Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Unlock potential opportunities through unexplored aspects of Grade Engineering

    By P Revell, G Wilkie, P Walters, L Keeney, F Faramarzi

    Grade Engineering® is a value-driven strategy aiming to maximise benefits by exploiting intrinsic grade variability of ore deposits. It utilises a multitude of separation techniques to remove low grad

    Nov 10, 2020

  • AUSIMM
    Transformation of Iron Oxide By-Products During the Becher Process (dc24a04d-bdb5-4804-9a16-35fc2c57fc49)

    By Gibbons S. L, Ritchie I. M, Murr D. M

    Fundamental studies on the transformations of iron oxides have been carried out and related to the solution conditions in the Becher process. The results show that a number of iron oxide interconversi

    Jan 1, 1990

  • AUSIMM
    The Use of Controlled Recirculation to Reduce Heating Costs in Canada

    By McHaina D. M, Hardcastle S. G

    A description is given of an investigation into the feasibility of using controlled recirculation of warm exhaust air into the cold intake air of underground mines during winter. Canadian mines ca

    Jan 1, 1988

  • AUSIMM
    Secondary Breakage Practice at the DOZ Block Cave Mine

    By A Sinuhaji, H Kalangi, T B. Setyoko

    Ore fragmentation at the DOZ block cave mine is highly variable, both as a function of rock type and column height of draw. Initially, the mine was constructed and equipped with limited capability to

    Jan 1, 2005

  • AUSIMM
    The Soft Ground Bored Tunnel Under Sydney Airport

    The New Southern Railway (NSR) involves the excavation of approximately 10 km of single bore tunnel from Tempe Reserve, Tempe, to Prince Alfred Park (PAP). PAP is located just south of Central Railway

    Jan 1, 1999

  • AUSIMM
    The Application of Seperate Conditioning to Improve Zinc Metallurgy at Woodlawn Mines

    By Phelan JM

    Poor selectivity in the separation of two sulphides generally arises because the flotation characteristics of the coarse sizes of the valuable mineral and finer sizes of non-valuable minerals are id

    Jan 1, 1988

  • AUSIMM
    Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.

    A new approach to resource estimation at the exploration stage is emerging, based on the application of simple software techniques. The techniques combine the power of interactive graphics with proven

    Jan 1, 1990

  • AUSIMM
    Study of Soil Media with Multiple Tunnels or Cavities Using the Boundary Element Technique

    By Dif A. E N, Abdalla MH

    The effect of multiple tunnels /cavities on the stress and deformation field of the soil media was investigated by using a two dimen- sional plane strain boundary element model. The soil was conside

    Jan 1, 1987

  • AUSIMM
    Low-Grade Concentrator Regrind Circuit Upgrade at NewcrestÆs Cadia Valley Operations

    By B Clements, R Dunne, J Dioses, S Hart

    In April 2003 plant upgrades in the æLow GradeÆ Cadia Hill circuit were undertaken in order to improve concentrate quality and metal recoveries from the flotation circuit. The major changes involved:

    Jan 1, 2005

  • AUSIMM
    The Effect of Residence Time and Aeration on Coal Recovery Within the High Intensity Zone of a Flotation Machine

    By J A. Cowburn

    The high intensity zone within the Jameson Cell is the downcomer. It is largely external and separated from the flotation tank. This, together with operation of the downcomer under vacuum, rather than

    Jan 1, 2005

  • AUSIMM
    The Application of Rock Engineering Systems to Block Caving to Identify the Effective Parameters

    By M Mohammad Khani

    An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES

    May 9, 2016

  • AUSIMM
    A Ventilation System for Large Block Cave Mines

    By M Stephens, T A. Sutra

    Currently, there are several open pit mines with production rates of about 200 000 tpd of ore that are reaching the end of their economic lives. In most cases, the remaining orebody extends to depths

    Jan 1, 2005

  • AUSIMM
    Dendritic Growth in Cadmium Electrowinning: Rationalisation and Prediction

    By Grady B. V, Ault A. R, Newman O. M G, Fraser R. J, Malcolm J. McPhersqn

    In all electrolytic zinc plants cadmium is removed as an impurity prior to the zinc electrowinning stage of the process. Cadmium metal is the favoured form of this by-product and most plants use an

    Jan 1, 1993

  • AUSIMM
    Geology and Ore Reserve Evaluation at Renco Mine, Zimbabwe

    Gold at Renco occurs in association with pyrite, pyrrhotite, chalcopyrite and quartz and is confined to a series of brittle fractures and fault breccias (reefs) preferentially developed within an anas

    Jan 1, 1990

  • AUSIMM
    Dilution Control at Outokumpu Mines

    By Pitkajarvi J

    Waste rock dilution causes mill feed grade to be lower than mineral resource grade. In nickel mines relative grade decrease (dilution) may be tens of per cent because of irregular ore boundaries and

    Jan 1, 1996

  • AUSIMM
    Leaching Behavior of Gold in Iodide Solutions

    By Qi P. H

    Gold dissolution can be achieved with a number of complexing ligands, all with varying degrees of stability. Processes based on the use of halogens have been known for many years. Beside providing t

    Jan 1, 1991

  • AUSIMM
    Application of Probabilistic Seismic Hazard Analyses to Areas of Low Seismicity

    Probabilistic seismic hazard analyses (PSHA) have now gained wide acceptance in the development of design criteria for major projects. When used with regional criteria the procedures have also allowed

    Jan 1, 1990

  • AUSIMM
    Establishing the Design Parameters of a Control Blast for Long-term Stability of the Hang Wall at Rampura Agucha Mine

    By R Shrimali, P Rajmeny, L Shekhawat, A Joshi

    Rampura Agucha open pit mine has successfully been excavated to a depth of 320 m, incorporating multistage working. The key to success is the implementation of presplitting as control blast measures a

    Aug 24, 2015

  • AUSIMM
    Common Geological Characteristics of Prominent Hill and Olympic Dam ù Implications for Iron Oxide Copper-Gold Exploration Models

    The Prominent Hill copper-gold deposit is located approximately 150 km north west of Olympic Dam, on the southern margin of the Mount Woods Inlier in South Australia. Its discovery in November 2001 re

    Jan 1, 2004

  • AUSIMM
    Open Pit to Underground ù Transition and Interaction

    By P J. Terbrugge

    Many ore deposits have considerable vertical extent which is not always known at the time of commencement of mining. In many of these cases, initial mining is by opencast methods, and as ore reserves

    Jan 1, 2000