Sampling Practice at the Vera Nancy Gold MineThe efficient and profit-maximising daily and long-term management of the Vera Nancy resource depends on decisions based upon assay data. This paper examines the range of sample sources, the methods o
Jan 1, 2000
-
Which Way is the Wind Blowing Today? A Control Strategy Which Considers Meteorological Effects on Tunnel VentilationBy D J. Gray
The 4 km long Huguenot Toll Tunnel in the Western Cape region of South Africa celebrated its tenth anniversary on 18 March 1998. At present a single (South) bore with bi-directional traffic flow is op
Jan 1, 1999
-
High-Resolution Pit Water Quality Model for the Highway Reward Mine, Queensland, AustraliaBy B G. Lottermoser
Field and laboratory data combined with computational modelling have been used to predict the pit water quality for the Highway Reward mine. Open pit mining of the Highway Reward copper-gold deposit h
Jan 1, 2003
-
A Methodology for Geometallurgical Mapping and Orebody ModellingBy L Keeney
Geometallurgy is not a mechanism designed to replace current geological and metallurgical deposit characterisation but an added component required to understand orebody variability. Current geological
Sep 5, 2011
-
LIBS mineralogy – quantitative mineralogy on the beltBy D Gagnon, P Bouchard, F Vanier, E Soares de Lima Filho, J El-Haddad, M Sabsabi, G J. Wilkie, A Beauchesne, A Hamel, A Blouin, T Vaillancourt, F Boismenu, A Harhira, A Plugatyr, C Padioleau
Quantitative mineralogy is an established discipline in the geosciences and is aimed at providing mineral grade and texture information for geological and mineral processing applications. The two core
Nov 10, 2020
-
Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation ToolBy B Maybee, L Fava, D Millar
In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises
May 24, 2012
-
Storys Creek Remediation ProgramBy J Miedecke
A metalliferous mine has operated at Storys Creek from the 1890s to 1979. Storys Creek drains from a pristine catchment and National Park and remains as the most degraded stream from historic mining i
Jan 1, 2003
-
Managing floor heave in an underground longwall coal mineBy P Corbett, P Sheffield
Springvale Mine is an underground coal mine in the western coalfield of New South Wales which utilises retreat longwall mining technique. The mine encountered significant gateroad floor heave issues d
Nov 30, 2018
-
Understanding the Role of Production Drilling and Drilled Stocks in Efficient Operation of a Sublevel Cave MineBy C Beal
Proper understanding and management of production drilling in sublevel cave (SLC) mines is essential for meeting production targets and for avoiding inefficiencies that could lead to costly bottleneck
Mar 24, 2014
-
New Zealand's Geological FrameworkBy R L. Brathwaite
The rocks of New Zealand can be grouped into three main elements: the Early to Mid Paleozoic Western Province, Late Paleozoic to Early Cretaceous Eastern Province, and several overlying Late Cretaceou
Jan 1, 1997
-
Development of a damage/failure mechanisms database for Kazakhstan underground mining industryBy A Mortazavi, M Akhmedya
Mining is recognised as being one of the most dangerous industries in the world due to the difficult working conditions. Working in such hazardous circumstances in an underground mine often results in
Nov 29, 2022
-
Geologic Evolution of the Stringer Zone Underlying the Hellyer Volcanogenic Sulphide Deposit. TasmaniaBy Large RR
Underlying the 15 million tonne, high grade Hellyer volcanogenic massive sulphide deposit of western Tasmania is an extensive, well developed, and well preserved stringer system. Pervasive alteration
Jan 1, 1990
-
Some Real and Imaginary Examples of Volcanic Hazard and Risk AssessmentAn empirical method of estimating dense rock (D.R.E.) equivalent volumes erupted as airfall tephra, described in a companion paper in this volume, is elaborated, and its accuracy discussed. Estimates
Jan 1, 1990
-
Power Generation Utilising Mines GasBy Callinan AN
Broken Hill Proprietary Company Limited have recently commissioned a 14 Megawatt power station adjacent to its underground coal mining operation at Appin NSW. The power station is fuelled by metha
Jan 1, 1987
-
Cemented Hydraulic Fill Mix Design As it Applies To Mine SchedulingThe need to schedule ore production to make maximum use of the strength gained by cem- ented fill during curing is discussed, to show how cement content and hence fill cost can be kept down for any
Jan 1, 1973
-
Explosion in MiningHISTORIC SIGNIFICANCE OF EXPLOSIVES TO MINERAL PRODUCTION The ancient method of breaking rock was to build a wood fire against the face, heat the rock through and then pour water on the heated ore-
Jan 1, 1988
-
Kinetics of Impurity Removal from Steel for a Batch ProcessBy Wright G. A
The objective of refining in steelmaking is to reduce the concentration of impurity atoms, e.g. sulphur, phosphorus, from an initially high level to a specified low concentration. A two-film theory
Jan 1, 1980
-
CaroÆs Acid its Introduction to Uranium Acid Leaching in AustraliaAfter extensive testing and a period of plant trials to establish the benefits of Caro's acid (H2S05) as an alternative oxidant, Queensland Mines Limited (QML) decided to replace pyrolusite w
Jan 1, 1984
-
Design of Medium Recovery and Heavy Medium Management Circuits- A Different ApproachThe paper describes the design of the dilute medium and medium recovery circuits installed at the coal preparation plants at the Cornwall Coal Company's Fingal Mine, and the BP Coal Australia
Jan 1, 1987
-
The Physico-Chemical Basis of Pyrometallurgical ProcessesA critical appraisal of the wide variety of processes used in the pyrometallurgical production of metals and non-metals shows that there is a strong physico-chemical and, in particular thermodynam