Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Coal Industry Leaders Meet to Discuss Methane IssuesBy William R. Yernberg
A conference on coalbed and coal mine methane was held March 27 and 28, 2000, in Denver, CO. The conference, organized by the Strategic Resource Institute, was attended by leaders in the coal mining a
Jan 1, 2000
-
Monitoring and Evaluation of Ground Movements Above a Deep Longwall Mine in the Eastern United StatesThe prediction and control of ground deformations due to underground mining are important considerations in the permitting, planning, and monitoring of coal mining operations. The prediction of mining
Jan 7, 2020
-
Time-dependent monitoring of seismic wave velocity variation associated with three major seismic events at a deep, narrow-vein mineBy Erik Westman, BEN WESTON, SETAREH GHAYCHI AFROUZ, KATHRYN DEHN
This study investigates the changes in seismic velocity of rockmass before and after three major seismic events to determine any potential identifiable precursory velocity changes associated with thes
-
Designing the Alaskan Way Tunnel to Withstand a 2,500-Year EarthquakeBy Gordon T. Clark, James R. Struthers, Celal Kirandag
INTRODUCTION Project Background The Washington State Department of Transportation (WSDOT) hired the Seattle office of Parsons Brinckerhoff to lead a team of consultants to produce an Environ-men
Jan 1, 2007
-
Health Of The Underground Construction Industry Evident At RETCIn spite of a global economy that continues to seesaw and a U.S. Congress that is at odds with the president and themselves, cities around the world are still spending billions on their infrastructure
Jan 1, 2011
-
Kickstarting Culture Change - SME Annual Meeting 2024By Andrew McGrath, Geraldine Lyons, Sarah Barcelona
In the dynamic and challenging modern industry landscape, understanding and unleashing the true role and contribution of technical teams is crucial to business success. The cyclical nature of industri
Feb 1, 2024
-
Special Shotcrete to Improve Open-Type TBM Performance Under Difficult ConditionsBy Sohta Takatsu, Hachiroh Mizubata, Shigeki Kudoh, Kazuya Takekuni, Yoshinori Yamada
A special type of shotcrete is used to improve the performance of open-type TBM in difficult situations. The Hakamagoshi and Johana tunnels are expressway evacuation tunnels of 3.2 km and 5.1 km in le
Jan 1, 2001
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005
-
Tunnel Boring Machine DevelopmentBy Martin Herrenknecht
Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u
Jan 1, 2008
-
Advances In The Practical Implementation Of Indicator GeostatisticsBy Clayton V. Deutsch
Indicator Kriging (IK) is being commonly applied to mineral resource assessment problems. More recently, indicator simulation has also been used for sensitivity analysis and difficult change of suppor
Jan 1, 1992
-
Mining and Metals Industry Structure and Interaction with the Circular Economy"INTRODUCTION In recent years, there has been increasing focus on environmental and social impacts of the extractive industries, climate change and resource scarcity. The concept of the circular econo
Jan 1, 2018
-
Statistical Significance Of Some Operating Parameters On Dolomite Removal From Phosphate Using Amphoteric CollectorBy A. M. Elmahdy
An amphoteric collector was tested for dolomite removal from phosphate ore. The effects of some operating parameters and their significance on the flotation of dolomite were studied using statisticall
Jan 1, 2007
-
Investigation of Occupational Accidents in Western Lignite Corporation by Using the Efficiency Assessment Approach Mining, Metallurgy and Exploration (a017703a-5db6-4c3d-94be-c80359dfab6f)By Cem Şensöğüt, Özer Ören, Yaşar Kasap
The mining sector, which has an important place in terms of raw material and energy supply, is referred as a sector with one of the highest fatal accidents in comparison with other sectors. In this ce
-
The Expectations For Coal: Is Our Government And The Coal Industry Prepared?By M. S. Miller
With prevailing assumptions that plentiful domestic coal reserves will be available for meeting our Nation’s expectations for on future low emission, coal-fired power plants, major government funding
Jan 1, 2004
-
East Side Access - Segmental Lining Design Challenges for Closely Spaced and Shallow TunnelsBy D. I. Smith
Constructing tunnels in congested urban areas requires tunnels to be placed closer together and with less cover than was previously necessary. Contract CQ031 of New York?s East Side Access project wil
Jan 1, 2008
-
Industrial Minerals 2001Editor’s note: As usual, the June issue features an industrial minerals review. And some thanks are in order. Thank you to the industrial minerals annual-review editor, to the technical committee
Jan 1, 2002
-
Mineralogic Sources Of Metals In Leachates From The Weathering Of Sedex, Massive Sulfide, And Vein Deposit Mining WastesBy S. F. Diehl
Weathered mine waste consists of oxidized primary minerals and chemically unstable secondary phases that can be sources of readily soluble metals and acid rock drainage. Elevated concentrations of met
Jan 1, 2011
-
The Effect Of Bit Geometry And Size On Cutting Parameters In Linear CuttingBy A. W. Khair
This paper deals with the design characteristics of cutting tools and the operating parameters these tools are usually subjected to. Eight types of cutting tools/bits with different geometrical shapes
Jan 1, 2001
-
Beach Sewer Tunnel Rehabilitation ? IntroductionBy Albert Ruiz
South Coast Water District (District) operates the Beach Interceptor Sewer Tunnel (BIST) in South Laguna, Orange County, California between Mon-arch Beach and Aliso Beach (Figure 1). The 10,424-foot l
Jan 1, 2008
-
Establishing Geotechnical Baseline Values for Deep Soft Ground TunnelsBy John E. Newby
The Brightwater Conveyance System consists of four tunnel segments in three tunnel con-tracts, comprising over 21,760 m (71,400 ft) of pressurized face tunneling in complex glacial and non-glacial sof
Jan 1, 2008