Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Computer Simulation Of Breakage Of The Main Roof In Longwall MiningBy Deren Zhu
Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc
Jan 1, 1988
-
Chemical Destressing to Alleviate RockburstsBy S. P. Singh
Destress blasting is commonly used in the mines to minimize the occurrence of rockbursts. The fracturing created by destressing in the vicinity of the face reduces the stress concentration by pushing
Jan 1, 1987
-
Field Testing of the Fully Grouted Thrust Tensioned BoltsBy Kot Unrug
Fully grouted tensioned bolts provide a desirable compressive of laminated roof and bondage along the entire bolt length, at the same time the entire surface of the hole is protected against penetrati
Jan 1, 2002
-
Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)By Winton J. Gale
The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o
Jan 1, 1992
-
Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock MineBy Chris Pritchard
Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun
Jan 1, 1999
-
Techniques To Increase Yield Pillar Residual StrengthBy Dennis R. Dolinar
The U.S. Bureau of Mines has modeled yield pillars to determine the effects of reinforcement techniques on pillar performance. Model pillars with width-to-height (w/h) ratios ranging from one to four
Jan 1, 1993
-
Investigation of Subsidence Over AML: A Case StudyBy P. M. Lin
The problem of abandoned mine land (AML) subsidence is getting more severe because abandoned mine lands which used to be located in the remote areas have been gradually developed into suburbs or even
Jan 1, 1987
-
Geophysics For The Detection Of Abandoned Mine WorkingsBy Christopher Phillips
In light of recent events in the mining industry, there has been an increasing demand for technology to detect underground voids and abandoned mine workings. This paper summarizes the use of geophysic
Jan 1, 2003
-
Early Warning of Longwall Weighting Events and Roof Cavities Using Lva SoftwareBy David I. Hoyer
It is shown that by monitoring longwall leg pressures in real time, warning can be given for significant weighting events and the formation of roof instabilities, such as roof cavities, several hours
Jan 1, 2011
-
Determination Of Limitation Of Roof Layer Separation (LRLS) In Entry RoofBy Wenjun Ju
It's very important to determine the limitation of bed separation in entry roof in order to predict roofs stability and take some necessary precautions. Based on numerical modeling and monitoring
Jan 1, 2001
-
Modeling of Joint and Fracture Distributions in Rock Mass Before and After BlastingBy Binchuan Zhang
Based on the theory of fracture mechanics and blasting, computer simulations were performed to predict the original rock mass structure and those rock mass structures damaged at different levels uing
Jan 1, 2001
-
Roof Instability of Longwall Face at Ikeshima CollieryBy Kikro Matsui
Longwall mining 1s more productive in comparison to other methods but requires particular conditions for its effective use This paper relates to longwall roof instability at Ikeshima Colliery In order
Jan 1, 1997
-
Effects of Draw Slate Thickness on Longwall MiningBy Jun Lu
The Pittsburgh seam is the most extensively mined coal bed in the Appalachian Basin. Unlike most other prominent coal seams, the Pittsburgh seam typically includes a sequence of immediate roof coals a
Jan 1, 2013
-
Problems in "Void" Detection in Coal Mine Water HazardsBy Francis Kendorski
One of the most dangerous events in underground coal mining is unexpectedly encountering water inrushes from undetected abandoned mines in the same seam. The surest and most confident method is probe
Jan 1, 2004
-
Roof Control With Polyurethane For Recovery Of Kitt Energy?s 1000-Foot LongwallBy J. G. Stewart
Polyurethane injection for the consolidation and control of broken strata is a common practice in the deep mines in Europe. The technology has gained wide acceptance in the coal mines of America since
Jan 1, 1984
-
A Study of Periodic Weighting of Longwall SupportsBy Archie Richardson
Periodic weighting of longwall supports occurs during retreat ofthe face under certain geologic conditions. Strong stratain the immediate and main roof tend to cantilever over the gob, weighting the s
Jan 1, 1998
-
Improvement in Pre-Tensioning of Strand Bolts in Australian Coal MinesBy Mietek Rataj
Installation of pre-tensioned Strand Bolts i.e. resin grouted cable bolts is very common now in Australian coal mines. A short historical development of this type of rock reinforcement is outlined Var
Jan 1, 2002
-
Study Of The Impact Of Mining Under Massive Roof At Datong Coal Mines, China (7e96e5f6-0b09-4bad-866d-2ffcd02d33be)By Song Yong Jin
The Jurassic coals at Datong are characterised by their strong, massive sandstone and conglomerate roofs which fail suddenly over large areas, crushing pillars and creating destructive windblasts, col
Jan 1, 1992
-
Hydraulic Tensioning Of A Birmingham Roof TrussBy C. W. Bollier
In recent years, Peabody Coal Company has enjoyed a great amount of success using roof trussing as a secondary support system. Since 1975, over 180,000 trusses have been installed in 12 different Peab
Jan 1, 1982
-
Ground Control Problem Associated with Longwall Mining of Developed PillarsBy T. N. Singh
Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems
Jan 1, 1984