Search Documents

  • NIOSH
    IC 8286 Crude Oil - Qualitative and Quantitative Aspects

    By Harold M. Smith

    This report presents a complete qualitative picture of knowledge of the composition of petroleum as of April 1965. The material is presented in detai 1 on two imaginative maps--one, the Hydrocarbon He

    May 1, 1965

  • SME-ICGCM
    Changes In The Seismic Properties Of The Cover Produced By Longwall Mining

    By Guoqi He

    Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within

    Jan 1, 1989

  • SME
    A Review Of Tunneling Difficulties In Carbonate Sedimentary Rocks

    By D. P. Richards

    Tunneling in carbonate sedimentary rocks such as lime stones and dolomites can be difficult when solution channels or voids are anticipated. Addressing the risk aspects associated with these formation

  • SAIMM
    The Application Of The Analytical Hierarchical Process In Complex Mining Engineering Design Problems - Synopsis

    By P. Kluge

    Mining engineers frequently encounter complex design problems for which the critical components of the design are difficult to quantify or compare. Teams of people typically work on these designs and

    Jan 1, 2011

  • ISEE
    The Odd Challenges of Backcountry Trail Blasting

    By Ed Billington, Mike Shields

    The trail blaster is faced with a wide range of workrelated challenges, not the least being the work setting itself. It is usually remote, being anywhere from 5 to 30 or more miles (8 to 50 km) from a

    Jan 1, 2004

  • CIM
    Concentration of Niobium Bearing Minerals

    By R. Biss

    "Niobium or columbium, as usually called in North America is becoming a more and more important metal in the industrial world because of its attractive properties.Eventhough discovered in the early ni

    Jan 1, 1984

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008

  • CIM
    Energy Conservation at Falconbridge Nickel Mines Limited

    By D. M. Doyle

    "In this paper I will summarized the Falconbridge Nickel Mines1) energy costs and consumption data by fuel, process, cost centre and estimate our future costs and consumption patterns 2) detail the di

    Jan 1, 1978

  • SME
    Sphericity Of Apatite Particles Determined By Gas Permeability Through Packed Beds

    By T. C. Souza Pinto

    Because shape is an assessment of the three-dimensional form of a particle, it may be described in terms of sphericity (?), which is a measure of how closely a particle approaches a spherical configur

    Jan 1, 2009

  • DFI
    An Overview Of Soil Mixing In The United States ? Introduction

    By Peter J. Nicholson

    Since the reintroduction of soil mixing to the United States over 10 years ago, the work installed by soil mixing technology has grown dramatically. From an annual turnover of less than ten million do

    Jan 1, 2001

  • NIOSH
    RI 8017 Compositional Variations of Organic Material From Green River Oil Shale-WOSCO EX-1 Core (Utah)

    By W. E. Robinson

    Differences in the composition or chemical structure of the organic material in samples of Uinta Basin (Utah) oil shale were studied relative to stratigraphic position within the Green River Formation

    Jan 1, 1975

  • AUSIMM
    Investigations of Massive Sulphide Mineralisation Along the Kermadec Arc 1996 - 2005

    By G J. Massoth, K Faure, A G, R G. Ditchburn, I J. Graham

    From modest beginnings in 1996, research into the mineral potential of New ZealandÆs Exclusive Economic Zone has progressed into a major multidisciplinary component of GNSÆs recently funded 6-year æMi

    Jan 1, 2005

  • SAIMM
    The gas-dynamic method of calculation of explosion-proof distances during explosions of methane-air mixture in mines with regard to explosion protective structures

    By D. Yu. Paleev, O. Yu. Lukashov, A. Yu. Krainov, E. R. Shrager, I. M. Vasenin

    The gas-dynamic method is presented of calculation of explosion-proof distances during an explosion of the methane-air mixture in mine working. On the basis of this method is modelled of shock waves i

    Jan 1, 2003

  • SME-ICGCM
    Outburst Control in Underground Coal Mines,

    By Floyd D. Varley

    Outbursts, the sudden and violent out- pouring of material into mine openings, is a ground control problem increasingly encountered in the United States as deeper seams are developed. Outbursts, cause

    Jan 1, 1986

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992

  • NIOSH
    IC 9498 - Proceedings Of The International Workshop On Rock Mass Classification In Underground Mining

    Rock mass classification is widely used throughout the underground mining industry—in both coal and hard-rock mines. It is used in all stages of the mining process, from site characterization to produ

    Jan 5, 2007

  • SAIMM
    The Control Of Inclusion Composition To Prevent The Rust Formation For Ferritic Stainless Steel

    By S. Kitamura

    In recent years, the amount of ferritic stainless steel production has increased. However, the rust formation by the salt spray test was pointed out in the past. At the centre of the circular rust zon

  • NIOSH
    OFR-59(3)-73 Phase II Final Report - Volume 3 Of 3 - Feasibility Study Of Surface Impregnation Equipment For The Chemical Stabilization Of Coal Mine Structures

    This report summarizes the work performed and results achieved on the above contract from October 18, 1971 through July 14, 1972 under Phase II, Task 1: Detailed Design of Prototype and Task 3: Suppor

    Jan 1, 1972

  • SAIMM
    Modelling Explosive/Rock Interaction During Presplitting Using ALE Computational Methods

    By R. P. Jensen

    This is a sampling of the papers presented at the conference, the proceedings can be bought from the SAIMM Arbitrary Lagrangian Eulerian (ALE) computational techniques allow treatment of gases, liq

    Jan 1, 2000

  • SME
    Owner Procured Tunnel Boring Machines––A Discussion

    By A. R. Biggart, A. Walters, G. J. E. Kramer

    The Owner Procurement Process or OPP is a proven, viable alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures ma

    Jan 1, 2005