Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
OFR-113D-93 Coal Mine Injury Analysis: A Model For Reduction Through Training - Volume V: Mine Safety Management Case StudiesBy R. V. Ramani
One area of study in the Coal Mine Injury Analysis project was to illustrate and enhance the ability o mine safety management personnel to apply analytical techniques to Injury experience data and to
Jan 1, 1993
-
RI 9667 - Effectiveness Of Selected Diesel Particulate Matter Control Technologies For Underground Mining Applications: Isolated Zone Study, 2003By James D. Noll, Jon A. Hummer, Shawn E. Vanderslice, Aleksandar D. Bugarski, George H. Jr. Schnakenberg, Steven E. Mischler, Larry D. Patts
The National Institute for Occupational Safety and Health designed and conducted a study in an underground metal mine to assess the effects of selected diesel emissions control technologies on the con
Jan 5, 2006
-
Methods Of Analyzing Coal And Coke - IntroductionBy A. C. Fieldner
THE Bureau of Mines has received many requests for Information concerning the methods its laboratories use for analyzing coal and coke and determining their heating value. The fuel investigations now
Jan 1, 1951
-
RI 6057 Transfer Of Heat From Helium At High Temperatures - Physical Characteristics Of Ceramic Heat Exchangers ? Summary And IntroductionBy John J. S. Sebastian
A laboratory-scale investigation was made of the basic problems involved in developing a ceramic heat exchanger to operate at high temperatures for using nuclear heat from gas-cooled process-heat reac
Jan 1, 1962
-
RI 8935 - Adding Steam To Control Dust in Mineral ProcessingBy Andrew Cecala
The Bureau of Mines performed tests to compare the effectiveness of steam and of water sprays to reduce respirable dust levels at mineral processing plants. By applying 0.22 wt pct water vapor as stea
Jan 1, 1985
-
OFR-79(2)-76 Concept Feasibility Study For Training Equipment To Improve Coal Productivity - Volume 2 Of 2 ? PurposeBy Anthony E. Szczuka
The purpose of this design note is to document the data that has been received from manufacturers, coal companies, training centers, government agencies, etc., that pertains to the completion of the C
Jan 1, 1976
-
IC 8369 Limestone Resources In Western West VirginiaBy David J. Kusler
This study is an appraisal of the feasibility of recovery and the possible chemical and physical uses of the limestone from the Greenbrier Formation in western West Virginia. Data on minability, occur
Jan 1, 1968
-
OFR-51-73 Survey Of Dust Control Research - Survey Of Research In Dust Sampling Instrumentation And Dust Control - I. IntroductionBy R. D. Saltsman
This report is in fulfillment of Contract No. H023001.5 awarded to Bituminous Coal Research, Inc., on November 15, 1972. The scope of the work under this contract was to perform a two-phase survey for
Jan 1, 1973
-
OFR-20-81 Combined Fire/Rot Retardant Treatment For Wood Mine TimberBy Bernard Baum
Combined preservative/fire retardant systems were pressure impregnated into Douglas fir and Ponderosa pine samples and evaluated for decay, flammability, and mechanical properties. The objective of
Jan 1, 1978
-
OFR-98-75 Coal Mine Vacuum SweeperA mobile vacuum sweeper to remove loose coal and coal dust from underground coal mine workings was designed, built, tested, and evaluated. The design was based on an extensive test program. Pick up
Jan 1, 1975
-
IC 7291 Suggested Hoisting-Signal Code For Slope Coal Mines And For Shaft Mines Having Only One Level ? IntroductionBy D. Harrington
The code of hoisting signals for use in mines hoisting from one level, as suggested in this publication, is submitted to induce consideration of this subject by representative groups of the coal-minin
Jan 1, 1944
-
OFR-98-83 Evaluation Of Charged Walter Sprays For Dust ControlBy J. McCoy
Charged sprays and fog have been evaluated for reducing respirable dust concen¬trations. Charged spray technology was reviewed for effectiveness, equipment and theoretical considerations. A mathematic
Jan 1, 1983
-
OFR-136-84 Ultralightweight Oxygen ContainerBy Ben Aleck
The objective of this program was to adapt Space Shuttle technology on high-performance spherical pressure vessels to cylindrical pressure vessels. Specifically, a cylindrical aluminum liner overwrapp
Jan 1, 1983
-
Longwall Shield Recovery Using Mobile Roof SupportsBy Allen McComas, Frank Chase, Phyllip Worley
Longwall mining has gained the reputation as being the safest extraction method in underground coal mines. However, one of the most difficult tasks associated with longwall mining is moving the face
-
OFR-55-86 Improving The Performance Of Tunnel, Raise And Shaft Boring Machines For Coal Mine ApplicationsBy Levent Ozdemir
A 6-ft. diameter laboratory tunnel, raise and shaft boring machine was designed and constructed to carry out research investigations to enhance the performance of mechanical rock excavation equipment.
Jan 1, 1986
-
Pneumatic Monitoring Systems ? ObjectiveTo provide a flexible, low-maintenance, low-cost continuous mine air monitoring system as an alternative to conventional fixed-point, electronic monitoring systems. Background Continuous monitor
Jan 1, 1988
-
OFR-70-82 Keep Alive Mercury Mine Lighting SystemBy J. C. Engel
Recent innovations in mine safety include the use of mercury vapor lamps for mine vehicle illumination. Such lamps, however, extinguish whenever the line voltage at the machine momentarily sags or is
Jan 1, 1979
-
OFR-90-75 Digital Simulation Of Diesel Exhaust Contamination Of Mine Ventilation Systems ? SummaryBy R. Stefanko
This study concerns itself with the effects of diesel exhaust on mine ventilation systems. The approach here consisted of the development of mathematical models for emissions, dilution, and dispersion
Jan 1, 1974
-
OFR-203-82 An Application Of The Dedicated Wire Technique To Improve Coal Mine Trolley Carrier Phone CommunicationsBy Robert L. Lagace
A whole-mine experiment to assess the practical feasibility and utility of the dedicated-wire technique for overcoming poor trolley carrier phone system performance at a large underground coal mine wa
Jan 1, 1981
-
OFR-120-85 Retrofit Noise Control Of Underground Load-Haul-Dump MachinesThis report summarizes the work performed under USBM Contract No. H0395041. The primary objective of this work was to extend the noise control technology developed under earlier USBM projects to a wid
Jan 1, 1984