Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Impact of Blasting Sequence on Dilution and Benefit Through Ore Displacement Control Using Three-Dimensional Modeling

    By Paulo C. Fernández A, Sergio Matamala V, Claudio C. Gajardo, Christian A. Rees P

    In fragmentation processes in open-pit mining, it has been observed that there are many opportunities for improvement if greater control of ore displacement in blasting is achieved, reducing the perce

    Jan 26, 2026

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • ISEE
    Western Europe's Largest Underground Blast

    By P McConnell, T Garrigan

    Tara Mines Limited, in Ireland, is Western Europe's largest zinc mine. Annual metal production, from 2.5 million tonnes of ore, consists of 180,000 tonnes of zinc and 34,000 tonnes of lead.

    Jan 1, 1989

  • ISEE
    Mitigation Research of Covering Marine-bottom Ordnance

    By Gregory Hempen, Thomas Keevin, Russell Wilcox, William Wild

    The Department of Defense Strategic Environmental Research & Development Program (SERDP) awarded funding for evaluation of procedures to mitigate peak pressures and energy flux density in the water co

    Jan 1, 2011

  • ISEE
    Destress Mass Blast in the North Regional Pillar at Brunswick Mine

    By Philemon Desrochers, Ken Qian Liu

    Following the success of the West Ore Zone distress mass blast in 2001 at Brunswick Mine, a similar approach was taken to distress the North Regional Pillar (NRP) which contained over 3 million tonnes

    Jan 1, 2004

  • ISEE
    Epic Blast of 275 US Ton (250 tonnes) Sets Benchmark in Opencast Mining Arena in Environmental Sensitive Area With Desired Fragmentation and Muck Profile.

    By Tapas Kumar Mukherjee, Sujit Kumar, Sanjay Kumar Singh

    This paper dwells on the epic blast conducted at Tata Steel’s captive coal mine in India and the insights drawn from it. Optimal blast design parameters had to be ascertained for operating benches (6.

    Jan 1, 2019

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013

  • ISEE
    Ring Blasting Design Modeling and Optimization

    By María Rocha, Benjamín Cebrián, Roberto Laredo

    "Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all

    Jan 1, 2017

  • ISEE
    Blasting Effects of a Non-Pressure Liquid Tank Task 662

    By David S. Shatzer, Michael R. Purcell

    Current world events have demonstrated the use of commercial vehicles, other unconventional modes of transportation and unusual materials as explosives or incendiary weapons, affecting commerce, disru

    Jan 1, 2004

  • ISEE
    Confiner Strength and Thickness Effects on Detonation Characteristics of Emulsion Explosives

    By D. Lynn Gordon, Larry B. Weston, Michael W. Manhart, Patrick R. Bowden, Michael W. Redmond

    Study of confinement effects on detonation characteristics and subsequent fitting form development as a function of confiner strength and thickness.

    Feb 1, 2020

  • ISEE
    Investigation of Cautious Blasting Model Applied During Tunneling of Kadikoy-Kartal Subway Construction

    By Ali Kahriman, Olivio Angelini, Ibrahim Sefer, Burak Ekmen, Koray Arpak, Ertugrul Kaya, Yucel Karakus, Abdullah Sak, Aziz Ozdemir

    In recent years, in order to bring solution to traffic intensity arising from transportation problems and facilitate public transportation in the modern world in paralel to urbanization and to the inc

    Jan 1, 2010

  • ISEE
    O'Shaughnessy Dam Hydroelectric Project

    By Alan Hooper, James E. Mischler

    Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27

    Jan 1, 1986

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Dr. Calvin J. Konya, Anthony Konya

    Beginning on the Niagara Power Project, presplitting became a widely used blasting technique to obtain smooth walls in mining and construction projects reducing scaling, creating more stable pits, all

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Anthony Konya, Calvin J. Konya

    This paper will present this research which correlates the borehole pressure to variables such as the Young's Modulus and Tensile Strength of various rock types giving blast designers the ability to d

    Feb 1, 2020

  • ISEE
    Influence of the Interaction of Open Pit and Underground Mining Blasting

    By Darío Innamorati, Jorge Oliva

    Cerro Vanguardia is a known gold and silver deposit located in the province of Santa Cruz, Argentina. The mine has been in operation since 1998 and is thought to be one of the most important mines in

    Jan 21, 2025

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

    Feb 1, 2020

  • ISEE
    Full-Scale Trials Involving the Open Detonation of Large Bombs Close to Structures.

    By Ambrose Buchanan, Rob Farnfield, Charles Adcock

    Beginning on 7th September 1940 the City of London was subjected to 57 consecutive days of bombing in what became known as the ‘London Blitz’. To commemorate the 70th anniversary of this event a telev

    Jan 1, 2011

  • ISEE
    Mine To Mill Process Integration And Optimisation – Benefits And Challenges

    By Walter Valery, Sarma Kanchibotla

    Due to the global financial crisis, the world economy has turned upside down and most major economies in the world are facing severe recession for the past one and half year. During this period most c

    Jan 1, 2010

  • ISEE
    Comparison of International Vibration Standards for Quarry Blasting Close-in to a Residential Structure

    By Johan Gjødvad, Catherine Aimone-Martin, Charles Dowding, Mathias Jern

    A residential structure adjacent to a quarry in Ohio was instrumented to record structure motions, resulting wall strains and existing crack displacements in response to close-in blasting within 82 m

    Jan 21, 2025

  • ISEE
    Blast design optimization system to improve mining downstream operations by adapting the explosive energy to the rock mass based on drill monitoring data

    By P. Couceiro, J. Navarro

    A new methodology to perform selective blast designs by adapting the explosive energy, hole by hole (or in the hole), to the rock properties as a combination of their strength properties through the X

    Jan 1, 2024