Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    "Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"

    By A Esfahanipour, M Osanloo

    Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en

    Sep 26, 2011

  • AUSIMM
    Review of Variogram Properties and Remarks on its Use in Process Control

    By D M. Frantois-Bongarton

    Variograms can be powerful tools for the analysis and control of process streams and their sampling. Their uses and proper utilisation have been described somewhat unclearly to date, and their limitat

    Aug 21, 2012

  • AUSIMM
    Sampling strategy by statistical analyses of LIBS data in the context of a portable gold analyser

    By M Castello, P Bouchard, M Sabsabi, A Blouin, B Nguegang Kamwa, M Constantin, K Fytas, M Laflamme, K Rifai, F Vidal

    Canada’s Quebec province operates 26 metal mines, 19 of which are producing gold and generating over C$1.8 billion (US$1.3 billion) annually. In all those mines, numerous samples of rock are collected

    Sep 20, 2017

  • AUSIMM
    Mist Diffusion Experiment and Evaluation of Water Tube for Blasting Demolition Dust Control

    By H-S Yang, H Park, S-J Kim, Y-H Ko, H-S Kim, S-H Cho, J-K Kim

    An investigation was undertaken to devise a new method for reducing dust spread during blasting demolition utilising water tube and detonating cord. Modelling of smooth particle hydrodynamics (SPH) wi

    Aug 24, 2015

  • AUSIMM
    The Merlin Molybdenum Rhenium Deposit, Mt Isa Inlier – Two Years from Discovery to Development

    By G Phillips

    The Merlin project is situated 130 km south of Cloncurry in North West Queensland, Australia. It is located within the Pre-Cambrian Mt Isa Inlier and is grouped within the Eastern Fold Belt. The host

    Aug 22, 2011

  • AUSIMM
    Rehabilitating Post-Mining Landscapes for Wildlife - A Case Study from the Koala Venture Research Program in Central Queensland

    By F Carrick, W A. Ellis, D R. Mulligan, S I. FitzGibbon

    "One of the major environmental impacts of mining is the destruction of habitat. The koala (Phascolarctos cinereus) is an iconic Australian marsupial that has been severely affected by land clearing a

    Jul 10, 2012

  • AUSIMM
    Gold Deposits in Highly Metamorphosed Terranes

    By A G. Tomkins

    "Approximately 32 per cent of the worldÆs total gold production has come from greenstone belts (Frimmel, 2008). In these regions numerous small to large, quartz vein-associated gold deposits are hoste

    Sep 26, 2013

  • AUSIMM
    Research on supporting technology for production level roadways of block caving in Pulang Copper Mine

    By X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu

    Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the

    Nov 30, 2018

  • AUSIMM
    The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling Process

    By P Breuer, A Simons

    The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co

    Sep 26, 2013

  • AUSIMM
    Production of High-quality Sinter by Controlling the Sintering Reaction

    By Y K. Ji, B J. Chung

    In recent years, the utilisation of ultra-fine ore in ironmaking has gradually increased due to the depletion of high-quality iron ore. The use of ultra-fine ore in the ironmaking process is typically

    Jul 13, 2015

  • AUSIMM
    Resources versus Reserves – Towards a Systems-based Understanding of Exploration and Mine Project Development and the Role of the Mining Geologist

    By J P. Sykes, A Trench

    "World-class mine projects are increasingly failing to become world-class mines. Non-technical, socio-political and environmental problems seem, in part, to be the cause. However, the intangible and q

    Aug 18, 2014

  • AUSIMM
    Accelerated degradation and modified slake durability testing of clay mineral-rich coal mine spoil

    By B Miles, D J. Williams, J Ahn, T A. Vangsness

    The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act

    Jul 23, 2018

  • AUSIMM
    The Regulator's View of the Valuation of Mineral Assets in Expert Reports

    The ASC has a dual role of business facilitator and law enforcer. Only certain types of expert report are of interest to the ASC. The powers of the old Companies Code and the Corporations law are c

    Jan 1, 1994

  • AUSIMM
    Platinum Mining and Sustainability - Understanding the Environmental Costs of Future Technologies

    By G M. Mudd

    The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain

    Jan 1, 2009

  • AUSIMM
    Development of a Laboratory Flotation Method to Test Plant Mineral Aggregation

    By D Morgan, D Sato, B Lumsden, S Senanayake

    Laboratory flotation tests on fresh cyclone overflow samples are a useful tool to troubleshoot and indeed to improve plant performance; however, reproducibility between laboratory flotation test and p

    Sep 1, 2014

  • AUSIMM
    Determination of cyanide and potentially toxic elements in gold tailings at Barberton, Mpumalanga, South Africa

    By K E. Mudzanani, T A. M Msagati, D T. Maiga, T T. Phadi, M R. Letsoal, B M. Chabalala, S W. Limani

    This paper addresses critical environmental, health, regulatory and scientific concerns related to gold mining activities in the specific area of Barberton, Mpumalanga, South Africa. The paper thus ca

    Apr 16, 2024

  • AUSIMM
    The Use and Abuse of Feasibility Studies – Has Anything Changed?

    By N Cusworth, W R. Mackenzie

    "In 2007, the authors presented a framework for the conduct of resource project feasibility studies and provided guidance on minimum standards and best practice (Mackenzie and Cusworth, 2007).This pap

    Mar 8, 2016

  • AUSIMM
    Acidic Drainage From Calcareous Coarse Kimberlite Reject, Ekati Diamond MineTM, Northwest Territories, Canada

    By J Millard, K Sexsmith

    BHP Billiton Diamonds Inc (BHPB) has been mining kimberlite from several pipes at the Ekati Diamond MineTM located 300 km north of Yellowknife since 1997. Processing of kimberlite produces coarse kimb

    Jan 1, 2003

  • AUSIMM
    SAG mill optimisation and increasing throughput at the Phu Kham Copper-Gold Operation – a success story

    By D Baas, J Le, R Braun, R Chandramohan, K Hollis, G Lane

    The Phu Kham Copper-Gold Operation (Phu Kham) is located in northern Laos, approximately 140 kilometres from the capital, Vientiane. The operation is a producing asset for Australian-based copper and

    Aug 29, 2018

  • AUSIMM
    Investigating industrial feasibility of utilising magnetising roasting for goethite ore

    By N Esmaeili, M Saghaeian, L Hosseini, V Sheikhzadeh, R Hejazi

    Ore roasting has long been used for beneficiation and assay upgrading of different ores. In this process, which is mainly used for sulfide ores, the ore is heated to a high temperature. More specifica

    Aug 24, 2022