Soil Deformation Analysis During TBM Excavation: Comparing Three Different TBM Technologies Used During the Construction of the Toulouse Metro Line BBy Richard Kastner, Emilie Vanoudheusden, Fabrice Emeriault, Jacques Robert
INTRODUCTION The subway line B of Toulouse (France) has been realized with three different tunnel boring machines (TBM) techniques: Contracts 2 and 5 are excavated with earth-pressure balanced TBM
Jan 1, 2007
-
A century of mining safety and health research A century of mining safety and health research A century of mining safety and health researchBy John A. Breslin
The year 2010 will mark the 100th anniversary of the beginning of the research efforts by the U.S. government to improve the health and safety of miners working in the United States. This research
Jan 1, 2010
-
Inspection of a Brick-Lined AqueductBy Paul S. Fisk, Arne Fareth, Julie Frietas, Francis Lo, Fidel L. Mallonga
INTRODUCTION This report describes the inspection of parts of the New Croton Aqueduct (NCA)undertaken for the New York City Department of Environmental Protection (NYCDEP)by Parsons Brinckerhoff Qu
Jan 1, 2007
-
NATM Through Clean Sands—The Michigan Street ExperienceBy Mohamed A. Younis, Paul J. Headland, Paul H. Madsen, Vojtech Gall
INTRODUCTION A 100 ft long, 20 ft high and 18 ft wide NATM tunnel was excavated through grouted clean sands beneath a busy city street, including a variety of existing utility lines. The new tunnel
Jan 1, 2007
-
Ventilation requirements for uranium minesBy C. Gherghel
The planning and operation of ventilation network systems for uranium mines require special considerations since ventilation is the primary technique of controlling ambient concentrations of radon pro
Jan 1, 2009
-
EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City ProjectBy Hiroshi Yamazaki
The paper describes prediction, control and validation of face pressures, and special TBM features for the bored tunnels of the New Metro Rail City Project, Perth, Australia. The selected EPB-TBM pass
-
Ventilation Monitoring and Control in Mines "Mining, Metallurgy & Exploration (2020)"By MAHESH SHRIWAS, CHRISTOPHER PRITCHARD
Ventilation monitoring and control in mines are becoming an integral part of day-to-day activity for maintaining health and safety of miners. The authors evaluate potential real-time monitoring soluti
May 12, 2020
-
Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO ProjectBy J. Chae, D. Pecha, R. Andrews
The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro
Jan 1, 2005
-
Design Considerations For The Use Of Slurry Walls As Permanent Walls For Deep Rectangular Shaft Structures In Seismic Areas?Silicon Valley Rapid Transit ProjectBy Michael J. Lehnen
Slurry diaphragm walls are commonly used as both temporary excavation support walls, and permanent structural walls, for circular shafts and long rectangular structures (such as underground subway sta
-
An Active Proximity Warning System For Surface And Underground Mining ApplicationsBy W. H. Schiffbauer
NIOSH has developed an active proximity warning system called HASARD (Hazardous Area Signaling and Ranging Device) for warning workers as they approach known dangerous areas around heavy mining equipm
Jan 1, 2001
-
Mechanisms Involved In Reactive Flotation Of DolomiteBy A. El-Midany
Dolomite impurities are increasing in the currently mined phosphate deposits in Florida. Several research efforts have been conducted in various laboratories around the globe to find methods to econom
Jan 1, 2009
-
A preliminary study of the unsteady states of the ventilation parameters at the longwall face during the shearer operationThe ventilation conditions at the underground coal mines are influenced; first: by the disturbances of the natural nature (barometric pressure, methane liberation, etc.), and second: by the disturbanc
Jan 1, 2009
-
Anticipated Behavior Of Silty Sands In TunnelingBy Ronald E. Heuer, Debra L. Virgens
INTRODUCTION Behavior of clay soils in response to tunneling is reasonably well understood by reference to the tunnel stability factor NT = Pz/su (Peck, 1969; Heuer, 1974). With this analysis tool,
Jan 1, 1987
-
Construction Of A TBM Launch Box In A Complex Urban EnvironmentBy Vincent Tirolo
The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F
Jan 1, 2013
-
De Beers, Sandvik Team Up On Underground AutomationDe Beers? Finsch diamond mine began operation in the 1960s as a surface project using the latest technology available. During the 1990s, the operation, located about 160 km (100 miles) west of Kimber
Jan 1, 2008
-
The Knowledge Management Landscape in the Greek Coal Mining Industry - Mining, Metallurgy & Exploration (2024)By Christos Roumpos, Philip‑Mark Spanidis, Francis Pavloudakis
Coal mining operations are large-scale, long-term frameworks of high complexity. Mining organizations accumulate, develop, and leverage knowledge from diverse scientific and technological fields as a
Mar 16, 2024
-
Massive Tires Keep The Industry RollingOne of the biggest challenges for the mining industry is, quite literally, how to the keep the equipment rolling. There is a limited amount of companies that manufacture the 4.2-m- (14-ft-) tall, 5,
Jan 1, 2008
-
Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access ProjectBy A. J. Thompson
The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se
Jan 1, 2012
-
Punk Rock in PortlandBy Pat Wilmoth, Joseph P. Gildner, Dan Nowak, Shane Yanagisawa, Don Z. Painter, Gordon F. Revey
Frontier/Traylor is presently completing construction of twin tunnels for the Tri-County Metropolitan Transit District of Oregon’s (Tri-Met) westside lightrail system. The tunnels are each 4,550 m (1
Jan 1, 1997
-
Considerations For Blending Low-Rank and High-Rank Coals – Preprint 97-15By O. Ogunsola, M. Downing
This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr
Feb 24, 1997