Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Minimising The Environmental Impact Of Construction DewateringBy Peter Jackson
The dewatering of the large construction pits required for major infrastructure projects often has a significant impact on the environment. This is particularly so in urban areas and where groundwater
Jan 1, 2000
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? IntroductionBy R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
Quality Control For Installation Of Augered Cast-In-Place PilesBy Francis J. Arland
The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh
Jan 1, 1997
-
Innovative Use Of Micropile Load Test Data For 18th Street Expressway BridgeBy Lance A. Roberts
Micropiles are commonly utilized for applications other than foundation retrofit. In bridges, for example, micropiles can serve as the permanent foundation elements or can be used in temporary suppor
Jan 1, 2009
-
Some Experience With Large Diameter Caissons ? SynopsisBy I. H. Wong
The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee
Jan 1, 2010
-
Design And Construction Aspects Of A Deep Basement In Dublin - SynopsisBy Philip J. Daynes
As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase
Jan 1, 2003
-
2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2By Bengt H. Fellenius
Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl
Jan 1, 1994
-
The Bawang Pile ? A New Type Of Pile ? SynopsisBy B. Broms
The "Bawang Pile" (in english "onion" pile) described in the article consists of a cased concrete shaft and an expanded base. The steel casing is first driven by an internal drop hammer and then the b
Jan 1, 2010
-
[Halliburton / Brown & Root Report] - Brown & Root Civil - GeoJet Foundation System - I. IntroductionBy Gordon] [Reavis
Halliburton Services and Brown & Root have developed a unique foundation system that blends oilfield and construction technologies to construct deep foundations which offer significant advantages acro
Jan 1, 1993
-
Cyclic Degradation Of Pile Foundations For Offshore Wind TurbinesBy Fabian Kirsch
Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load
Jan 1, 2011
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Dynamically Cast-In-Place PilesBy John J. Vieaux
Allowable loads on Dynamically-Cast-In-Place Piles (the Franki type) can be correlated with N values from the Standard Penetration Test. Using a constant developed by Nordlund, a conservative value fo
Jan 1, 1984
-
The Analysis Of FEM On The Anchorage Consolidation For Stabilizing A Tunnel With Thick Overburden ? SynopsisBy J. M. Pei
In this paper, the nonlinear finite element analysis is used to study the support system of a tunnel which is designed to pass through deep-embeded stratum. The rock mass is rather intact, though a se
Jan 1, 2010
-
Interpreted Residual Load In An Augered Cast-In-Place PileBy Timothy C. Siegel
Accurate representation of the geotechnical resistance distribution is critical in evaluating the performance of piles and pile groups for design. A current practice is to infer the geotechnical resi
Jan 1, 2009
-
Underpinning The Existing No. 1 Subway Line At The World Trade CenterBy Richard Crockford
The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne
Jan 1, 2008
-
Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, PaGENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA
Jan 1, 2001
-
Impact Of Environmental Regulations On Pile Foundation Design And Construction Using Diesel HammersBy R. D. Short
Environmental regulations for noise and air pollution are directly affecting the type of equipment and construction techniques being utilized for pile driving construction using diesel hammers in Cali
Jan 1, 1989
-
Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press FoundationBy David C. Kraft
A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki
Jan 1, 2003
-
Offshore Wind Turbine Foundations - In Denmark And Belgium - IntroductionBy Jørn H. Thomsen
This paper presents the experience gained and the lessons learned over the last decade within the numerous offshore foundation projects undertaken in the offshore waters of Denmark and Belgium by COWI
Jan 1, 2013
-
Soil Nail Stabilisation For A 14.5m Deep Excavation At Uncontrolled Fill GroundBy Shaw-Shong Liew
This paper presents the processes of investigation, analysis, design, construction and monitoring of soil nail stabilisation work to facilitate a 14.5 m deep excavation at an uncontrolled fill ground.
Jan 1, 2006