Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Evaluation Of Measurement System For Monitoring The Stability Of Roof Bolted Roadways With Rectangular Cross Section By Selected Examples

    By Axel Preusse

    To detect improper deformations of a roof bolted roadway in order to reduce inner mine damages in the most early stage and to initiate suitable countermeasures if necessary, several different measurem

    Jan 1, 2000

  • SME-ICGCM
    Abutment Pillar "Notching" Improves Abutment Tunnel Roof Conditions At The Cayuga Rock Salt Mine

    By David B. Plumeau

    The Cayuga Mine, a deep rock salt mining, operation, changed from a standard room and pillar mine design to a yielding pillar/pressure arch design five years ago. In general the roof conditions improv

    Jan 1, 1981

  • SME-ICGCM
    The Formation And Effects Of Transient Abutment Stress During Nonuniform Face Advance

    By George J. Karabin

    Since the inception of a qualitative pressure arch theory by Haak4 in 1911, much work has been done in an effort to apply this concept to underground mining. It has been used in both longwall and room

    Jan 1, 1982

  • SME-ICGCM
    Innovative Rock Reinforcement Hardware (a5497235-47bd-4c2e-8654-b4e79927169e)

    By D. F. Howarth

    Two innovative ground reinforcement products have been developed for use in the mining industry. One of these products is a high strength polyethylene (HOPE) bar for use as a rib bolt in underground c

    Jan 1, 1992

  • SME-ICGCM
    Extended Cut Out Distances In Continuous Miner Sections In South African Collieries

    By Ismet Canbulat

    The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and

    Jan 1, 2000

  • SME-ICGCM
    Floor Heave in Shallow Room-and-Pillar Mining

    By André Zingano

    This paper analyses possible causes for floor heaving in room-and-pillar coal mining. The coal mines are in the southern part of Brazil, where the Barro Branco Coal Seam varies in depth from 20m to 40

    Jan 1, 2002

  • SME-ICGCM
    Development of A Yielding Steel Post

    By John P. Dunford

    Ground support continues to be the most important safety consideration in underground mining. The Bureau of Mines has developed a yielding steel post with a capacity of 45 tons and b c1osure allowance

    Jan 1, 1986

  • SME-ICGCM
    Non-Destructive Testing on Fully Grouted Rockbolts

    By Dieter Wittenberg

    The use of thc ultrasound technique for monitoring rockbolt support has at last provided support engineers with a measunng system capable of pinpointing fracture failuns in fully-grouted rockbolts. Th

    Jan 1, 2001

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Image Analysis Development And Application To Fracture Pattern Analysis

    By Ali Benbia

    The paper shows results from the physical modelling of longwall excavations concentrating on the fracture pattern development above longwall panels. The modelling technique is briefly described and th

    Jan 1, 1993

  • SME-ICGCM
    Directional Rock Bolt Pullout Tests as Index Tests for Estimating Rock Mass Quality

    By Michael Alber

    Pullout tests on resin grouted rock bolts have been executed in coal mines and surface test sites. The goal of this study was to provide some qualitative information about the rock mass quality from m

    Jan 1, 2003

  • SME-ICGCM
    The Response Of Massive Structures Inferred From Tidal Tilt Monitoring (a922d488-04e7-4665-bcdd-a85115c8db5e)

    At any given lime, the tidal force subjects massive regions to a spatially uniform load. The deformation of any large structure due to these forces is proportional to the elastic properties of the str

    Jan 1, 1992

  • SME-ICGCM
    Shear Bond Stresses Along Cable Bolts

    By Hani S. Mitri

    The behaviour of grouted cable bolts used for rock reinforcement as a means of ground control in hard rock mining is investigated. The study utilizes an analytical model which is based on the variatio

    Jan 1, 1990

  • SME-ICGCM
    Economic Evaluation Of Subsidence Damage Mitigation Techniques

    By David C. Johnson

    Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m

    Jan 1, 1993

  • SME-ICGCM
    New Tools For Roof Support Evaluation And Design (64c31d00-3878-45a5-a962-d673afed7598)

    By Steve Signer

    Researchers at the National Institute for Occupational Safety and Health (NIOSH) have developed several new tools for evaluating roof support performance. A miniature data acquisition system (MIDAS) w

    Jan 1, 2003

  • SME-ICGCM
    Heat-Imaging Experimental Study Of Reducing Local Gas Accumulation By Rotary Radial Jet

    By S. Q. Yang

    Rotary radial jet improves greatly the pulsing velocity of airflow along each direction everywhere in the entry, intensifies transverse migration of air, eliminates effectively the local gas accumulat

    Jan 1, 2004

  • SME-ICGCM
    Investigation Into Cutting Characteristics Of Indian Coal Seams (bf5c67f9-81c7-4039-8f47-cd39420e2b8e)

    By T. N. Singh

    With a view to producing increased target output every year, Indian coal mining industry is fast moving towards mechanisation but the present approach of mechanisation suffers from lack of standardisa

    Jan 1, 1992

  • SME-ICGCM
    3D FEM Simulation For Fully Grouted Bolts

    By Khaled Morsy

    Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh

    Jan 1, 2004

  • SME-ICGCM
    New Approach to Evaluate the Stability of Yield Pillars

    By Khaled Morsy

    In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica

    Jan 1, 2003

  • SME-ICGCM
    Massive Pillar Failure--Two Case Studies

    By David H. Tang

    Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes

    Jan 1, 1984