Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Discussion on CSM and NTNU Penetration Rate ModelsBy E. Farrokh
CSM and NTNU models are among the most commonly used models in TBM performance evaluation. Due to increasing application of TBM in different tunneling conditions, modification became necessary for the
Feb 23, 2014
-
Blast-Induced Rock Damage and the Optimized Blast Design in a Mine: A Case StudyBy K. Kim
An analysis was conducted to determine the effects of blasting on slope stability and downstream comminution processes. To investigate these effects, the extent of blast-induced rock damage and the ma
Feb 23, 2014
-
A Systems Analysis Of Longwall Mining SystemsBy Raja V. Ramani
In many instances, the actual production from a longwall face does not equal the planned capacity. General problem areas which have been identified include face length and panel depth, face area and g
Jan 1, 1983
-
Development Of The Falcon ConcentratorsBy S. McAlister
This paper outlines the development of the Falcon enhanced gravity separator. Design objectives included continuous operation with sharp separations, mechanical simplicity, minimization of process wat
Jan 1, 1998
-
An Auxiliary Cross-Pit Mining System For Selective Removal And Replacement Of Soil And OverburdenBy David A. Fawcett
An auxiliary cross-pit mining system, working in tandem with the prime excavator, is evaluated technically, operationally and economically for application in the selective removal and replacement of s
Jan 1, 1981
-
High Performance Synthetic Ropes for Mine HoistingBy A. J. Guse
The primary limiting factor for hoisting capacity from great depths is the self-weight of steel wire ropes. Steel wire ropes are very suitable for mine hoisting due to their high strength and durabil
Feb 23, 2014
-
Simulation And Pilot Experiments On Pyrite Concentrate Separation In A Floatex Density SeparatorOperation of a pilot-scale Floatex density separator was studied using a pyrite concentrate slurry feed. Experimental measurements were further utilized in parameterization of a hindered settling simu
Jan 1, 2011
-
Cleaning Low-Quality Coal To Increase Mine Productivity And Improve Power Plant PerformanceBy Clark Harrison
It is not uncommon for overall quality of coal from a mine to deteriorate as the mine is developed or for an improved-quality coal specification to be imposed during the life of the mine. Either of th
Jan 1, 1987
-
Mechanical Agglomeration Of FluorsparBy George D. Haley
This report will be given in two sections. The first sec¬tion outlines techniques and equipment to form almond shaped fluorspar briquettes by means of briquet presses, and the second section outlines
Jan 1, 1969
-
Landsat Monitoring Of The Navajo Coal Surface MineBy Michael H. Inglis
The Technology Application Center, in conjunction with the U.S. Bureau of Mines Liaison Program, is studying the use of Landsat data for the monitoring of coal surface mine reclamation activities. Lan
Jan 1, 1979
-
Case Study Of Longwall Mining Effects On Water Wells (d7837608-758a-4c0d-8f16-7743cdca435a)By R. J. Matetic
Mining operations have long been accused of causing a disruption to local, domestic and agricultural water supplies. More recently, concern for water supplies has increased with the advent of high-ext
Jan 1, 1990
-
Rock Mechanics Applications To The Design Of Oil Shale Pillars ? IntroductionBy Jose F. T. Agapito
The mining engineer must be able to predict the structural behavior of the rock around underground openings so that he can answer questions relating to safety and economics. With the present status of
Jan 1, 1974
-
Kansas City: A Center For Secondary Use Of Mined Out Space ? IntroductionBy Truman P. Stauffer
Secondary use of mined-out space in underground limestone quarries is emerging in the Kansas City area where abandoned quarry sites are being renovated into warehouses, factories, and offices. Mining
Jan 1, 1973
-
Radiochemical And Toxic Of Water Resources Grants Mineral Belt, New Mexico ? ForewordBy Jim V. Rouse
Adverse water-quality impacts of uranium mining and milling activities on both surface- and ground-water resources in the Grants Mineral Belt have recently been documented.1 In some cases, the impacts
Jan 1, 1976
-
A Case-Study of Roof Support Alternatives for Deep Cover Room-and-Pillar Retreat Mining Using in-Situ Monitoring and Numerical ModelingBy M. Sears, K. Mohamed, J. Addis, J. Wickline, G. Rashed
To better understand the load shedding and the stress transfer on coal pillars due to room-and- pillar retreat mining in deep cover panels, researchers from the National Institute for Occupational Saf
Jan 1, 2019
-
Calibration of a Coal-Mass Model Using an In Situ Coal Pillar Strength StudyBy J. A. Rusnak, K. M. Mohamed, M. A. Van Dyke, M. M. Sears, G. Rashed
"Researchers from the National Institute for Occupational Safety and Health (NIOSH) recently developed a coal-mass model to realistically simulate the deformation and loading behaviors of the ribs of
Jan 1, 2018
-
The Zinc Corporation, Ltd. and New Broken Hill Consolidated, Ltd.By R. E. Le Messurier
GENERAL DESCRIPTION The mines are located at Broken Hill in the western part of New South Wales, Australia, 930 km west¬northwest of Sydney. Mining Methods Where pillars must be left between stop
Jan 1, 1982
-
The Cerro Verde 2 Concentrator: Design, Start Up and OperationBy P. Gelfi, J. Vanderbeek, J. Enriquez
"The Cerro Verde copper-molybdenum mining complex is located near Arequipa, Peru. A 108,000 t/d copper concentrator (C1 concentrator) commenced operation in late 2006 and was debottlenecked to a 120,0
Jan 1, 2017
-
Silica Sand And Main Industrial Minerals In MexicoBy L. C. Morales
During my College days in Mexico City, my Mineralogy Professor used to say "Mexico is the Horn of Plenty, rich in minerals, and it is easier to say which minerals are not found instead of stating all
Jan 1, 1994
-
The Development Of High Productivity Shotcreting At The Cannon MineBy J. Baz-Dresch
A custom-designed shotcrete system, consisting of an 8-m3 (10-yd3) transit mixer and a shotcrete spray boom carrier, is used bya 2-man crew to transport and place up to 25 m3 (32 yd3) of steel-fiber r
Jan 1, 1991