Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau

    "In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha

    Jan 1, 2008

  • CIM
    ILTEC Technology – New Pathways towards Safe and Effective Cooling

    By T. Lux, M. Hanel, Degel, A. Filzwieser, R., H. Joubert

    It is the increasing demand for an economic and cost saving operation mode that requires effective cooling in order to achieve low refractory wear and good furnace lifetime, which is making cooling te

    Jan 1, 2019

  • CIM
    Small-scale mining using the modular gold processing unit at the Granada mine, Rouyn-Noranda, Quebec (d2911615-1db3-4ddc-ae0e-f3be18f048cf)

    By P. Trudel, É. Cabot, L. Cabot

    "A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the projec

    Jan 1, 2003

  • CIM
    Using Rock Physics for Constructing Synthetic Sonic Logs

    By I. O. Ojala

    Detailed knowledge of velocity-depth trends is essential for constructing well-to seismic ties, determining background velocity and generating synthetic seismic traces for interpreting seismic amplitu

    May 1, 2009

  • CIM
    A Simple Gravity-Recoverable Gold Test

    By Jason Clarke, André R. Laplante

    "The gravity-recoverable gold (GRG) ore characterization test was developed 15 years ago and has been applied to hundreds of ore samples. The test accurately determines the size distribution of GRG, a

    Jan 1, 2006

  • CIM
    "Dacum" at the Carol Project

    By G. Taylor

    "The Iron Ore Company Of Canada's Carol Project is located in Labrador City, Newfoundland. Labrador City is some 912 air kilometers northeast of Montreal, and 417 ratl kilometers north of Sept-Iles, Q

    Jan 1, 1982

  • CIM
    Mine-Mill Waste Water Treatment at Brunswick Mining

    By D. M. Fraser

    "Brunswick Mining and Smelting Corporation Limited operates two mines; one open pit (No. 6) and one underground (No. 12), approximately 20 miles south-west of Bathurst, New Brunswick. Both are massive

    Jan 1, 1980

  • CIM
    Committee Bay Project ? Gold and Diamonds in Nunavut

    By Dean McDonald

    The Committee Bay Greenstone Belt extends over 300km and is one of the largest unexplored greenstone belts in North America with excellent gold and diamond potential. Committee Bay Resources Limited h

    May 1, 2004

  • CIM
    Emperical Design of Stopes for the Lower Rodeo Orebody

    By Denis Thibodeau

    The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the

    May 1, 2002

  • CIM
    Barrick Gold Corporation - Est Malartic

    By Pierre Pelletier, Christian Pichetie, Dany Pelletier

    "IntroductionDuring 1994, Barrick Gold Corporation, or American Barrick at that period, acquired Lac Minerals Ltd. properties. One of them was the Bousquet Complex. The Bousquet Complex is divided int

    Jan 1, 2000

  • CIM
    Iron Control in Hydrometallurgy: The Positive Side of the Coin

    During the hydrometallurgical processing of the major base metals Cu, Zn, Ni and Co, the presence of iron is normally a serious complication, and iron separation from the pay metals usually constitute

    Jan 1, 2006

  • CIM
    A Two-Phase Backfill Approach to Dilution Control at the Doyon Mine

    By Emilie S. Williams

    The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping

    Oct 1, 2004

  • CIM
    Milling at Agnico-Eagle Gold Mines Limited

    By K. Mikulash

    "Agnico-Eagle Mines Limited is located at Joutel in North-Western Québec. The mine is about four miles north-west from the town on the left bank of the Harricana River. The present mining is 1,800 fee

    Jan 1, 1976

  • CIM
    In situ acid leaching of copper tailings deposits: A case history

    By C. D. Shackelford, J. F. Muñoz, M. Vauclin, P. Rengifo, A. Suazo

    The results of a field-scale study involving in situ leaching of copper ore tailings using sulphuric acid as the leaching agent, injection wells to introduce the leaching solution and extraction wells

    Jan 1, 2001

  • CIM
    Regulation and the Regulatory Process in the Mineral Industry

    By F. C. Lendrum

    "This paper had its origin in a panel discussion organized by the Canadian Uranium Producers Metallurgical Committee (CUPMC) at their Annual Meeting in Blind River in May, 1964. The reason for the pan

    Jan 1, 1986

  • CIM
    Chapter III- Continued - Part 6.-Porcupine-Ramore Area - Structural Relations of the Porcupine Ore Deposits

    By W. Roy Dunbar

    "The Porcupine area is in northern Ontario at the intersection of N. Lat. 48° 30' and 81° W. Long. It is 125 miles due north of the Sudbury nickel range. Practically all the mineral production of this

    Jan 1, 1954

  • CIM
    Twelve Technology Tools to Design and Optimise the Production Chain from Resource to Product

    By Rob Morrison, Peter Cameron

    "Many products and technologies have been developed from outcomes of research projects carried out by the Julius Kruttschnitt Mineral Research Centre (JKMRC). When these products and technologies are

    Jan 1, 2003

  • CIM
    Rock Mass Characterisation and Stope Design

    By Karina Forster

    Rock mass characterisation is a critical component of effective stope design. Unexpected excessive stope dilution or uneconomic stope sizes can be the result of rock mass characterisation that is not

    May 1, 2006

  • CIM
    Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine

    By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh

    "The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.

    Jan 1, 1999

  • CIM
    Spontaneous Combustion - A Coal Mining Hazard

    By R. N. Chakravorty, K. K. Feng

    "There is growing evidence that modern methods of mining coal increase the risk of spontaneous combustion. Seemingly unimportant at this time, this hazard could prove to be a barrier to growth and dev

    Jan 1, 1973