Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Simulation of Flotation Feed Pre-ClassificationBy J Arola, B Kettunen, W M. Bond
Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s
Jan 1, 2005
-
The Path to Best Practice at Geita Gold MineBy M Monaghan, B S. Gregory
The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I
Sep 18, 2012
-
Knelson Continuous Variable Discharge Concentrator: Analysis of Operating VariablesBy I Grewal, B Klein
The Knelson Continuous Variable Discharge (CVD) is a continuous centrifugal gravity concentrator for high-mass yield recovery applications. It has four operating variables that enable control of mass
Jan 1, 2001
-
Getting the Most out of Technology to Drive Mine Productivity ImprovementsBy K Sommerville, J Parkinson
"Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c
Nov 15, 2016
-
A Simple Technique for Using High Energy in BlastingBy S J. Hawke, L A. Dominguez
In non-ferrous metal mining operations, it is generally necessary to crush and grind the ore to a very fine particle size to effectively liberate the contained mineral from the host rock. Fragmentatio
Aug 24, 2015
-
Application of Simulation Technology to the Design of Coal Clearance SystemsLongwall mining operations have been in place in Australia since the early 1960s. This mining method is currently used to extract the bulk of coal obtained from underground mines in Australia (CSIRO,
Sep 26, 2011
-
Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water QualityBy N Taylor, P Hewitt
The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet
Sep 17, 2014
-
Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiationBy P J. Handley
"Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock
Sep 20, 2017
-
Ventilation Upgrade at the FrogÆs Leg Mine - Case StudyBy A Llewellyn, M Varvari
The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.
Jul 1, 2013
-
Advanced Ventilation Control – An Analysis of Innovation and Environmental SustainabilityBy V S. Mutton, M J. Shearer
"The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G
Aug 31, 2015
-
Flotation launder design and the measurement of critical froth transport parametersBy B Wong, R G. Coleman
In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const
Aug 29, 2018
-
A review of the most common underground slot, winze, rise or raise designsBy E Wargem
The conventional method of underground mining involves a process known as drilling and blasting to excavate valuable ore bearing minerals through the load and haul process. Drilling and blasting proce
Mar 29, 2023
-
Strategic short-term geotechnical designBy K T. Mandisodza, T J. Cartledge
The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d
Jun 22, 2022
-
Applying control frameworks to enhance vehicle interaction technology outcomesBy P Standish
Qualitative risk assessment methods are not well suited to considering complex systems and potential interactions of new technology. As part of supporting tier one mining organisations and internation
Jun 22, 2022
-
Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagementBy C N. Hatton, K Ward
Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con
Jul 1, 2021
-
Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)By D Horacek, I K. Sheppard
Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in
Jan 1, 2007
-
Data cross validation for a newly commissioned dynamic drop test facilityBy D W. Evans
Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M
Nov 29, 2022
-
Experimental study and thermodynamic modelling of phase equilibria in the FeO-FeO1.5-SbO1.5-SiO2 system in equilibrium with metalBy C Zschiesche, alam, A Abadias Llamas, A K
An integrated experimental and thermodynamic modelling study of the phase equilibria in the FeOFeO1.5- SbO1.5-SiO2 system in equilibrium with liquid Sb and Sb-Ag metal has been undertaken to develop t
Jun 17, 2024
-
Dry concentration of low-grade magnetic iron oresBy C S. Kelsey, J R. Kelly
Australia is presently enjoying the fruits of a booming iron ore market. Expectations are that market strength will be supported in the short to medium term by increasing feedstock demands from steel
Nov 8, 2021
-
Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo
Jan 1, 2007