Search Documents

  • SME
    Roadheader Performance On The Caldecott 4th Bore Tunnel

    By D. Kwietnewski

    The 4th bore of the Caldecott Tunnel is a 50-ft horseshoe shaped highway tunnel located in the hills east of Oakland, California. Tunnel excavation was mostly completed using one of the world?s large

    Feb 27, 2013

  • CIM
    Fair Market Value of a Mining Property

    By Walter F. Atkins

    Fair market value, in the legal sense , is the price which a prudent and knowledgeable buyer and a prudent and knowledgeable seller, acting without constraint or compulsion , will agree upon to exchan

    Jan 1, 1977

  • NIOSH
    RI 3205 The Development of an Electrolytic Method for the Determination of Inclusions in Plain-Carbon Steels

    By G. R. Fitterer, E. A. Krockenberger, B. E. Sockman, R. B. Meneilly, J. F. Eckel, E. W. Marshall

    "Steel manufacturers have noticed a decided tendency on the part of many of their customers to become more exacting in their steel specifications. Under these conditions, the steel must not only meet

    May 1, 1933

  • SME
    Differences In Design Considerations For Tunnel Vs. Mine Ventilation Fan Systems -Preprint 09-056

    By G. A. Gamble

    Fans used to ventilate subway, passenger rail and vehicular tunnels are similar to the fans used to ventilate underground mines. However, tunnel ventilation fan systems are typically designed to meet

    Jan 1, 2009

  • SAIMM
    Ferrochrome Smelting And Smelting Capacity Investment In Zimbabwe

    By J. Chirasha

    Keywords: Pyrometallurgy, ferrochrome, smelting, investment, Zimbabwe Four smelting plants currently make up the ferrochrome smelting capacity in Zimbabwe. Zimbabwe Alloys and Zimasco represent m

    Jan 1, 2011

  • SAIMM
    Just-In-Time Development Model For A Sub-Level Caving Underground Mine In Zimbabwe

    By C. Musingwini

    Traditionally, mineral reserves management at most underground mines in Zimbabwe focus on maintaining large mineral reserves so that the time between development and production is as long as possible.

    Jan 1, 2003

  • SAIMM
    Putting Beach Slope Prediction Into Perspective - Synopsis

    By R. J. Jewell

    The storage capacity of any given tailings storage facility (TSF) is a function of the volume available for the tailings, for which the geometry of the final upper surface of the tailings is most impo

    Jan 1, 2012

  • SME
    Environmental Assessment Study For Extension Of Spadina Subway In Toronto

    By Verya Nasri, Scott Thorburn

    The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi

    Jan 1, 2007

  • NIOSH
    Evaluation Of Pillar Recovery In Southern West Virginia

    By Frank Chase, M. Terry Hoch, George Karabin, Joseph C. Zelanko, Christopher Mark

    Pillar recovery continues to be a significant ground control hazard. During the past decade, 10 miners were killed during pillar extraction operations in southern West Virginia. Studies conducted du

  • ISEE
    Initial Selection of Explosive Materials for the Explosives Terrorism Risk Assessment

    By Rachel E. Gooding, George C. Emmett, David R. Bradley

    The United States (U.S.) Department of Homeland Security (DHS) Directorate of Science and Technology (S&T) is using a probabilistic risk assessment (PRA) approach to evaluate the risks from terrorist

    Jan 1, 2017

  • SME
    Flotation Froth Image Segmentation Based on Highlight Correction and Parameter Adaptation Mining, Metallurgy and Exploration (ff8d32fd-da4e-43f4-8da2-8beb808a22d7)

    By Wen Tao Liu, Tong Tian, Fu Sheng Niu, Xiu Man Liang

    In order to address the difficulty of accurate segmentation of froth images of different sizes, a method of froth image segmentation based on highlight correction and parameter adaptation is proposed.

  • DFI
    High Capacity And Fully Removable Soil Anchors

    By Anthony D. Barley

    Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit

    Jan 1, 2002

  • IOM3
    Utilization of voids for development and gas generation following waste disposal

    By J. A. Every-Brown

    Case studies are presented of three derelict sites in Kent and Essex that provide a good cross-section of opportunities for second-generation commercial uses of former chalk, limestone, clay and grave

    Aug 1, 1994

  • NIOSH
    RI 3291 Bureau Of Mines Multiple-Diaphragm Recording Subsurface-Pressure Gage ? Introduction

    By W. B. Berwald

    [Accurate ~cusirc::ie t of euusu.rface r,resw rus £Uld tee:: ?er:~t:,res in producin+ oil and as wells is one of tine ast iy,ulortant steps ever t,.s:en to place the rprwctice of retroleum ,-iroductio

    Jan 1, 1935

  • SAIMM
    Fundamentals Of Freeze Lining Behaviour In Ilmenite Smelting (3a57d3de-509b-4f93-b2e1-a89185adab8b)

    Changes in reductant and energy inputs which are required to adjust the slag composition in an ilmenite smelter to a higher or lower FeO content are calculated. The calculated changes are based on the

    Jan 1, 2003

  • SAIMM
    Incline Caving As A Massive Mining Method

    By D. D. Munro

    Finsch Mine is a kimberlite diamond mine located at Lime Acres in the Northern Cape Province of South Africa. The mine was founded in 1961 and started surface mining in 1964. Underground production co

    Jul 1, 2013

  • AUSIMM
    Geochemical Mining Impact and Possibilities of its Reduction

    By V P. Elpatyevskaya, V S. Arzhanova

    Main geochemical problems concerning the environment and mining industry interrelation are connected with the transformation of natural water chemistry by mining wastes. The investigation of many mine

    Jan 1, 1995

  • SME
    Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method

    By Paul H. Madsen, Victor S. Romero

    The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo

    Jan 1, 2001

  • SME
    124,000 Attend ConExpo-Con/Agg ’99 in Las Vegas

    By Steve Kral

    More than 124,000 people involved in the mining and construction industries throughout the world poured into Las Vegas, NV in March for ConExpo-Con/Agg ’99. Show organizers said this triennial exhi

    Jan 1, 1999

  • SME
    Sampling Methods for Seamount Cobalt-rich Crusts and Determination of the Minimum Reliable Assay Sample Quantity

    By Xuehua Zhang, Shengxiong Yang, Huiqiang Yao, Gaowen He

    "Seamount cobalt-rich ferromanganese crusts (hereafter crusts) are authigenic iron/manganese hydroxide/oxide deposits formed from direct precipitation of minerals from seawater onto a hard substrates

    Sep 1, 2014