Search Documents

  • AUSIMM
    A Geophysical Study of the Structure of the Waihi Region, New Zealand

    By C A. Locke, A B. Christie, J Cassidy, J L. Mauk

    New and existing gravity and aeromagnetic data are used to determine the structure of the Waihi region and to investigate any relationship between structure, hydrothermal alteration and epithermal min

    Jan 1, 2003

  • SME
    Discussion - Mineral resource objectives of the Continental Scientific Drilling Committee’s dedicated drill holes and add-on science to solve mineral deposit problems

    By C. Meyer, J. J. Eidel

    C. W. Hunt I wish to register strong disagreement with the choices of drilling sites chosen by the Continental Scientific Drilling Committee, while endorsing the stated objectives. Of special signifi

    Jan 6, 1987

  • CIM
    On the Role of Bubble Size in Column Flotation

    By Jose R. Hernandez-Aguilar

    "Three models to predict the effect of bubble size (Db) on metallurgical response were tested in a pilot-scale flotation column at Teck Highland Valley Copper mine. The column was fed with slurry coll

    Jan 1, 2011

  • NIOSH
    Bulletin 157 Innovations in the Metallurgy of Lead

    By Oliver C. Ralston, Dorsey A. Lyon

    The data reported in this bulletin are largely the result of experiments conducted by the Salt Lake City station of the Bureau of Mines in cooperation with the department of metallurgical research of

    Jan 1, 1918

  • CIM
    Copper Concentrate Quality Improvements at Myra Falls (40th Annual Meeting of the January 22 to 24, 2008 Canadian Mineral Processors Ottawa, Ontario, Canada )

    By Trevor Yeomans

    "NVI Mining’s Myra Falls Operation is a forty year old underground mining operation feeding a 4000 mtpd concentrator.The current Mill, built in 1985, was designed to process a large massive sulphide o

    Jan 1, 2008

  • AUSIMM
    McArthur River Mine Heavy Medium Plant – The Benefits of Applying Modern Coal Plant Design Principles to Base Metal Heavy Medium Separation

    By K Cameron, S Strohmayr, J Wallace

    In 2012, a single module heavy medium cyclone plant (HMP) was installed at the Glencore Zinc’s (then Xstrata Zinc) McArthur River lead zinc mine. The HMP formed the first part of the MRM Phase 3 Proje

    Sep 7, 2015

  • NIOSH
    IC 8592 Historical Injury Experience In The Nonmetallic Mineral Industries (Except Stone And Coal) (In Two Parts) 2. 1968-69

    By Donald E. Redmon

    This Bureau of Mines report reviews injury experience in the nonmetallic mineral industries (except stone and coal) for 1968-69. For each of the years, 23 tables summarize disabling work injuries by d

    Jan 1, 1973

  • AUSIMM
    Slime Flotation Using Ethoxylated Surfactants in Solutions of the Electrolytes

    Slime Flotation Using Ethoxylated Surfactants in Solutions of the Electrolytes

    Sep 13, 2010

  • AUSIMM
    Manufacturing of FeSiB high-temperature phase change material by silicothermic reduction

    By W Polkowski, M Tangstad, M Wallin, J Jiao

    Fe-26Si-9B (wt per cent) alloy has been identified as a potential high-temperature phase change material (PCM) due to its attractive properties, such as its high latent heat of fusion and low volumetr

    Jun 19, 2024

  • ISEE
    The Exex 1000 Computer Aided Blasting (CAB) System

    By Ronald L. Cocklin, Vivian Patz

    Blasting techniques are becoming increasingly sophisticated as the need for improving mining efficiency grows. One of the areas of blasting that has never been fully exploited, due to a lack of a cont

    Jan 1, 1995

  • NIOSH
    OFR-6(1)-77 The Impact Of Overmining And Undermining On The Eastern Underground Coal Reserve Base

    By Ronald W. Stingelin

    This study undertook the development and implementation of a methodology for estimating the impact of coal seam interaction on the eastern bituminous underground reserve base as published in USBM Info

    Jan 1, 1976

  • AIME
    Meetings of the Institute (f1d6a8b1-1d78-41d7-8670-b18f60bb30ee)

    LIST OF THE MEETINGS OF THE INSTITUTE AND THEIR LOCALITIES FROM ITS ORGANIZATION TO OCTOBER, 1904 Transactions Number Place Date Vol Page 1 Wilkes-Barre, Pa May, ?71 1 3 2 Bethlehem, Pa August,

    Jan 1, 1923

  • NIOSH
    Quick-Opening Port For Permissible Enclosures - Objective:

    To provide a faster means to open and close permissible electrical enclosures. Approach: An inspection and repair port with a multiple start thread which provides a permissible joint has been

    Jan 1, 1976

  • AUSIMM
    Iron ore benefits from neutron pulsed geochemical tools

    By R A. M Maddever, P Jeanneau, V Flahaut

    Over the entire life cycle of a mine, from early resource evaluation to the blasting of benches, the collection of geochemical data is crucial for the site operator, who must routinely and intensively

    Jul 24, 2017

  • SME
    Hugh B. Miller; An interview with the 2019 SME President

    "Tell us how you got involved in mining?I was first exposed to mining at a young age, as a consequence of my dad and his passion for the industry and rock collecting. Even though he graduated with a d

    Mar 1, 2019

  • SME
    Gravity Circuit Improvements at Montana Tunnels

    By Byron T. Darnton

    Gravity concentration at the Pegasus Gold/Montana Tunnels Mine, near Helena, MT, began in June 1991 when a coarse-gold-scalping circuit was commissioned. It processes a small portion of the ball-mill

    Jan 1, 1995

  • AIME
    Meetings of the Institute (bc3e049d-678b-48f0-b02e-f4c2c3637b9b)

    LIST OF THE MEETINGS OF THE INSTITUTE AND THEIR LOCALITIES FROM ITS ORGANIZATION Transactions Number Place Date Vol Page 1 Wilkes-Barre, Pa May, ?71 1 3 2 Bethlehem, Pa August, ?71 1 10 3 Troy,

    Jan 1, 1923

  • AIME
    Meetings of the Institute (a3939ca9-a017-4914-b243-b9610944eb3d)

    LIST OF THE MEETINGS OF THE INSTITUTE AND THEIR LOCALITIES FROM ITS ORGANIZATION Transactions Number Place Date Vol Page 1 Wilkes-Barre, Pa May, ?71 1 3 2 Bethlehem, Pa August, ?71 1 10 3 Troy,

    Jan 1, 1923

  • AIME
    Meetings of the Institute (3c77d317-50eb-430f-86dc-aac670f7405a)

    LIST OF THE MEETINGS OF THE INSTITUTE AND THEIR LOCALITIES FROM ITS ORGANIZATION Transactions Number Place Date Vol Page 1 Wilkes-Barre, Pa May, ?71 1 3 2 Bethlehem, Pa August, ?71 1 10 3 Troy,

    Jan 1, 1923

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)

    By Tracy Brettmann

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2001