Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Paper No. 188. A Graphic Method of Computing Mine Values.

    THOSE who have had occ.asion to sample a mine not infrequently find that it is impossible to take their sample cuts at regular distances apart, owing to the ground being close timbered, a stope having

    Jan 1, 1911

  • AUSIMM
    Conveying 150 000 Tonnes Per Day Per Multi Motor Drive Using Variable Frequency Start-up

    The design and selection of components for belt conveyors is a well known procedure and many handbooks, catalogues and design manuals offer a wide range of detailed information which can be applied

    Jan 1, 1978

  • AUSIMM
    Impact of Quartzite Additions on Hot Metal Silicon

    By Waters A. G, Nightingale R. J

    The quartzite added at the blast furnace for the purpose of adjusting the chemistry of the burden inputs is shown to have a disproportionate impact on both the level and the variability of the hot met

    Jan 1, 1994

  • AUSIMM
    Petrology, Geochemistry and Tectonic Implications of Magmatism in Northern Hunter Ridge-Kadavu Island Group (Fiji). (772d3817-ba1c-497f-a5a8-fb10457552d2)

    By Eggins SM, Crawford AJ, Maillet P

    The Fiji Islands are remnants of a once continuous Solomon-Vanuatu-Fiji-Tonga volcanic arc (the Vitiaz arc), located at the boundary between the Indian-Australian and Pacific plates. They record a hi

    Jan 1, 1995

  • AUSIMM
    CO<sub>2</sub> Geosequestration ù The Challenges of Capturing and Storing CO<sub>2</sub> From the Process Industries

    By B Hooper

    Deep cuts in CO2 emissions will be required to stabilise and, in the long term, decrease CO2 concentrations in the atmosphere. Technologies for capturing CO2 from major stationary sources (power stati

    Jan 1, 2004

  • AUSIMM
    The Outokumpu Lead Flash Smelting Process

    By Sulanto J, Talonen T

    In the mid 1960&apos;s Outokumpu considered building a lead Flash Smelter on the basis of Flash Smelting technology developed first in the late 1940s for smelting copper concentrates. Pilot scale t

    Jan 1, 1984

  • AUSIMM
    Research and Development in the Micron Research (W. A.) Solvent Procedure for Gold Elution from Carbon

    By Hinchliffe WD, Griffin A

    The desorption of gold from activated carbon is promoted by adding organic solvents to aqueous cyanide solutions. At 65-80¦ the elution of gold is fast and is not affected by water quality. The Micron

    Jan 1, 1984

  • AUSIMM
    The Real Sample: Variations Between Dust, Chip and Core Drilling

    By R. A. Frith, M D. Goodz

    Ore-bearing minerals that are located along microfractures are always susceptible to loss during the breakage and sampling of the material. Further losses occur with on-site sample preparation and spl

    Jan 1, 1993

  • AUSIMM
    Application of Artificial Intelligence to Real Option Project Valuation and Mine Optimisation

    This paper describes preliminary research on the application of Markov Decision Processes (MDP) to Real Option Valuation (ROV) and the optimisation of mine scheduling. The MDP framework is a novel app

    Jan 1, 2007

  • AUSIMM
    Development of Innovative, Eco-Friendly and Economic Technologies for Wealth Processing at Hindustan Zinc Limited, Visakhapatnam

    Hindustan Zinc Limited (HZL) is one of the leading base metal producers in India. It operates a two-smelter Complex at Visakhapatnam, Andhra Pradesh. At this zinc-lead smelter zinc is manufactured by

    Jan 1, 2000

  • AUSIMM
    The Intec Copper Process

    By Moyes A. J

    The Intec Copper Process uses a strong chloride electrolyte at atmospheric pressure and 80 - 85¦C to produce high purity, 99.99 per cent copper granules and elemental sulphur. A recent, exhaustive s

    Jan 1, 1992

  • AUSIMM
    Analysis of Rock Mass Classification Systems for Crown Pillar Design

    By Porter I

    Rock mass classification systems have emerged as a powerful tool which can be used for assessing ground conditions and determining support requirements in underground mines. They should not be used as

    Jan 1, 1994

  • AUSIMM
    Hydrocarbon Occurrences Offshore From the Pilbara Block

    During the past 18 months several import- ant hydrocarbon discoveries have been made in the Dampier Sub-basin, which is a sedimentary area lying entirely offshore from the Precambrian Pilbara Block

    Jan 1, 1973

  • AUSIMM
    Constraints on the Dynamics of Rifting and Denudation on the Eastern Margin of Australia: Fission Track Evidence for Two Discrete Causes of Rock Cooling (95e85735-3d90-4a78-b6e4-557395ba00bb)

    By Gleadow AJW, Foster DA, Kohn BP, Raza A

    A large and increasing data base of apatite fission track results from sedimentary and granitic rocks exposed within the southeastern highlands and along the continental margin of Australia provides

    Jan 1, 1995

  • AUSIMM
    Copper/Cyanide in the Treatment of High Copper Gold Ores

    By Staunton W. P

    The presence of cyanide soluble copper in gold ores can give rise to serious operational and economical difficulties in CIP and CIL operations. Cyanide consumption can result in the ore being uneco

    Jan 1, 1991

  • AUSIMM
    Presidential Address The Hauraki Goldfields N.Z.

    YOUR Excellency, Fellow Members of the Australasian Institute Of Mining Engineers and Gentlemen:- Nearly a decade has passed, since our Institute first met in New Zealand. May I, at the very outset of

    Jan 1, 1911

  • AUSIMM
    Alimak Vein Mining

    Martin Mining and Tunnelling Pty Ltd is a mining contractor with offices in Kalgoorlie, WA, Australia and Timmins, Ontario, Canada.Martin Mining and Tunnelling Pty Ltd offers services in mine contract

    Jan 1, 1993

  • AUSIMM
    Improving Efficiency of Sealing Off Water by Pregrouting

    AND INTRODUCTION The Lochiel coal deposit, a large Tertiary soft brown coal deposit in the mid north of South Australia, is currently being investigated by the Electricity Trust of South Australia (

    Jan 1, 1988

  • AUSIMM
    The Application of Hydraulic Stowing Partially Deslimed Mill Residue in Stopes at Broken Hill South Limited (34d64f53-9747-4881-ab11-c0a50efcc88b)

    The South Mine, property of Broken Hill South Limited, is situated at Broken Hill, NSW, Australia, towards the southern end of the main lode. The leases (MLs 7 and 8) cover a length of 2400 feet along

    Jan 1, 1994

  • AUSIMM
    Grade Control at the Yandi Iron Ore Mine, Pilbara Region, Western Australia ù Comparative Study of the Blastholes and Reverse Circulation Holes Sampling

    By B Menzel, M Wlasenko, J Phillips

    Yandicoogina (Yandi) open pit mine is located in the eastern part of the Pilbara region of Western Australia. It hosts pisolitic iron-oxide mineralisation distributed within a meandering paleoriver ch

    Jan 1, 2007