Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic Dam

    By H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant

    "The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable

    Jun 15, 2016

  • AUSIMM
    An Emergency Dewatering Technique in Shaft Sinking and Tunnelling

    The program, WASTRT 70, was set up specifically to handle the design of tunnel liners and underground structures where inter- action between rock and structure significantly affects the design. It

    Jan 1, 1976

  • AUSIMM
    Improved Trigger Action Response Plan Development Based Upon Mine-specific Data

    By D Cliff, B Belle

    Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a

    Aug 31, 2015

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Effect of Gravity Recovery on Overall Plant Recovery, Sadiola - A Case Study

    An enhanced gravity concentrator was installed in conjunction with an intensive leach reactor at the Sadiola plant in Mali last year and commissioned in December 2007. There has been much debate over

    Aug 1, 2010

  • AUSIMM
    A New Concept in Mechanical Drives-The WABCO 120 Mechanical Truck

    This paper briefly reviews the history of mine haulage trucks. It reviews producti- vity limitations with respect to size or speed. Changing haul requirements once again create the need for more fle

    Jan 1, 1981

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Recent Developments and Investigations of D.M. Cyclone Coal Preparations at the BHP Port Kemble Washeries

    By Nightingale R, Johnson B, Bensley C, Vince A, Keast-Jones R

    In order to counter the massive increase in the level of near gravity material that would follow the reduction in dense-medium cyclone separation density at B.H.P. Slab and Plate Product Division&

    Jan 1, 1987

  • AUSIMM
    The Application of Spectrometric Coal Lithology Logging in Brown Coal Mining

    By Smith Z, Huppert P, Charbucinski J

    The paper describes a spectrometric method and apparatus developed for lithology logging in brown coal formations. The nuclear spectromet- ric technique developed is able to delineate coal/sand/clay

    Jan 1, 1989

  • AUSIMM
    A New Technique to Combat Methane Gas Hazards

    By Forrester P. I, Richardson W

    Methane in coal mines is an ever present hazard resulting in loss of lives and serious economic consequences. For effective control of methane, ventilation alone may not be totally adequate in som

    Jan 1, 1988

  • AUSIMM
    Supplementary Notes

    LESLIE BRADFORD GOLDEN JUBILEE ORATION "Not only a metallurgist but a scientist of the highest order" Leslie Bradford and the Australian Metallurgical Industry

    Jan 1, 1987

  • AUSIMM
    Fragmentation Mechanics

    The mechanisms of fragmentation in homogeneous materials and structured rock mass are reviewed. A method previously used to predict vibration damage to the remaining rock is extended and shown to be

    Jan 1, 1990

  • AUSIMM
    A Case History of the Crusher Level Development at Henderson

    By W D. Rech, K W. Keskimaki

    As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was

    Jan 1, 2000

  • AUSIMM
    The Prevention and Control of Burning in Waste Coal Dumps (e814abc3-2b0b-49ff-8a5e-6cd3cf04acc7)

    Indiscriminate surface disposal of coal waste in New South Wales has created a serious fire hazard and increased air pollution.A survey of numerous dumps, as well as particular investigations of one b

    Jan 1, 1971

  • AUSIMM
    Developments in Geosciences for Overcoming the Constraints on High Production Underground Mining

    By Hughson B

    At present sane man-made Improvements and natural features are constraints on unlimited underground mining. 7 hey will continue to remain, as constraints on the future high production mining syste

    Jan 1, 1988

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967

  • AUSIMM
    Flotation in the Warrego Concentrator of Peko Mines Ltd.

    By Lynch AJ, Musgrove NH

    The behaviour of chalcopyrite and pyrite in the rougher-scavenger and regrind-retreatment circuits in the Warrego concentrator is discussed. The effects of change in xanthate addition on the separ

    Jan 1, 1975

  • AUSIMM
    Experience at Goonyella/Riverside Mine with a Bucket Wheel Excavator System and Shovel/Truck Systems for Prestripping Overburden

    A conventional Bucket Wheel Excavator (BWE) system with conveyor transport, mobile tripper and spreader was commissioned at the Goonyella Mine in 1982. The system was introduced to prestrip ahead of d

    Jan 1, 1992

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    The Path to Successful Roof Support Automation

    The first hydraulic roof supports were installed underground in 1950s and ever since that time engineering developments have improved the supports in many different ways. However. advances in three ma

    Jan 1, 1991