The Fault At The End Of The TunnelBy S. S. Rowland
Good afternoon, ladies and gentlemen. It is a pleasure, for several reasons, to be here at this 13th International Conference on Ground Control in Mining. Of course it's always a pleasure to be a
Jan 1, 1994
-
Recent Developments in Pre-driven Recovery Road DesignBy Rob Thomas
Pre-driven recovery roads are used to speed up the longwall recovery process by reducing bolt-up requirements and by improving ground conditions on the face during the removal of the powered supports.
Jan 1, 2008
-
Coal Mine Ground Control in Western Europe; Past, Present and FutureBy D. N. Bigby
This paper concentrates on ground control innovation in Europe since the first Morgantown conference, mainly from a UK perspective. In particular, it describes the rock engineering and ground control
Jan 1, 2006
-
Clay Veins: Their Physical Characteristics. Prediction, and SupportBy Frank E. Chase
Clay veins, also referred to as clay elastic dikes, have been responsible for numerous underground injuries and fatalities. These hazardous structures are also responsible for increased production cos
Jan 1, 1984
-
Load Determination For Long Cable Bolt Support Using Computer Aided Bolt Load Estimation (CABLE) ProgramIn this paper a numerical formulation is presented for determination of the axial load along a cable bolt for a prescribed distribution of rock mass displacement. Results using the program CABLE indic
Jan 1, 1996
-
Roof Screening for Underground Coal Mines: Recent Developments (45f180e8-0601-41d7-bc8b-2e9de87bd46d)By Craig Compton
Falls of small pieces of rock from between roof bolts continue to cause fatalities and to injure hundreds of coal miners each year. Roof screen is the most effective way to prevent these incidents,
Jan 1, 2007
-
Estimation Of Long-Term Stability Of Mine Pillars In Underground PitBy S. Yamashita
Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th
Jan 1, 1996
-
Jenmmar Compression Roof Control SystemBy John C. Stankus
To improve mine roof bolt performance, Jennmar Corporation commenced the design and development of a new roof control sys- tem. This new system designated "Insta'l Compression", not only improves
Jan 1, 1990
-
Prediction of First Weighting Distance in Longwall Coal Mining By 3D Numerical Modeling ? A Case StudyBy Haile Manteqi
In longwall coal mines, estimation of roof strata condition, sequence of loading, and supporting requirements are of a high degree of importance, and they are directly related to production and safety
Jan 1, 2012
-
Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIABy Ulrich Paschedag
The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most
Jan 1, 1994
-
Cost Preventive System To Control Unstable Roof In Main Line Haulage EntriesBy John Popovich
The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc
Jan 1, 2001
-
Extraction of Hard Coal Close to a ShaftBy Peter Fischer
Reducing mining costs has become such an important factor in the German coal industry that operators are forced to work only those areas where production costs can be kept low. These areas will normal
Jan 1, 2007
-
Field Test Results On Dyna-Rok And Dyna-Rok Plus AnchorsBy James J. Scott
Research and development has been carried out on the patented Dynamic Rock Anchor, tradenamed DYNA-ROK and DYNA-ROK PLUS Anchors, which are manufactured and marketed by Ingersoll-Rand Company. This pa
Jan 1, 1990
-
Application of Chain Conveyor Cutter (Ccc) to Highwall Mininig SystemBy Takashi Sasaoka
Chain Conveyor Cutter (CCC) is a chainsaw-type machine and originally developed for the construction of underground walls and/or ground improvements. CCC was developed from the accumulated technology
Jan 1, 2012
-
Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion RiskBy D. J. Reddish
An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the
Jan 1, 1996
-
Catastrophic Failures of Underground Evaporite MinesBy Jeff Whyatt
Deformation of underground salt, trona and potash mines is generally time dependent, providing for gradual adjustment of strata to mining induced stresses. Time dependence can allow for higher extract
Jan 1, 2008
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence PredictionBy Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Nonlinear Approach For Determining Design Criteria For Yield Pillar PerformanceBy W. Smith
The U.S. Bureau of Mines (USBM) is using laboratory and computer-based techniques to investigate the post- failure behavior of yielding pillars and pillar reinforcement techniques to control entry def
Jan 1, 1995
-
Harworth Colliery: Rockbolted Support In Weak Roof At DepthBy Dave Bigby
Hatworth Colliery, operated by RJB Mining (UK) Ltd, is successfully mining the Deep Soft Seam at a depth of 1000m using single face retreat longwalling. The seam is characterised by a weak roof genera
Jan 1, 1996
-
The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)By Anthony S. Spearing
The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi
Jan 1, 2009