Search Documents

  • AUSIMM
    The Manufacture of Sulphuric Acid and its Use in Metallurgy

    Owing to the number of chemical processes now in use for the separation of metals from their ores, and the consequent employment of chemicals at the mine, it is sometimes necessary to be able to produ

  • AIME
    Annual Meeting of the Canadian Mining Institute

    By AIME AIME

    THE twenty-second annual meeting of the Canadian Mining Institute was held at the King Edward Hotel, Toronto, on Mar. 8, 9, and 10, and was followed on the 11th by an all-day excursion to the Internat

    Jan 1, 1920

  • CIM
    Port of Vancouver Expects a Huge Increase in Mineral Shipments

    By G. S. Crawford

    Forecasts prepared by the B.C. Research Council for the National Harbours Board suggest that mineral shipments through B.C. Lower Mainland port facilities will increase more than four-fold, from 6 to

    Jan 1, 1968

  • CIM
    Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, Manitoba

    By P. Walford, C. Mealin, D. Good

    "The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C

    Jan 1, 2009

  • SAIMM
    Challenges And Solutions In PGM Furnace Operation: High Matte Temperature And Copper Cooler Corrosion - Synopsis

    The key aspects of process metallurgy that distinguish platinum group metal (PGM) concentrate smelting from that of other base metal sulphide concentrates are presented. These differences include cons

    Jan 1, 2013

  • NIOSH
    In-Mine Evaluation Of Smart Mine Fire Sensor

    By R. A. Franks, G. F. Friel, J. C. Edwards, A. C. Smith

    An evaluation of a nuisance-emissions-discriminating smart mine fire sensor system was made in an operating coal mine. These field evaluations were conducted to determine the sensor system's abil

  • AUSIMM
    Recent Port Kembla experience with iron ore use – sintering and blast furnace

    By S Chew, A Bennett, N Di Giorgio, B Osborne

    After relining one of two blast furnaces and enlarging its sinter plant in 2009, BlueScope radically restructured its Port Kembla steelworks operation in 2011, shutting a blast furnace and halving its

    Jul 24, 2017

  • CIM
    Materials Challenges in Mine, Mill, and Smelters

    By N. Behnood

    "This paper describes how material selection, quality assurance, and failure investigation play important roles in the efficiency and safety of mining and metallurgical operations.INTRODUCTION Materia

    Jan 1, 2015

  • AUSIMM
    Paper No. 169. The Training of a Mining Engineer.

    A GREAT deal of attention has lately been given to the discussion as to the education required for engineers, and especially for mining engineers. The Institute of Civil Engineers has had a committee&

    Jan 1, 1909

  • AUSIMM
    Design and Commissioning of the Ridgeway Concentrator

    By B Clemen, D Gordon, F Cesnik, P Griffin

    In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm

    Jan 1, 2003

  • DFI
    Static-Load Hydraulic Piledriving: An Alternative System For Noise & Vibration-Sensitive Applications ? Introduction

    By Robert A. Field

    Static-Load Piledriving systems utilize hydraulic push to advance piles into the ground. Dynamic systems (ie. hammers and vibratory equipment) utilize impact, or vibration, to advance the piles. S

    Jan 1, 1995

  • AUSIMM
    Submarine Hydrothermal Venting and Mineralisation Associated with Kermadec Arc

    The ~2500 km long Kermadec-Tonga arc northeast ofNew Zealand is the longest continuous intraoceanic arc in the world. At least 94 volcanic centres along the arc are submarine, most (87 per cent) withi

    Jan 1, 2005

  • SME
    Tunnelling on the South East Transit Project

    By T. W. Peglas, J. Doherty, R. A. Day

    The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,

    Jan 1, 2001

  • SME-ICGCM
    Roof Control Analysis In North River Mine

    By Mike Watts

    Since the first longwall panel development started in the new mining, (Southern) area, a number of roof falls have occurred in L1 and L2 gate-entries. The longwall was delayed for a total of two month

    Jan 1, 2000

  • NIOSH
    Subject Index to Bureau of Mines Publications from July 1, 1990 to January 1, 1960 - Subject Index M-P

    "M bed, Matanuska valley, Alaska, coal carbonizingproperties B 510M spectral lines, low-energy, study RI 5538Mab shaft, Leadvile district, Colo., investigation RI .1518Maberry process, for aluminum c

    Jan 1, 1960

  • ISEE
    Effect of Meteorology on Airblast Overpressure

    By Adrian J. Moore, Alan B. Richards

    Airblast overpressure levels can commonly be increased by up to 20 decibels (dBL) by the effects of meteorology, due to inversions and wind shear. Existing atmospheric refraction models can provide a

    Jan 1, 2005

  • NIOSH
    Mobile Roof Support Load Rate Monitoring System

    By John K. Owens, Wayne L. Howie

    Mobile roof support (MRS) machines are used as roof support during pillar recovery in retreat operations in lieu of wooden posts, cribs, or hydraulic props. A Mine Safety and Health Administration-per

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • AUSIMM
    Pillar Barricades at Broken Hill South Limited, Broken Hill, N.S.W.

    This paper describes the methods of constructing timber barricades against pillars of ore in the South Mine, property of Broken Hill South Limited, Broken Hill, N.S.W., and discusses the behaviour of

    Jan 1, 1946

  • NIOSH
    IC 7615 Roof Bolting And Dust Control ? Introduction

    By James Westfield

    Drilling for roof bolting has created a new dust problem for the coal-mining industry. Drilling is inherently dusty, and control of dust produced by drilling vertical or nearly vertical holes is much

    Jan 1, 1951