Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine ClosureBy S Jahn, M Noel, E M. Rykaart, M Pau
Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m
Jan 1, 2003
-
Backfill Alternatives for Regional Support in Ultra-Depth South African Gold MinesBy G York
South African gold reserves extend to great depths. However, strategies for the mining of such deposits have changed only slightly over the past number of years. Regional support at depth is currently
Jan 1, 1998
-
The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)By MacDonald AJ, Raffield MP
The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin
Jan 1, 1998
-
The Acid Drainage Technology Initiative ù An Evolving PartnershipThe Acid Drainage Technology Initiative (ADTI) was initiated in 1995 by federal agencies, the National Mining Association (NMA) and the Interstate Mining Compact Commission (IMCC) to identify, evaluat
Jan 1, 2003
-
A New Metaheuristic Algorithm for Long-Term Open Pit Production PlanningBy C Niemann-Delius
The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new
Sep 26, 2011
-
Ore Shoot Targeting by Recognition of Upflow and Outflow, Low Sulphidation Epithermal Gold DepositsBy J V. Lawless
Two types of low sulphidation epithermal deposits that have different gangue mineralogies and ore shoot geometries are recognised. One has laterally near-continuous ore shoots over a significant verti
Jan 1, 1999
-
Formulating and Solving Complex Minerals Industry Optimisation Problems û A Systems Approach to Complex Systems ProblemsThe paper provides an overview of the development and content of APCOM symposia since their inception in 1961. This development is set within the context of the academic environment in which much of t
Sep 26, 2011
-
Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element DepositBy J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop
Mar 18, 2015
-
Design and Operation of Backfill Silos for Reliable High Solids Concentration DischargeThis paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri
Jan 1, 1998
-
Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse RejectCoal washery wastes comprise tailings, finer than 0.5 to 0.1 mm depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings slurr
Jan 1, 1998
-
Prefeasibility Testing of Gold Ore Samples Prior to CIP Plant DesignBy K B. Quast
During the prefeasibility stage of the mining cycle for a gold deposit, an evaluation of the ore leaching characteristics from various defined areas is essential prior to plant design. There are a num
Jan 1, 1998
-
Evolution of a Structural Framework for High-grade Iron Ore DepositsBy A R. Cruden, M S. Egglseder
The formation of banded iron formation (BIF)-hosted high-grade iron ore deposits in the Hamersley Province, Australia has been debated for decades. Although a structural control on their formation is
Jul 13, 2015
-
PIMS ù The Road to Efficient, Cost-Effective Plant OperationBy D Hunter
A production information management system (PIMS) was recently implemented at Queensland NickelÆs Yabulu Refinery. Although a strong business case was developed to justify the significant investment i
Jan 1, 2003
-
Selling Australia's Crude Oil ProductionIn 1984/85 financial year Australia produced 529 thousand barrels per day (kbd) of crude oil. By far the major contribution (453 kbd) was light waxy oil from offshore Gippsland, Victoria. When the
Jan 1, 1986
-
The Discovery and Development of Coal in South AustraliaBy Kwitko G
Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits
Jan 1, 1992
-
Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes MinesBy F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan
"Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th
Oct 10, 2016
-
Carbon distribution behaviour between molten iron and CaO-Al2O3-FeOSiO2- MgO slag at 1873 KBy G H. Park, Y J. Jun, J H. Park
The carbon solubility of the CaO-Al2O3-FeO-SiO2-MgO slag, the main system formed in the Ruhrstahl-Heraeus (RH) vacuum degasser, was measured at 1873 K to understand the effect of slag compositions on
Jun 19, 2024
-
Overview of the experimental phase equilibria studies of the Ni-Sn-S, Cu-Sb-S, Cu-Sn-S, Fe-Sb-As and Fe-Sn-As systemsBy M Akhtar, E Jak, M Shevchenko
This article presents an overview of the experimental phase equilibria studies of S-containing systems (Ni-Sn-S, Cu-Sb-S, and Cu-Sn-S) and As-containing systems (Fe-Sb-As and Fe-Sn-As). These systems
Jun 17, 2024
-
Analysis on crack distribution and evolution characteristics of gangue backfilled working face roofBy X Y. Ma, X G. Tian, P F. Zhang, T B. Zhao, Z H. Li, Z Y. Fu
This study analysed the fracture characteristics and movement process of goaf roofs under the condition of gangue backfilled mining, based on the engineering conditions of Tangshan Mine F5001 gangue b
Nov 29, 2022
-
Modelling of height of connective fractures during longwall miningBy D Adhikary, M Khanal, B Poulsen, H Guo
During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer
Nov 30, 2018