Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Comparison of Fluid Origins and Compositions in Iron Oxide-copper-gold and Porphyry-Cu (Mo-Au) Deposits

    By B Rusk, L Corriveau, P Emsbo, R P. Xavier

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Porphyry-Cu (Mo-Au) deposits and iron oxide-copper-gold (IOCG) deposits are both characteri

    Mar 18, 2015

  • AUSIMM
    Ground Support Selection and Performance Considerations in Seismically Active Mines

    This paper presents a rationale for selecting appropriate support elements which combine to form a support system to maintain stability in mines subjected to both strainburst and the shaking that occu

    Nov 25, 2010

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Development and Implementation of Major Hazard Management Plans

    By D Hume

    During 2001 the Ridgeway Gold Mine, driven by company initiatives and recent NSW legislation (General Rule 2000), developed and implemented Major Hazard Management Plans to control significant hazards

    Jan 1, 2002

  • AUSIMM
    The Application of Automated Samplers in Copper/Nickel Processing

    By J E. Powalisz

    "The application of automated sampling techniques can help to provide a representative sample of process fluids and slurries that provide data for controlling process, custody transfer and quality ass

    Jul 29, 2014

  • AUSIMM
    Effects of Open Fire on Ventilation in Coal Mines

    By S K. Ray

    Open fire in a mine gallery causes large-scale damage to property and sometimes precious lives. Such fires produce two distinct effects, the throttle effect and the buoyancy effect. These effects dist

    Jan 1, 2005

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    A Multibody Simulation Solution to Analyse Attachment Kinematics of Hydraulic Excavators andáOther Linkages

    By M Dietrich

    The paper describes an efficient method for analysing the different attachment kinematics of excavators and other linkages by taking into account digging forces, the workspace and the stability of the

    Sep 26, 2011

  • AUSIMM
    The Paulsens Transformation – A Shining Light under a Northern Star

    By C Jones

    When the Paulsens operation was poised to be placed on care and maintenance, Bill Beament and the rest of the Northern Star Resources (NSR) team capitalised on the opportunity to send the Ashburton re

    Mar 24, 2014

  • AUSIMM
    How a frontline planning and commitment system improves trust, commitment and results in operations

    By G Britton, P Moynagh

    As more than a few mines gradually sink under the weight of emails, whiteboards, notice boards and ever more complex spreadsheets, the holy grail of effective short-term interval planning and control

    Oct 16, 2017

  • AUSIMM
    Protection of ?Tunnels in their Future Environment

    By A L. Bennett

    It is well understood that designers and constructors must protect the existing surroundings of tunnel construction, particularly in the selection of excavation methods, ground support and waterproofi

    Sep 17, 2014

  • AUSIMM
    The use of collaboration and management to turn-around the performance of a failing copper mine

    By M Jacobs

    This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo

    Jun 22, 2022

  • AUSIMM
    Why I don’t believe in reconciliation

    By S Dunham

    For decades we’ve been focusing on reconciliation as a tool to validate mineral resource estimates. And for decades we’ve been misleading ourselves. The concept of reconciliation is simple. Predict, m

    May 24, 2023

  • AUSIMM
    Sustainable Development and Tailings

    By H Jones

    The paper outlines the adoption and evolution of ‘sustainable development’ as a concept in tailings management practices in the mining industry over the last 30 years. Over 500 lives have been lost in

    Nov 22, 2011

  • AUSIMM
    The MRMR Rock Mass Rating Classification System in Mining Practice

    By D H. Laubscher

    The in situ rock mass rating system û IRMR - leading to the mining rock mass rating system - MRMR - for jointed rock masses has been used (and abused) in mining operations around the world for the pas

    Jan 1, 2000

  • AUSIMM
    Differential Cut-Off Grades

    Detailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (

    Jan 1, 2005

  • AUSIMM
    Assessing and monitoring food and feed safety – a 15 year quest for proper sampling

    By C Paoletti

    About 15 years ago the debate on the reliability of sampling procedures for agricultural food and feed commodities was initiated by a few brave scientists who questioned the representativeness of what

    May 9, 2017

  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018

  • AUSIMM
    Adjusting Initiation Direction to Domains of Rock Mass Discontinuities in Aitik Open Pit Mine

    By N Johansson, D Johansson, A Beyglou, H Schunnesson

    As demand for optimisation of mining processes increases, more attention is drawn to blast performance and fragmentation improvement. Fractures and discontinuities are among the most influential facto

    Aug 24, 2015

  • AUSIMM
    The Challenge of Waterproofing Cross Passages in Segmentally Lined Tunnel Boring Machine Tunnels

    By E P. O’Dwyer

    Segment and gasket lining in tunnel boring machine (TBM) tunnels; and sheet membrane lining systems in driven tunnels are robust waterproofing systems each with a proven history of performance in Aust

    Sep 17, 2014