The interaction between excavation of Trojane tunnel and an anchored pile retaining wallBy V. Jovicic, J. Likar
The knowledge of the geological sequence and hydrological conditions in the area of portals was the basis for the design of the entry of the highway into tunnel Trojane. Mudstone, claystone and sandst
Jan 1, 2003
-
Analysis of the Dispersion Variance Using Geostatistical Simulation and Blending PilesThe additive property of dispersion variances was found experimentally by D.G. Krige using data from the gold deposits of the Witwatersrand. In this property, called ?Krige?s relationship?, the disper
Jan 1, 2014
-
The Impact Of Mixed Fleet Hauling On Mining Operations At Venetia MineBy J. Krzyzanowska
Paper written on project work carried out in partial fulfilment of Bachelor of Engineering-Mining Venetia Mine, an open-pit diamond mining operation in the Limpopo Province of South Africa, current
Jan 1, 2007
-
Aspects Of Time-Dependent Deformation In Hard Rock At Great DepthBy K. Drescher
Excavations in deep level hard rock mines show rheological or time-dependent deformation responses to mining-induced stresses. These are generally not as dramatic as those seen in soft rock environmen
Jan 1, 2003
-
The Determination Of The Residual Strength Of Hard Rock Crush Pillars With A Width-To-Height Ratio Of 2:1By D. P. Roberts
This paper reviews the use of crush pillars on mines in the Bushveld Complex and the Witwatersrand Supergroup. Stress measurements were undertaken in order to determine the residual strength of these
Jan 1, 2005
-
On the Reduction of Algorithmic Smoothing of Kriged EstimatesUtilizing a very large database from a mined-out area on a South African gold mine, the relative efficacy of a method to mitigate the smoothing effect introduced by the algorithmic constraints imposed
Jan 1, 2014
-
Witwatersrand Gold Reef Evaluation: The ?Variancegram? ToolBy C. Lemmer
The resolution with which the different categories of resources are forecast for Witwatersrand gold reefs should ideally tie in with block sizes that are optimal in terms of the variability structures
Jan 1, 2014
-
Measurement of induced stress under high rock stress by compact conical-ended borehole overcoring techniqueBy K. Sugawara, H. -S. Jeong, Y. Ishiguro, J. Otani, Y. Obara, A. Hirata
A series of measurements of induced stress by the Compact Conical-ended Borehole Overcoring (CCBO) technique was performed within rock mass around a tunnel excavated in a region that an underground po
Jan 1, 2003
-
Process mineralogy: adding the value in the minerals value chain, D. ChettyBy D. Chetty
Process mineralogy forms an integral part of geometallurgy, with ore body characterisation being but one piece of the puzzle in optimising value derived from ore. This value is not only financial, but
Jan 1, 2020
-
Application of a Localized Direct Conditioning Mineral Resource Modelling Technique for Medium- and Long-Term Planning of Underground Mining OperationsAt the exploration stage for new mining projects or for medium- and long-term areas of existing mines (typical of South African gold mines), drilling data is on a relatively large grid. This grid is n
Jan 1, 2014
-
System Ductility Of Long Fibre Reinforced ShotcreteBy H. A. D. Kirsten
Shotcrete has become a strategic component of support in underground mines. The ductility of reinforced shotcrete makes it a safe and economic means of surface support under adverse static and dynamic
Jan 1, 1998
-
Prediction of the geological condition ahead of the tunnel face in TBM tunnels by geostatistical simulation techniqueBy K. Aoki, Y. Mito, S. Shirasagi
The authors developed the TBM Excavation Control System (the TBM Navigator), in order to realize the advanced observational construction. During the excavation using this system, the rock strength val
Jan 1, 2003
-
Technical Note: The Palabora High Reach Rig - IntroductionBy D. P. Penswick
The Palabora open pit is scheduled to cease operations in 2002. While the ore body continues below the bottom of the final pit shell, the stripping ratio precludes further economic open pit mining. Pa
Jan 1, 1997
-
The Application Of Numerical Modelling To The Design Of Electric FurnacesBy T. Plikas, L. H. Gunnewiek, L. Oshinowo
Electric furnace smelting is one of the principal unit operations for ferroalloy production, and increased process intensity, improved availability, minimal maintenance and a lon
Jan 1, 2004
-
Simulation of the mechanical behaviour of a fracture in shear: implication of the distribution of the void spaceBy J. Riss, S. Gentier, A. Marache
The study of the hydromechanical behaviour of fractured rock masses requires a detailed knowledge of the isolated fractures. The aim of the paper is the simulation of the evolution of the void space,
Jan 1, 2003
-
Co-Generation: A Challenge For Furnace Off-Gas Cleaning SystemsBy E. S. Schubert
Keywords: co-generation, furnace CO-gas cleaning, disintegrator scrubber, Theisen In a closed, electric, reduction furnace, no oxygen enters the furnace from the surrounding environment. The off-g
Jan 1, 2011
-
Slope Design For The East Wall Of Mantoverde Mine, Chañaral, ChileBy Antonio Karzulovic, Ricardo Sepulveda, Manuel Schellman
Mantoverde Division of Empresa Minera Mantos Blancos S.A., Anglo American Chile, developed an open pit mine to exploit copper oxide ore. Mantoverde mine is located in the Province of Chañaral, Norther
Jan 1, 2006
-
Slope Management At Navachab Gold Mine, NamibiaBy Frik Badenhorst, René Roux, Peter Terbrugge
This paper presents a case study where economics dictated an aggressive slope angle and where an appropriate slope management programme allowed successful completion of mining to 190m below surface.
Jan 1, 2006
-
Pit Wall Failures On ?Unknown? StructuresBy Phillip M. Dight
A number of impending and actual pit wall failures have been observed and documented which have been interpreted to initiate on newly generated structural features. This infers failure through intact
Jan 1, 2006
-
Investigating continuous time open pit dynamics - SynopsisCurrent mine production planning, scheduling, and allocation of resources are based on mathematical programming models. In practice, the optimized solution cannot be attained without examining all pos
Jan 1, 2008