Search Documents

  • AUSIMM
    The Determination of Fe, Si and Al Content in Iron Ore Blastholes by Nuclear Logging

    By A Rojc, J Ronaszeki, C Smith

    Nuclear logging was tested for the in situ determination of Fe, Si, and Al in iron ore blastholes with field tests at the BHP Billiton Iron Ore, Mount Waleback Mine. Prompt gamma neutron activation an

    Jan 1, 2002

  • DFI
    Settlement Of A Building After Cutting Off Pile Tips Due To Tunnelling

    By Richard A. Forth

    During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor

    Jan 1, 2002

  • ISEE
    Coal Loss Due to Cast Blasting--Implication on Mine Economics

    By Sarma S. Kanchibotla

    In overburden cast blasting the explosive energy is used to move a significant percentage of overburden from the high wall to the spoil pile thus reducing the amount of material to be handled by machi

    Jan 1, 1999

  • SME
    Use Of The Multiple Accounts Analysis Process For Sustainability Optimization

    By S. Shaw

    There is an increasing requirement for mines to meet a certain minimum criteria for sustainability within the context of the physical environment, ecosystem and socio-economic system in which they are

    Jan 1, 2004

  • DFI
    Route 49 (Penns Neck Bridge) Over Salem River

    By James E. Maccariella

    Replacement of an existing movable bridge with a new low level fixed bridge would not accommodate potential future navigation traffic. In order to replace the existing bridge in a cost effective m

    Jan 1, 2005

  • AUSIMM
    VisuMet – analyses of lumpy iron carriers with image processing

    By H Mali, B Kain-Bückner

    Different types of lump iron ore-bearing particles were investigated in terms of their raw material properties depending on their behaviour during reduction. To predict the reduction behaviour differe

    Jul 24, 2017

  • CIM
    Process Improvements at Bell Creek Mill

    By F. Flynn, P. Downey, G. Ritson

    "Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git

    Jan 1, 1997

  • NIOSH
    RI 5543 An Electrolytic Method For Separating Nickel And Cobalt - Summary

    By M. J. Ferrante

    A process was investigated for preparing Specification-grade nickel (containing less than 1 percent cobalt) by stripping it electrolytically from a nickel sulfate-boric acid solution and using the str

    Jan 1, 1959

  • ISEE
    Comparison of Field and Simulated Cast Blasts

    By R. F. Favreau, Patrice Favreau, Dennis Mahan

    Cast blasting is becoming more and more popular, not only in coal mines but also in other operations which require excavation of an upper layer of waste rock to uncover temporarily and excavate a laye

    Jan 1, 2014

  • DFI
    Modulus of Elasticity in Deep Bored Piles

    By Carlos Lam, Joram M. Amir, Erez I. Amir

    "Abstract The modulus of elasticity of pile material (E) is an important parameter for the interpretation of both static and dynamic loading tests on piles. This value is commonly assumed to be consta

    Jan 1, 2014

  • CIM
    Distinguishing ore types at the Lac des Iles PGE-gold-copper-nickel mine, Ontario: Implications for resource modelling, mining and processing

    By M. J. Michaud, M. J. Lavigne

    "A cornerstone of any successful mining project is an understanding of the mineral assemblage and metal distribution comprising the deposit. Knowledge of the precise mineral/ metal zoning enables an o

    Jan 1, 2003

  • NIOSH
    IC 9416 A Chromium Consumption And Recycling Flow Model

    By Jr. Gabler

    The U.S. Bureau of Mines (USBM) has developed a computerized commodity flow model for strategic and critical materials This flow model is generic and applicable to most commodities and amenable to upd

    Jan 1, 1994

  • NIOSH
    RI 5265 Production Of Titanium Castings ? Summary

    By R. A. Beall

    This paper summarizes the development of a furnace for producing titanium castings. The general problem is outlined and chronological details are given on the construction and operation of four differ

    Jan 1, 1956

  • CIM
    Some Fundamental Hydro-Mechanical Processes Relevant for Understanding the Pore Pressure Response around Excavations in Low Permeable Clay Rocks

    By K. M. Wild, C. D. Martin, F. Amann

    "Argillaceous rock formations, in particular clay shales, are notorious for creating challenges in rock engineering. Due to their generally low hydraulic conductivity and their complete saturation in

    Jan 1, 2015

  • SAIMM
    Activity of chromium oxide in CaO-SiO2based slags at 1873 K

    By K. Morita, N. Sano

    Thermodynamic properties of chromium oxides in molten slags are very important for optimization of stainless steel refining processes as well as reduction processes of chromium ores. The solubility of

    Jan 1, 2004

  • CIM
    The Application of the Stackcell Technology for Fine Coal Recovery

    By E. S. Yan, R. Graley

    "The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell

    Jan 1, 2013

  • SME
    Development and application of simple process models for spiral concentrators

    By A. Steinmüller

    Introduction In the design and operation of gravity concentration circuits, the application of process models for spiral concentrators offers significant benefits. A substantial amount of work has

    Jan 1, 2005

  • DFI
    Diving Underground - Through a Hologram - To Better Understand Foundation Risk

    By Scott A. Anderson, Benjamin S. Rivers, Derrick D. Dasenbrock, Silas Nichols

    Unknown geotechnical conditions are a major source of risk. Unexplored places vastly outnumber the sampled and tested ones, and widely spaced boreholes with intermittent tests and samples are the norm

    Jan 1, 2019

  • CIM
    Preparing a Long-Lasting Environmental Impact Statement

    By Glen A. White

    The level of impact and mitigating measures that are forecast in an environmental assessment (EA) for a new, or significantly modified, metallurgical processing facility or mine are taking on increasi

    May 1, 2004

  • AUSIMM
    The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc Concentrator

    By K S. Fisher, J D. Pease

    The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro

    Jan 1, 2000