Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Chronostatistics ù A Powerful, Pragmatic New Science for Metallurgists

    Forty years ago Dr Pierre M Gy, a metallurgist, introduced variography as applied to monitoring a process. Consequently, his followers used the variogram to elaborate meaningful process control charts

    Jan 1, 2006

  • AUSIMM
    Characterising the Blasting Properties of Iron Ore

    By A Scott, I Onederra

    Most iron ores occur in mine benches as complex mixtures of lithologies and ore types. This significantly complicates their characterisation for both blast design and fragmentation modelling. A great

    Jul 13, 2015

  • AUSIMM
    Integrated Planning, Mining and Rehabilitation for Effective Results and Sustainable Land Use - A Western United States Perspective

    By V Pfannenstiel

    The United States (US) coal mining industry has been working under comprehensive planning, operating and rehabilitation regulatory requirements for nearly 35 years. The public desire for environmental

    Jul 10, 2012

  • AUSIMM
    Live Track Railroad Tunnel Repair and Clearance Improvement in the United States

    By J Schrank

    Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking

    Sep 17, 2014

  • AUSIMM
    Innovative digital tools shaping the future of sustainable sprayed concrete operations and operator training

    By P Oikkonen

    Sprayed concrete has played an integral role in underground rock support for nearly a century. However, concrete is also considered to be one of the biggest environmental problems in construction and

    Mar 29, 2023

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • AUSIMM
    Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling

    By R Dimitrakopoulos, R Senécal

    This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st

    Nov 24, 2014

  • AUSIMM
    A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USA

    By R H. Knight

    Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or

    Aug 18, 2014

  • AUSIMM
    Mine productivity and equipment selection impacts with operational grade engineering

    By A F. von Wielligh, M Scott, L Keeney

    Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine

    Nov 10, 2020

  • AUSIMM
    Joint Simulation of Correlated Variables Using High-order Spatial Statistics for Orebody Modelling

    By R Dimitrakopoulos, I Minniakhmetov

    Geostatistical simulation techniques are used to quantify uncertainty of spatial attributes of interest describing mineral deposits, petroleum reservoirs, hydrogeological horizons, environmental conta

    Nov 24, 2014

  • AUSIMM
    Analysis of horizontal opening stability in lunar regolith

    By N Barnett, M Dello-lacovo, J Oh, S Saydam, T Pelech

    In-Situ Resource Utilisation and Off-Earth mining require the application of horizontal drilling. The stability of such openings is challenging when excavating in the lunar regolith. Excavations on th

    Nov 29, 2022

  • AUSIMM
    The Bong Mieu Gold Project, Phuoc Son û Tam Ky Suture, Central Vietnam

    By T Sirinawin, R H. Murfitt, W Shywolup

    The Bong Mieu Project lies within the Pre-Palaeozoic Kontum Craton near the southern margin of the regional Phuoc Son û Tam Ky Suture. The Suture and accompanying Truongson Fold Belt of Indosinian age

    Jan 1, 2004

  • AUSIMM
    Practical Design and Operational Aspects of Bulk Solids Storage and Discharge Facilities

    By Ooms M, Scott OJ

    This paper is concerned with the design and operation of storage and discharge facilit- ies for bulk solids handling. It presents an overview of the basic design philisophy emphas- ising the influenc

    Jan 1, 1978

  • AUSIMM
    Discovery, Exploration and Investigations of Phosphate Deposits in Queensland

    Broken Hill South Limited's discovery of phosphate deposits in the northwest of Queensland in 1966 prompted intensive exploration which has proved phosphate rock in excess of 2,000 million tons

    Jan 1, 1971

  • AUSIMM
    Kicking the Bucket - A Case Study of Evolving Domains and Geological Modelling, Sunrise Dam Gold Mine, Western Australia

    By F Clark, B Catto

    The Mako domain comprises the Mako lodes at Sunrise Dam Gold Mine, Western Australia. This domain was initially bulk or æbucketÆ domained for the open pit resource in 2000, due to complexity in defini

    Jan 1, 2009

  • AUSIMM
    Life on the Rollercoaster - Mining and Milling the Kencana K1 Orebody, Indonesia

    By R Benton

    Since commencement of underground production in March 2006 the Kencana K1 orebody has delivered over 0.9 Mt of ore containing 1.18 Moz Au until April 2009. The Kencana deposits are part of the Gosowon

    Jan 1, 2009

  • AUSIMM
    Pre-Charge Coke Screening and Weighing at Newcastle No.3 Blast Furnace

    By De Jong HJ

    During the forthcoming reline of No.3 Blast Furnace at the Newcastle Steelworks of the Broken Hill Proprietary Co. Ltd., facilities for the screening and weighing o' coke will be installed. T

    Jan 1, 1984

  • AUSIMM
    Resilient Design of Large Open Pit Slopes

    By S M. Arndt, D Tyler, F Reusch

    Although significant advances have been made in understanding the mechanics of pit slopes, numerical modelling hasnÆt significantly impacted on the reliability of the design process. It is well known

    Jan 1, 2007

  • AUSIMM
    The Effect of Titanium on Reduction Degradation of Iron Ore Agglomerates

    By K Kinnunen

    A strong correlation between the reduction degradation index (RDI) of production sinter and the titanium content of the sinter mix was identified at the Ruukki sintering plant between 2000 and 2004. T

    Jan 1, 2007

  • AUSIMM
    Minimising Arsenic and Mercury Mobility With Acid Rock Drainage, Northland, New Zealand

    Remnants of Plio-Pleistocene hot spring systems in Northland, New Zealand contain sulfide minerals, principally pyrite, marcasite and cinnabar. The climate is warm temperate to subtropical, with up to

    Jan 1, 2003