Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Remote, Rapid and Accurate Three-dimensional Ore Waste Boundary Tracking System

    By A T. Spathis, K E. Leslie, K R. Blay

    Many open pit mining operations seek to control blasting-related movement of ore and waste to minimise loss and dilution. Tracking the movement of ore boundaries can result in the maximisation of ore

    Aug 24, 2015

  • AUSIMM
    The Benefits of Using SmartEar™at Pueblo Viejo

    By D Shuen, R Sales, D La Rosa

    Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting

    Sep 1, 2014

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Fluxing options and slag operating window for Metso’s DRI smelting furnace

    By K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye

    Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace

    Jun 19, 2024

  • AUSIMM
    Evaluating All the Alternatives to Select the Best Project Strategy

    It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p

    Jan 1, 2007

  • AUSIMM
    Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

    By T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart

    Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio

    Aug 29, 2018

  • AUSIMM
    Geometallurgical Modelling and Ore Tracking at Kittilä Mine

    By M Wortley, J Korteniemi, D La Rosa, L Rajavuori

    Geometallurgical modelling of an orebody provides benefits to a mine by gaining a better understanding of the ore characteristics and how they affect the performance of the concentrator. With this kno

    Nov 24, 2014

  • AUSIMM
    Forging Ahead - A Collaboration Between the OZ Minerals Prominent Hill Concentrator and Magotteaux to Improve Plant Performance

    By PáDeáBosscher, A Bruwier, M Weidenbach, C Philippe, T Ly, A Van Den Bosch

    In the mining business the cost of grinding media represents up to 40 per cent of the total milling cost and therefore grinding media optimisation has a direct impact on the concentratorsÆ bottom line

    Oct 29, 2012

  • AUSIMM
    A guide to reporting Mineral Resource exclusive of Mineral Reserve

    By H Arvidson, V Chamberlain, R Marinho, B Parsons, T Rowl, M Noppé, M Mattera

    With the introduction of CRIRSCO (2019) based mineral asset disclosure, Regulation S-K part 1300, 2019 (S-K1300) by the United States (US) Securities and Exchange Commission (SEC), applicable to compa

    May 24, 2023

  • AUSIMM
    Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availability

    By E Shilov, R Dixon, L Tovey

    BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit

    Nov 29, 2022

  • AUSIMM
    Preparing for Progressive Mine Rehabilitation Sign-off in Queensland

    By P Swart, A Fletcher, P D. Erskine

    Glencore Coal Assets Australia (GCAA) operates five coalmines in Queensland and has rehabilitated thousands of hectares of mined land across these sites. Accordingly, GCAA seeks to continually improve

    Jun 28, 2016

  • AUSIMM
    Generation of 3D planar failure hazard maps for pit slope management

    By D E. Tennant

    In the fields of geotechnical engineering and slope management, various software packages are used to assess the behaviour or propensity for a slope to fail. Traditional kinematic analysis calculates

    Nov 29, 2022

  • AUSIMM
    A Managed Approach to Project Insurance

    Historically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th

    Jan 1, 2007

  • AUSIMM
    Fatigue risk in your operations – real or rubbish? It actually depends

    By T Dawson, B Haskins

    Fatigue is it the newest buzz word or is fatigue a real phenomenon that is creating safety and organisational risk for you? There is no debate that fatigue is natural, and it affects us all, just lik

    Oct 16, 2017

  • AUSIMM
    New Blasting Initiation Technologies in the Mining Industry

    Alfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based

    Jan 1, 2005

  • AUSIMM
    Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?

    By S O’Connell, M Scholz, A Robertson, M L. Bloss

    The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan

    Jun 22, 2016

  • AUSIMM
    Incorporating economic variability into a strategic planning framework

    By E Holloway

    The optimisation of an open pit mine can be broadly split into two stages, the first being the ultimate pit optimisation (and subsequent stage designs), and the second being schedule optimisation. Mac

    Nov 21, 2018

  • AUSIMM
    Assessment of ground support requirements in coal burst-prone mines

    By J Watson, C Zhang, I Canbulat, C Wei

    Coal burst is defined as a dynamic release of energy within the rock or coal mass in underground coalmines that causes violent rock or coal ejection in the vicinity of mine excavations. It poses one o

    Nov 29, 2022

  • AUSIMM
    Wall Control Blasting Practices at BHP Billiton Iron Ore Mt Whaleback

    By C T. Dunbar, P A. Walker, G E. LeJuge

    A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices t

    Jan 1, 2001

  • AUSIMM
    Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro Corona

    By D La Rosa, K Caron, H Mamani, W Valery, R Diaz

    The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these

    Aug 24, 2015