Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Use Of A Computer Model For Evaluating Diesel Implementation Strategies In Coal Mine Development Sections

    By W. Wan

    Diesel particulate matter (DPM) emitted from diesel engines is currently considered to be a health problem in underground mines. As a result, attempts have been made to control DPM both by reducing em

    Jan 1, 1994

  • SME
    Application Of Percolation Theory To Assessment Of Permeability Enhancement By Micro-Hydrofracturing For In Situ Copper Leaching

    By T. M. Yegulalp

    A numerical model is being developed to assess the enhancement of permeability by improved fracture connectivity by micro-hydrofracturing. A generic two-dimensional percolation model has been develope

    Jan 1, 1995

  • SME
    The Sage Mill Project

    The Sage Mill Project w approved by Santa Fe Pacific Gold Corporation's Board of Directors in October 1994. The Sage Mill Project included a pressure oxidation plant designed and constructed to p

    Jan 1, 1999

  • SME
    Pneumatic Loading Of Nitro-Carbo-Nitrates Static Electricity, Fumes And Safe Handling - Introduction

    The introduction of nitro-carbo-nitrate (NCN) blasting agents has been one of the most significant innovations in the explosive industry in the last twenty years. The most commonly used blasting agent

    Jan 1, 1973

  • SME
    Design Problems Associated With Port Handling Facilities

    By Ian S. Ross

    The emphasis in this paper is focussed on dry bulk car go or the same cargo converted to slurry form for ease of handling. It is this type of cargo which is of primary interest to the mining industry

    Jan 1, 1972

  • SME
    Importance of mineral secondary and waste raw materials in the minerals' management - Poland's case

    By K. Galos

    The paper presents increasing importance of mineral secondary and waste raw materials in the minerals management in Poland. Definition of mineral secondary and waste raw materials is proposed, accordi

    Jan 1, 2011

  • SME
    Optimum Open-Pit Mine Scheduling Considering Multivariate Grade Uncertainty Using Deep Q-Learning

    By Sebastian Avalos, Julian M. Ortiz

    The long-term mine scheduling is the optimal decision on how to extract and process the mining reserves. The resulting plan is mainly driven by economic, metallurgical, and geological factors. Account

    Jun 25, 2023

  • SME
    Meeting The Requirements Of The Surface Mining Control And Reclamation Act ? Introduction

    By James R. Jones

    The Surface Mining Control & Reclamation Act is a complex piece of legislation signed into law on August 3, 1977. It is the culmination of more than six years of debate by the Congress over the need f

    Jan 1, 1979

  • SME
    The Current Status Of Silicosis In Hard Rock Mining

    By Marcus M. Key

    Silicosis among metal miners is an ancient disease, probably as old as mining itself.' However, the primitive forms of mining were not productive of much silica dust, and the short life span of s

    Jan 1, 1971

  • SME
    Truck Fleet Dispatching Control in Open-Pit Mining Based on Reinforcement Learning and Discrete Event Simulation

    By Yashar Pourrahimian, Roberto Noriega

    Truck fleet dispatching plays a crucial role in reducing operational costs and fulfilling operational targets in open-pit mining operations and is subject to large uncertainty arising from the operati

    Jun 25, 2023

  • SME
    Evaluation Of The Wet Head Continuous Miner To Reduce Respirable Dust (40c5fb97-72f6-46ec-b97f-ab35be3e98ce)

    The National Institute for Occupational Safety and Health (NIOSH) conducted field tests to evaluate the effectiveness of a wet head continuous mining machine for reducing dust exposure for continuous

    Jan 1, 2010

  • SME
    A PC-Based Worker Scheduling System For Underground Mines

    By R. L. Grayson

    Following lip on a USBM-sponsored research project, the authors have utilized the knowledge-base structure and system concepts from the Sun Sparcstation-based worker scheduling system of the Mine Mana

    Jan 1, 1996

  • SME
    Structural Analysis Of Mine Pillars Using Finite Element Method ? A Case Study (33d11900-f541-447c-9266-57bec509d8a1)

    By D. H. Y. Tang

    3-dimensional finite element modeling was performed to analyze the safety factors of stump pillars, 18 ft. x 18 ft., under a cover of 208 ft. using the Modified Drucker-Prager Theory. The results show

    Jan 1, 1987

  • SME
    Environmental Problems Of Oil Shale Development

    By John W. Rold

    These encompass all adverse effects of oil shale mining, processing, and ancillary developments on the environment. Specific problems concern: land, vegetation, wildlife, water, air, population growth

    Jan 1, 1972

  • SME
    Using Meaningful Reconciliation Information To Evaluate Predictive Models (f422be80-ebd4-4e59-9f97-b10db17502b0)

    By M. E. Rossi

    Reconciliation of production information is critical to evaluating the effectiveness of the predictive models, and to allow for optimization of mining operations. Whether mining open pit or undergroun

    Jan 1, 1999

  • SME
    Unstable Operating Ranges Of A Fan And Non-Achievable Quantity Ranges Of Airways In A Ventilation System

    By S. Lin

    Fan stall is a notorious phenomenon with axial-flow fans. When multiple fans of this type serve a ventilation system, their mutual impacts are very complicated and not well understood. Results from la

    Jan 1, 1996

  • SME
    Urban Costs: The Contractor's Viewpoint

    By Patrick B. Kenny

    Generally speaking, it is safe to address this conference as a conclave of Engineers, Owners' Agents, Governmental Representatives, and Contractors. As a group, we have assembled here to learn of

    Jan 1, 1979

  • SME
    A New Proposal for a Mining Induced Seismicity Indicator using Earthquake's Frictional Energy RaSiM10 (Rockburst): 2022 Proceedings

    By Rodrigo Estay Huidobro, Andrés Martinoli, Claudia Pavez-Orrego

    The effects of induced seismicity caused by mining activities are one of the main problems that the mining industry faces. Although it has been documented by countries with a great mining tradition (U

    Apr 26, 2022

  • SME
    Temperature and Humidity Tests for Mobile Refuge Alternatives

    By P. Bissert, L. Yan, D. Yantek

    "Federal regulations require refuge alternatives (RAs) in underground coal mines to sustain life for 96 hours while maintaining an apparent temperature (AT) below 35°C (95°F). NIOSH research has shown

    Jan 1, 2017

  • SME
    Modeling and Prediction of Underground Blasting Vibration

    By C. Konya, A. Konya

    "INTRODUCTION Over the past twenty years this Linear-Regression Modeling has become widely accepted for ensuring limits are not exceeded at a site, using the Scaled-Distance variable. In today’s indus

    Jan 1, 2018