Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Comparing EIA And ESHIA For Evaluating Mining Projects

    By R. E. Mitchell

    Environmental Impact Assessment (EIA) is the accepted method for evaluating proposed mining and other industrial projects to obtain regulatory approval and to help companies plan for responsible devel

    Jan 1, 2012

  • SME
    Comparison of PFC2D Modeled Damage and the Practical Damage Limits from Drift Blast Design Software

    By M. Kuchta, S. Iverson

    INTRODUCTION Underground blasting with perimeter damage control can reduce the requirement for loose rock scaling and reduce the risk of ground-fall injury. In previous work Johnson and associates (2

    Jan 1, 2019

  • SME
    Y2K – The Mining Industry and Political and Security Risks

    By Martin Stone

    Industrialized countries, particularly the United States and the United Kingdom, remain at the forefront of international efforts to control the potential disruption from computer malfunctions caused

    Jan 1, 1999

  • SME
    Developing Trees Tolerant to Degraded Mine Soils in an Underground Greenhouse Mining, Metallurgy and Exploration

    By Michael Kukay, Paul Conrad, Cosmas Opoku-Ware

    This project is exploring the potential for developing trees tolerable to degraded un-reclaimed mine site soils and tailings as a solution to re-establishing long-term tree growth on those sites. The

  • SME
    Challenges Of Conveyors In Tunneling

    By Marco Sonnenschein

    As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if

    Jan 1, 2012

  • SME
    Recent Advances in Studying Colloidal Interactions in Mineral Processing Mining, Metallurgy and Exploration

    Colloidal interactions play a critical role in mineral processing, including grinding, physical separation (particularly flotation), dewatering, and tailings management. Despite great energy input in

  • SME
    Palygorskite (Attapulgite) In Central China - Preprint 09-035

    By H. H. Murray

    The largest reserves of palygorskite in the world are located in Anhui and Jiangsu Provinces in East Central China. The deposits are Middle Miocene in age and range from 3 to 6 m in thickness. The d

    Jan 1, 2009

  • SME
    New XRF Analyzer For Elemental Analysis Of Sample Streams

    By C. Bachmann, M. J. Laurila, A. J. Widenman, A. Klein

    Elemental analysis of slurry streams using X-ray fluorescence (XRF) has long been employed. However, detector technology has limited the application of XRF devices. Using detector technology employed

    Jan 1, 1999

  • SME
    U. S. Coal Producers Have Reason to Take Heart

    By Steve Kral

    For an industry that provides more than half of the nation’s energy needs, the U.S. coal industry still attracts negative publicity. However, the nation’s energy appetite continues to increase. And

    Jan 1, 2002

  • SME
    Investigation and Abatement of Subsidence Damage at the Heltsley Residence, Indiana

    By Robert A. Cummings, Madan M. Singh

    In April 1984 a subsidence depression formed directly beneath a two-story frame residence, near Linton, IN, causing 2 ft of separation between the floor and walls, and damaging both the foundation and

    Jan 1, 1986

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • SME
    Design and construction of a surface air cooling and refrigeration installation at a South African mine

    Impala Platinum?s No.16 Shaft mine is currently under construction and is expected to reach full production of 256 500 tons per month by 2014. Mining will start at 1 260 m below surface with a maximum

    Jan 1, 2009

  • SME
    Metallurgical Development And Design For The Pascua Lama Project

    By R. A. Williams

    The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is

    Jan 1, 2001

  • SME
    Ventilation planning at the Minerales Monclova?s Mines

    By J. R. P. Aguirre

    Minerales Monclova, S.A. de C.V. (MIMOSA) is owned by Grupo Acerero Del Norte (GAN). This company has 4 underground coal mines and 1 open pit to feed it?s steelmaking facilities located in the city of

    Jan 1, 2009

  • SME
    Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station Project

    By Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister

    Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align

    Jan 1, 2005

  • SME
    Deep neural network models for improving truck productivity prediction in openpit mines

    By Wei Victor Liu, Omer Faruk Ugurlu, Chengkai Fan, Bei Jiang

    Accurate prediction of truck productivity plays a pivotal role in improving the efficiency and profitability of openpit mining operations. This paper proposes a deep neural network (DNN) model to over

    Jul 1, 2024

  • SME
    A Snapshot Of Noise And Worker Exposures In Sand & Gravel Operations

    By E. R. Bauer

    Previous studies and research efforts have shown that noise-induced hearing loss (NIHL) is a problem in the U.S. mining industry. This is especially true in surface and underground coal and stone min

    Jan 1, 2008

  • SME
    Planning for the Drumanard Highway Tunnels, Kentucky

    By Lawrence Williamson, Randall J. Essex, David P. Field

    As part of a $2.2 Billion bridge project that will link Indiana and Kentucky, an interchange project northeast of Louisville will require the mining of a 6-lane tunnel system about 2,000 ft long in or

    Jan 1, 2005

  • SME
    Proposed Contracting Practices For The Caltrain Downtown Extension

    By Derek J. Penrice

    The Caltrain Downtown Extension (DTX) project will extend commuter and future statewide high-speed rail service into the Transbay Transit Center, which will be located in the business district in down

  • SME
    Design of the Brightwater Conveyance Tunnels

    By Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams

    The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi

    Jan 1, 2005