Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Embracing Modern Ecological Methods - Monitoring and Modelling for Mine Closure, not Compliance

    By A M. Lechner, S Arnold, M J. Gillespie, P D. Erskine, D R. Mulligan, A T. Fletcher, A Gordon

    Mine ecological monitoring schemes are often conducted only to address compliance and in some cases do not have the sufficient statistical power or understanding of ecological systems to assess, quant

    Jul 10, 2012

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • AUSIMM
    REFLUX versus hydraulic classifier – a comparative analysis for hematite concentrate cleaning

    By E Bouchard March, F Lavoie, B Legare, K Bourassa

    Quebec Iron Ore (QIO), a subsidiary of Champion Iron Limited (Champion), completed the restart of the Bloom Lake iron ore mine located in the heart of the Labrador Trough region of Northern Quebec, Ca

    Nov 8, 2021

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    Controlled Blasting for Civil Construction in an Urban Environment

    By R Domotor

    Brisbane’s Airport Link is Australia’s largest road infrastructure project, worth a total value of A$4.8 billion. The project is using surface and underground blasting to excavate hard volcanic r

    Nov 8, 2011

  • AUSIMM
    An Integrated Economics Model for In Situ Resource Utilisation in Support of a Mars Colony

    By C Tapia Cortez, A G. Dempster, R Fradet, S Saydam, T de Roche, R Shishko, J Coulton

    Human ventures into space are entering a new phase in which missions formerly driven by government agencies are now being replaced by those led by commercial enterprises – in launch, satellite deploym

    Nov 4, 2015

  • AUSIMM
    An Alternative Genesis for Pisolites and Channel Iron Deposits in Western Australia

    The current genesis of pisolites and channel iron deposits (CID) has been defined in a way that presents CID as unique in the world. The published material on detrital pisolites mostly details the Wes

    Jan 1, 2009

  • AUSIMM
    The Reduction of Zinc Oxide

    By Hayes P. C

    The reduction of small, dense zinc oxide (ZnO) samples in CO/CO2, and CO/N2 gas mixtures has been investigated at temperatures between 900 and 1100¦C. The microstructural characterisation of the rea

    Jan 1, 1991

  • AUSIMM
    Aligning Resource Estimates with Mine Planning

    By D Kentwell

    A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma

    Nov 24, 2014

  • AUSIMM
    Geological Aspects of the Discovery of Important Minerals in Australia - Nickel Sulphide Deposits of Western Australia

    The discovery of nickel sulphide deposits at Kambalda in 1966 heralded the development of ò an industry with a capital value of over $1.5 billion producing about 10% of the western world's nick

    Jan 1, 1988

  • AUSIMM
    The development of DRI pellets for green steelmaking

    By C R. Ure

    To substantially reduce, if not eliminate, carbon dioxide (CO₂) emissions from ironmaking it is necessary to convert from blast furnace (BF) ironmaking using coking coal as the reductant to direct r

    Sep 18, 2023

  • AUSIMM
    Seismic Stability Analysis of Sangan Iron Mine Project Tailings Dam

    By N Ganjian, A Delavar, F Rashidi Nejad

    Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft

    Jul 27, 2015

  • AUSIMM
    Modelling Mine Sustainability - Indicators Based on a Comprehensible Framework

    By A Lyon

    The minerals industry, as many other industries, has a wealth of indicators and a thriving æindustryÆ in their development, measurement and reporting. It is natural for this to occur for a new endeavo

    Jan 1, 2009

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    Steve and Fred would have been mates – a comminution design evolution story

    By D David

    Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i

    Sep 11, 2017

  • AUSIMM
    Hydraulic Rock Drills in Production and Development

    The paper covers the history and develop- ment of electrical and diesel-powered hydrau- lic percussion rock drills. It examines main design aspects and problems encountered in pro- ducing an efficien

    Jan 1, 1978

  • AUSIMM
    The Influence of Liner Wear on Milling Efficiency

    By P Toor

    Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in

    Aug 8, 2011

  • AUSIMM
    Geology and Exploration of the Hamata Deposit

    By Young DJ

    Gold mineralisation at the Hamata prospect is related to a series of stacked pyrite and quartz-pyrite veins associated with a number of shears which strike N to NE and dip E. Mineralisation is con

    Jan 1, 1991

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011