Search Documents

  • SAIMM
    Interpreting The Role Of Reagents In The Flotation Of Platinum-Bearing Merensky Ores

    By J. G. Wiese

    Reagents are added to the flotation process of Merensky Reef ores to achieve specific functions that enable the separation of valuable minerals from gangue minerals on the basis of the difference in t

    Jan 1, 2006

  • AIME
    Part VIII – August 1969 – Communications - Convective Flow in Tin

    By F. Weinberg, L. MacAulay

    DAVIS,' in an investigation of solute redistribution along molten rods of dilute silver in tin, concluded that at horizontal temperature gradients below approximately 5°C per cm very little conve

    Jan 1, 1970

  • DFI
    Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.

    By Theo. A. M. Salet

    The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a

    Jan 1, 2006

  • ISEE
    Controlled Demolition of a Reinforced Concrete Building in Seoul, Korea

    By Kwang-Tae Kim, Yong-Kun Choi, Jeong-Soo Chong, Yun-Jae Lee

    An annex building at the former Agency for National Security Planning(NSP) complex located in downtown Seoul was demolished by progressive collapse method. This work was done as a part of efforts to r

    Jan 1, 1998

  • SME
    The Regulatory Requirements and a Permitting Strategy for Small Heap Leach Mining Operations

    By Jeffrey D. Thatcher, Debra W. Struhsacker

    With the burgeoning development of precious metals heap leach mining projects throughout the country regulatory agencies are beginning to take a closer look at the short-and long-term environmental co

    Jan 1, 1987

  • CIM
    Fine Grinding of a Sparsely Disseminated Sulphide Ore

    By Augustine O. Orumwense, Micheline Boisclair

    "The use of stirred mill to complement tumbling mills in grinding fine grained minerals is increasingly becoming an attractive processing option. Parameters such as agitation speed, grinding media typ

    Jan 1, 2008

  • DFI
    Critical Evaluation of Indian Standard for the Design of Laterally Loaded Piles

    By Sanket Rawat, Ravi Kant Mittal, Vikash Prasad

    "The understanding of the response of pile foundations under various types of loads is a necessary prerequisite to analyze and design them properly. Therefore, this paper highlights and compares the p

    Jan 1, 2017

  • METSOC
    Piloting Regenerative SO2 Scrubbing At Xstrata Nickel

    By D. G. Tisdale

    A pilot plant was installed and operated at the Xstrata Nickel Sudbury Smelter 10 demonstrate the CANSOLV SO2 Scrubbing System. A 350 m3/h slipstream (through a 10cm pipe) was drawn from two different

    Jan 1, 2009

  • DFI
    Foundation Design And Construction In Variable Rock

    By Joel Moskowitz

    A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be

    Jan 1, 2002

  • SME
    Technology News – Rasmussen Ridge Phosphate Mine Wins Idaho Reclamation Award

    The Rasmussen Ridge phosphate mine is owned by Agrium CPO and operated by a unit of Washington Group International. The mine, located in southeastern Idaho, received the Idaho Inter-Agency Reclamatio

    Jan 1, 2005

  • SAIMM
    Transient states of air parameters in mine workings caused by a disaster

    By W. Dziurzynski

    Transient states of the air parameters in mine workings occur as the effects of natural and technological disturbances, and in particular as a result of changes in ventilation conditions, caused by al

    Jan 1, 2003

  • NIOSH
    Regional Mineral Industry Review Of Europe (a95a27f0-ff42-427c-84a6-6601b74cee72)

    By L. Nahai

    Overall mineral industry productive activity in Europe increased in 1965, following general upward trends in gross national product and total industrial production4 recorded. The gross national produc

    Jan 1, 1967

  • NIOSH
    OFR-163-83 The Sixth WVU Conference On Coal Mine Electrotechnology - An Evaluation Of Problems Associated With 1000 Vac Longwall Mining Systems

    By Paul M. Hall

    In the last several years, the coal mining industry has made significant changes in the design of longwall mining systems to make them more productive. Some changes, such as increasing the length of t

    Jan 1, 1982

  • DFI
    Ground Vibrations from Pile and Sheet Pile Driving Part 1 — Building Damage

    By K. Rainer Massarsch, Bengt H. Fellenius

    "Abstract Vibrations generated during the driving of piles or sheet piles can affect buildings or installations in the ground. However, observed building damage is not always caused directly by dynami

    Jan 1, 2014

  • SME
    Reducing Mining Costs Through Computer Technology

    By Michael E. Stickney

    "Soft technology" computers and computer programs-brings to mind a room full of machines, tape drives, disks, plotters, and printers spitting out financial reports. Computers now have a much broader s

    Jan 4, 1981

  • ISEE
    Professional Steps in the Blasting Process

    By Mark William Withey

    "Blasting safety in surface mining is a necessary industrial goal. Proper techniques and disciplinesexercised during the blasting process enhance the probability of achieving that goal.The blasting pr

    Jan 1, 1995

  • IMPC
    Study on the Relationship between the Surface Characteristics and Floatabilities and their Crystal Structures of the Silicate Minerals

    By Sun Chuanyao, Jia Muxin

    Generally, if the bond valence (BV) between metal ion and oxygen of the mineral is greater than 0.8, only surface species –Me-O-H or –Me-O exposures on the mineral interface, if the BV is between 0.2-

    Jan 1, 2003

  • AUSIMM
    Geotechnical Engineering at Ok Tedi - A Multidisciplinary Approach

    By A P MACONOCHIE

    The methods used and some of the results obtained from a major geotechnical study of the Ok Tedi mine area, Papua New Guinea, are described. The study was carried out at both regional and local scal

    Jan 1, 1992

  • SME
    Critical Chain Project Management Accelerates Equipment Shutdown Management Improvement Process - Preprint 09-051

    By C. Asgaard

    Asset availability has been a longstanding objective in mining and mineral processing plants around the world. Enormous resources in both dollars and manpower are invested in improvement efforts to ac

    Jan 1, 2009

  • CIM
    Simple Mechanisation of Narrow Vein Deposits in South Africa

    By Julian Wills

    The Candrill was developed with Soredem as a one-operator rockdrill for Canadian narrow vein mining. It provides the benefits of increased drilling rates, lower noise and vibration, mass reduction of

    Oct 1, 2001