Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Chirano Gold Mine Expansion – A Case StudyBy S Ellis
In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr
Aug 8, 2011
-
DeGrussa Copper Mine – mine closure experienceBy M Bellamy
The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first
Mar 29, 2023
-
SBRE – a simple, flexible and scalable framework to perform conditional simulations for uncertainty quantificationBy J Ashford, Minniakhmetov
Geostatistical simulations are the best practice for uncertainty quantification in non-linear systems. Simulations are currently undertaken on an ad hoc basis in the mining industry due to high requir
Mar 22, 2022
-
Olympic Dam Operations ReviewThe Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y
Jan 1, 1998
-
The Effect of Delay Time on Fragmentation Distribution through Small- and Medium-scale Testing and AnalysisBy O Omidi, P D. Katsabanis
The effect of delay time on fragmentation has been discussed for a long period but rarely in a satisfactory and unbiased way. Despite the efforts of many researchers, delay selection for fragmentation
Aug 24, 2015
-
Harnessing data complexity – how machine learning applies all project data for accurate resource modellingBy S Sullivan
A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in
Mar 22, 2022
-
Reactivity of Pyritic Shales From Mt Whaleback Mine Towards Ammonium Nitrate Based ExplosivesBy D K, S Freij, A Rossiter, X Han, B Feng
In mining operations, the removal of overburden to expose the ores is achieved by rock blasting using ammonium nitrate based explosives, eg ammonium nitrate-fuel oil mixtures, commonly known as ANFO.
Jan 1, 2005
-
Cover System Performance Monitoring for Tailings – Are We Doing It Correctly?By R Barritt, P Scott
Across the globe, it is a common scenario that tailings storage facilities (TSFs) are being decommissioned; however, their subsequent impact on the local environment and landscape can often be overloo
Jul 27, 2015
-
Sustainable Plant DesignBy J Kwak
Driving sustainability concepts and practices into the heart of the design process is the key to achieving a successful, sustainable plant design. Engineering design practices, tools, systems and meth
Jan 1, 2004
-
The relationship between the magnitude of impact velocity per impulse and cumulative absorbed energy capacity of a rock boltBy B Crompton, A Berghorst, G Knox
Laboratory-based dynamic testing provides an invaluable tool in the development of rock bolts for use in highly stressed, burst prone rock masses. While in most cases the laboratory-based test method
Nov 30, 2018
-
Development of State-of-the-art Connection Types for Pipe Umbrella Support SystemsBy G M. Volkmann
Pipe umbrella support systems – also called canopy tube systems – have been used successfully for tunnelling in challenging ground conditions since the 1970s. Historically, the drilling unit was the l
Sep 17, 2014
-
CIP ù Who Needs It? A Combination Circuit of Gravity, Flotation and Intensive Leach May Provide the Optimal Environmental and Cost Outcome for Gold Plants ù Stage II ù ResultsBy A McCallum, J Abols, G Patrick, G Johansen
The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold proc
Jan 1, 2004
-
Using SAP Business Objects to Deliver Actionable Information for Operators to ManagementReal-time data collection and plant historians are becoming common place in mining and processing plants. This vast quantity of data must be turned into easily accessible and actionable information fo
Sep 26, 2011
-
Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle MillBy V Lawson
Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the
Aug 8, 2011
-
Simulation Aided Engineering – Integration of Monitoring, Modelling and PlanningBy D Beck
Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o
Mar 21, 2011
-
Dredging fine tailingsBy S H. Burgmans, B Anderson
This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min
Jul 1, 2021
-
SBRE framework – application to Olympic Dam depositBy D Clarke, I Minniakhmetov
This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi
May 24, 2023
-
The risk management and cost benefits of using a total monitoring approach to managing slope instability hazards in open pit minesBy C Jacobsen, N Harries
Assessing and managing instability hazards is an essential activity when working with unstable natural slopes and excavated open pit mining slopes. Slope monitoring has become the standard technique f
Nov 29, 2022
-
Real time phosphorus analysis using GEOSCAN on belt analysers at Assmang Khumani Mine in the Northern CapeBy L A. Balzan, F Nieuwenhuys
GEOSCAN on belt analysers have been widely utilised in iron ore for nearly two decades. Since the first installations in 2003, the availability of accurate and reliable grade data has become standardi
Nov 8, 2021
-
Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation PlantBy B Newcombe
From many years practical industrial experience the author has drawn together a list of the key points to consider when embarking on a large-scale geometallurgical project. Fundamental aspects which m
Sep 5, 2011