Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Water Footprint for a South African Platinum MineBy K G. Harding, E L. Haggard, C M. Sheridan
Mining is a water intensive sector, contributing to declining water resource quality around the world. Improvements to current mine water management practices can help reduce the amount of water utili
Nov 26, 2013
-
Benchmarking Energy Efficiency ù A Case Study at Macraes Gold MineBy K Osten, N Scagliotta, G Lane
Oceana Gold (New Zealand) Limited operates the Macraes Gold Mine near Dunedin on the South Island of New Zealand. The orebody is mineralogically complex and comparatively low grade requiring a series
Jan 1, 2004
-
A waste fines cell with a multitude of concurrent activitiesBy J J. Boshoff
This iron ore mine site, located in the Pilbara region of Western Australia, commenced operations in 1998, with ore derived by mining of open-cut pits in Channel Iron Deposits (CIDs). A portion of the
Jul 23, 2018
-
Challenges facing non-ferrous metal productionBy P Taskinen, D Lindberg
The increase in metals demand in the electrifying globe means significant growth in the smelting of copper, nickel, zinc, and lead, produced from primary sulfide sources or using sulfide mattes as the
Aug 21, 2024
-
The Use of Polysulfide as an Alternative Sulfidising Reagent for the CPS Flotation of Oxide Copper OresBy G Tsatouhas, R Newell, K Y. Wong
A sulfide ion selective electrode was used to control sulfidiser addition in the flotation testing of a synthetic and a naturally occurring ore containing malachite in order to compare the behaviour o
Jan 1, 2005
-
The CSA ventilation upgrade – geotechnical challenges and learningsBy T M. Brettell, D Sidea
The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre
Oct 16, 2017
-
The Interaction Between Pulp Density and Frother Addition in Coal FlotationBy Roberts T, Firth B. A
A series of flotation experiments was carried out to study the interaction between the parameters of pulp density (mass per cent of solids in feed slurry) and frother addition (on the basis of solid m
Jan 1, 1984
-
Practical Approaches to Managing Business Critical Water RiskBy A Tang, K Ringwood
"Water is increasingly being recognised as a material business risk that many companies are still not well-equipped to deal with. Despite a raft of water-risk focused initiatives, methodologies and gu
Nov 26, 2013
-
Resource Efficient Mining Processes of TomorrowBy P Holtham, K Duffy, W Valery, A Jankovic
In the face of increasing energy costs, limited water resources, more stringent legislation, and lower feed grades, the mining industry is searching for more sustainable technologies and practices. Me
Nov 4, 2015
-
Developing Resilient Water Monitoring Programs in Changing Climate ConditionsBy A D. Price, W J. Germs, O Patterson, T R. Weaver
"Understanding controls on groundwater and surface water flow and quality at mine sites throughout all mine stages is critical to effectively manage environmental impacts over the entire mine life. Mo
Nov 26, 2013
-
The Occurrence of Telluride Minerals at Kalgoorlie (eadf2a80-f865-46a6-854c-a0a51fd161e0)Incidental to the progress of a geological survey of the Kalgoorlie goldfield during 1927 - 1928 a number of specimens of telluride minerals were obtained, chiefly with the help of Mr F G Brinsden, ge
Jan 1, 1994
-
Development and Application of a Holistic Quantitative Deterministic Technique for Risk Modelling (Quadrim) in Mine ValuationIn this paper a quantitative deterministic risk modelling approach (Quadrim) is introduced. The mathematical framework and equations for quantifying uncertainty within and aggregating across value cha
Sep 26, 2011
-
Analysis of Slurry Sampling Arrangements at a Froth Flotation PlantBy P Minkkinen, J Lohilahti, T Korpela, B McPherson
Concentrator plants intake the ore from the mine and produce concentrates by extracting valuable minerals in a succession of process steps. Controlling the extraction process and detecting changes in
Jul 29, 2014
-
Identity Crisis in the Copper Industry (dcdb222c-86b4-4eae-a24d-1e2dcb5e1879)Most publicity about the copper industry nowa- days is focused on the adequacy of ore reserves and on excessive mining capacity. These concerns, stemming from public awareness of actual and poten- t
Jan 1, 1978
-
Process Development for the Marampa Iron Ore Tailings Project, Sierra LeoneBy P Dunn
Following civil war in Sierra Leone, London Mining Plc obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. The Sierra Leone Marampa mi
Jul 11, 2011
-
Discovery and Geology of the McPhee Creek Iron Deposit, Northern Pilbara, Western AustraliaBy J D. Goldsworthy
The McPhee Creek bedded iron deposit is a recent discovery made by Giralia Resources NL (Giralia) in the northern Pilbara of Western Australia. The deposit lies 30 km north of the town of Nullagine al
Jul 11, 2011
-
A Statistical Approach for Deriving Project Design RainfallBy R Millar
A frequent challenge in mine water management and mine design is estimation of precipitation and extreme rainfall given a short record of site meteorological data. For remote mine projects, typically
Nov 26, 2013
-
Newmont Waihi Operations ù An OverviewThe Newmont Waihi Operations are centred on the Martha mine at Waihi, New Zealand. The mine has produced over 6.6 million ounces of gold from both openpit and underground sources since operations bega
Jan 1, 2002
-
The Geology Of The fitzpatrick Area North Broken Hill Limited, Broken Hill, NSWIn August, 1975, North Broken Hill Limited announced that an intersection of 37.3 m of high grade lead-silver-zinc mineralisation, assaying 26.2 per cent Pb, 495 g/tonne Ag and 21.2 per cent Zn ha
Jan 1, 1983
-
Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, AustraliaBy Read T. A
THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to
Jan 1, 1921