Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Energy Efficiency Opportunities in Milling – Improving Comminution Circuit EfficiencyBy F Musa
One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput
Aug 8, 2011
-
Secondary Copper Processing using Outotec Ausmelt TSL TechnologyBy J Wood
Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa
Aug 8, 2011
-
Managing Coal Loss Using Blast Models and Field MeasurementBy P Brown, M Nagarajan, A Green, P Dare-Bryan
Coal loss is an important issue at many coalmines, with losses of five per cent being common. The type of loss varies from mine to mine but is dependent on mine strata, the drilling and blasting proce
Aug 24, 2015
-
Trigger Action Response Plans for Diesel Exhaust ExposuresBy J Jeffery, P G. Knott, F Velge, C Evans
A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.
Aug 31, 2015
-
Water balance management 101By M Rafty, C Lane
Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the
Jul 23, 2018
-
Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper ProjectBy R Godard, J Gantumur, F Prince, C Pascoe
Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera
May 9, 2016
-
Material handling testing and control system requirements for dry stack tailingsBy R Stefansen, T Wisdom, A Nicholson, K Rahal
The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F
Jul 23, 2018
-
Photogrammetry-based mapping techniques in slope stability managementBy T Wang, D Wang
Photogrammetry-based techniques supported by traditional mapping tools are more frequently used for open pit geotechnical mapping. It fundamentally involves the collection of geological, structural an
Nov 29, 2022
-
A guide to ground disturbance permitting and managing ESG riskBy H Arvidson, B Spence, S Helm
Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc
Sep 18, 2023
-
Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical TechniquesBy D J. Bradshaw, B Lottermoser, A Parbhakar-Fox
"Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency
Sep 29, 2013
-
Automated Multi-Drills in Rio TintoBy C McHugh, F Oppolzer, B Rogers, A Stokes
Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation has more to do with improving the accuracy and consistency of mining pr
Sep 18, 2012
-
Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway ProjectBy W M. Tekano, T S. Coulter, N M. Hutt
The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell
Jan 1, 2003
-
How to Prioritise Process ImprovementsBy D J. Hill
"Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr
Sep 1, 2014
-
BioHeap® – Breaking the Grade/Recovery Curve for Nickel ConcentratorsBy J Fewings, T McCredden, S Seet, C Fitzmaurice
"Flotation of nickel sulfide ores are generally constrained by nickel grade and impurity concentrations (notably magnesium and arsenic) in the product delivered to smelters. Being a physical separatio
Oct 10, 2016
-
Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave OperationsBy G Chitombo, A Perryman, A D. Campbell, J White, B Hollis
This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable
May 9, 2016
-
Possible Heat Stress Problems Associated with Underground Mining in the NT, with Particular Reference to Woodcutters MineBy Wetzeil N
High ambient temperatures combined with high surface humidity in the north of Australia and, in particular, the northern areas of the Northern Territory can make underground workplaces relatively in
Jan 1, 1994
-
Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?By M Berry
Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w
Aug 18, 2014
-
Enhancing Risk Management in Strategic Mine Planning through Uncertainty AnalysisBy C Fricke, R Wood, P Velletri
"In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ
Nov 24, 2014
-
Effect of Mineral Density for Milling Magnetite OresBy P Holtham, W Valery, P Baguley, A Jankovic
There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m
Jul 13, 2015
-
Modelling Open Pit and Underground Production Scheduling in ConcertBy B King
A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti
Nov 24, 2014