State-Of-Art Working Platform For Heavy Equipments Used For Deep Foundation ConstructionBy Arunsiva R., Sivaranan S., Venugopal B., Kumaran M.
Being a rapidly developing country, India is undergoing a massive infrastructure phase change remarkably. The construction industry is already set to boom, but the time and space constraints necessita
Sep 1, 2022
-
-
A Numerical Study On Behavior Characteristics Of Steel-Concrete Composite Drilled ShaftsBy Hyu-Soung Shin
This study is concerned with the characteristics of the behavior of steel-concrete composite drilled shafts, a material that is used for large bridge foundations, and especially for weak submerged gro
Jan 1, 2007
-
Behavior Of Large Bored Piles With Grouted EndBy Zhang Yaonian
This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati
Jan 1, 2004
-
Reducing Downdrag Loads With BitumenBy J. -L. Briaud
This presentation shows the results of laboratory and field tests to date for the NCHRP project entitled "Downdrag on Bitumen-coated Piles". This project required to test a variety of bitumens in the
Jan 1, 1991
-
The Waterloo Barrier - A Sealable Joint Steel Sheet Piling For Groundwater Control And Remediation - Presented At The Deep Foundations Institute Annual Meeting & Conference Toronto, Ontario, October 15-17, 1997 - SummaryBy Murray Gamble
A new type of groundwater cutoff wall has been developed at the University of Waterloo. The Waterloo Barrier? is a steel sheet piling system that incorporates a sealable cavity at each interlocking jo
Jan 1, 1997
-
Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building TechnologiesBy P. Arz
With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al
Jan 1, 1989
-
Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NYBy Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht
The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou
Jan 1, 2018
-
Building Above And Excavating Below An Iconic Building In ManhattanBy John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta
The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Open Cell Sheet Pile® Dock In Remote Alaska Provides Innovative And Cost-Effective SolutionBy Dempsey S. Thieman
Innovative marine bulkhead design and construction techniques were used in the fast-track design and construction of a high-capacity, deep-water dock in the highly seismic region of Alaska?s Aleutian
Jan 1, 2008
-
-
Real-Time Anchor Testing and Data ManagementBy Bora Okumusoglu, Devon K. V. Mothersille
"AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front
Jan 1, 2017
-
Cofferdam Failures ? IntroductionBy Richard J. Hartman
This presentation identifies some of the more common problems associated with cofferdam construction. After the various problems are identified, they are briefly explained and possible solutions and p
Jan 1, 1987
-
Stabilization of Materials – Upgrading Of Soils and Sediments to Use in Geo-ConstructionsBy Helene Kennedy, Josef Macsik, Yvonne Rogbeck, Gregory Makusa, Göran Holm
"Constructions activities in cities often imply large volumes of surplus material which could be treated by stabilization for re-use in new geotechnical constructions. Modification of dredged sediment
Jan 1, 2015
-
Evaluation Of A New P-y Analysis Tool For Lateral Analysis Of Drilled Shafts Using Load Tests In NevadaBy David H. Sanders, Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan
Large-diameter drilled shafts (DS) are a critical part of a seismic-resistant system, and therefore it is important to be able to accurately model lateral resistance. To undertake the lateral load ana
-
-
Forensic Evaluation Of Bored Piles For A Factory Project At JhajjarBy Sanjay Gupta, Sorabh Gupta, Ravi Sundaram
A geotechnical forensic evaluation of piles for an industrial facility in Haryana was performed to assess the quality of the piles and to evaluate piles installed using two different types of rigs. Lo
Sep 1, 2022
-