was carrying on an extensive exploratory diamond-drilling programme. Most of this drilling was done on the 4100 level, the

    Jan 1, 1946

  • CIM
    The Origins of Pressure Hydrometallurgy

    By F. Habashi

    The pioneer work on pressure hydrometallurgy was conducted in Russia at the end of the nineteenth, and the beginning of the twentieth centuries, by Karl Josef Bayer (1847-1904) and Vladimir Nikolyevit

    Jan 1, 2004

  • CIM
    Stratigraphy, Structure, and Geochemistry of the Halfmile Lake Massive-Sulfide Deposit, New Brunswick

    By Robin N. Adair

    Abstract -The Halfmile Lake stratiform volcanogenic massive-sulfide deposit consists of pyrrhotite­ rich breccia-matrix sulfides and pyrite-pyrrhotite-rich layered sulfides that form a laterally conti

    Jan 1, 1992