Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hard Gold Alloys

    By Rainer Süss

    An investigation was carried out by Mintek to investigate the influence of a range of alloying additions (vanadium, cobalt, zirconium, antimony and germanium) on the formability and hardenability of a

    Oct 1, 2003

  • CIM
    Erosion Control Hollinger Mine Tailing Site

    By I. M. Gordon

    "INTRODUCTIONThe Hollinger tailing disposal plant is situated about 1 1/4 miles south of the mill. The area available for tailing covers 620 acres and is roughly 1 ¼ miles long by ¾ mile wide.Tailing

    Jan 1, 1969

  • CIM
    Interpreting Core Data and Rock Quality Information for Stope Design

    Stope performance and geotechnical information at Xstrata Zinc George Fisher Lead-Zinc-Silver mining operations have been analysed in detail since the beginning in October 2003. This work has been inc

    Apr 1, 2005

  • CIM
    Revisiting Ground Vibrations due to Mining Equipment Motion (7108fd07-daac-4ac4-863b-5e76cda3b2f0)

    By T. G. Joseph, M. Welz

    ABSTRACT: Joseph (2002) introduced passive seismic monitoring to measure mining equipment performance. This paper evaluates the potential of passive seismic monitoring to correlate mining equipment op

    Jan 1, 2011

  • CIM
    Multi-Stage Hydrocyclone Circuit Optimization by Computer Simulation

    By G. E. Agar, R. Stratton-Crawley

    "The applicability of a hydrocyclone model to simulation of the cyclone banks in a multi-stage sandplant circuit producing mine back fill has been demonstrated. The model ha~; been used in conjunction

    Jan 1, 1979

  • CIM
    Establishing Total Airflow Requirements for Underground Metal/Nonmetal Mines with Tier IV Diesel Equipment

    By J. D. Stinnette

    Traditionally, airflow requirements for diesel equipment operating in underground environments such as mines and tunnels were determined by multiplying the vehicle power by a ventilation rate that was

    Aug 1, 2013

  • CIM
    Bulk Handling and Mixing of Mill Reagents at Ecstall Mining Limited, Timmins, Ontario

    By S. Y. Mostowy, P. W. M. Shibley

    "When Texas Gulf Sulphur Company discovered the Kidd Creek ore body in 1964, a crash program began almost immediately for the design and construction of a modern concentrator. It was necessary to mill

    Jan 1, 1970

  • CIM
    Sustainable use of Geotechnical Data for Improved Mine Planning and Design Through Multi-Parametric Modeling

    By Andrew D. Lapworth

    The use of geological and grade models has been standard practice in mine design for many years now, with a wide range of software available to create and analyze the models. Although geotechnical par

    May 1, 2007

  • CIM
    Selecting Effective Hydrogen Production and Delivery Optionis for Mining Applications

    By Kimberly M. Curran

    The path by which hydrogen supply is provided to any end use application will have a strong effect on the specific economics and price stability for the product supply and the flexibility with which i

    May 1, 2007

  • CIM
    Novel Solution Injection Technology for In-Situ Leaching of Weathered Crust Elution-Deposited Rare Earth Ores

    By Zhigao Xu, Ruan Chi, Zhenyue Zhang, Yaoyang Ruan, Zhengyan He

    Weathered crust elution-deposited rare earth ore is a specific rare earth resource in China that is rich in middle and heavy rare earths. From surface to bottom, the weathered crust elution-deposit ra

    Jan 1, 2014

  • CIM
    ANCIENT VOLCANOGENIC MASSIVE SULFIDE DEPOSITS IN CHINA - Sedimentary Exhalative Massive Sulfide Deposits in the Proterozoic Langshan - Zhaertai Rift in ChinA

    By Xuehui Xia

    Abstract -There are a number of sedimentary exhalative massive sulfide (SEDEX) deposits in the Proterozoic Langshan-Zhaertai rift at the western segment of the northern margin of the North China platf

    Jan 1, 1999

  • CIM
    Review on Separation and Treatment of Thorium Resources

    By Zhigao Xu, Ruan Chi, Zhenyue Zhang, Yaoyang Ruan, Zhengyan He

    Thorium is frequently the main radioactive element in rare earth ores and is a resource that can potentially substitute for uranium. Thorium must be separated from rare earths in order to obtain produ

    Jan 1, 2014

  • CIM
    Molten Oxidation of Copper Slag for Magnetite Precipitation

    By Takashi Nakamura, Atsushi Iizuka, Yong Fan, Etsuro Shibata

    Magnetic separation of precipitated magnetite as iron resources in copper slag is one of the potential effective ways to recycle the slag. It is preferable to convert molten fayalite slag after copper

    Jan 1, 2014

  • CIM
    Destructive Testing of Wire Ropes at the Materials Testing Laboratory

    By Marcel M. Djivre

    The paper will outline the methods and test procedures including the evaluation criteria currently used at the Materials Testing Laboratory (MTL), Sudbury, Ontario, Canada, a laboratory approved by th

    May 1, 2001

  • CIM
    The Captain North Extension Zinc-Lead-8i1ver Deposit Bathurst District, New Bmnswick

    By K. D. A. Whaley

    The Captain North Extension deposit consists of five sulfide lenses hosted in cherty and chloritic metasediment that is bounded by quartz-eye rhyolite and laminated rhyolite. Lens 2 consists of sphale

    Jan 1, 1992

  • CIM
    Renewable Energy and Property Re-Use On Surface Mined Lands

    By George Carico

    Research and related demonstration projects are being conducted in West Virginia on both existing and former coal surface mine lands to determine potential post-mine land re-use options that offer the

    Aug 1, 2013

  • CIM
    The Evolution of the Electric Arc Furnace as a Pyrometallurgical Smelting Tool

    By R. C. Urquhart

    Since the first use of the electric arc furnace Henri Moissan (1892) and its use by Paul Hérholdt (1902) to melt steel, it has been successfully used as a pyrometallurgical smelting tool in the produc

    Jan 1, 2014

  • CIM
    Study of Separation of Terbium and Dysprosium from Other REE by Solvent Extraction

    By Carlos Antônio de Morais, Renata Dias Abreu

    The present work describes a study of the separation of terbium and dysprosium from heavy RE concentrate through a solvent extraction circuit in a counter-current system. As the efficiency of the REE

    Jan 1, 2014

  • CIM
    The Derni Cu-Co Massive Sulfide Deposit, Qinghai Province, China: Ultramafic Volcanic-hosted Submarine-exhalative Mineralization

    By Yuwang Wang, Yanggeng Tan, Kezhang Qin, Zengqian Hou

    Abstract- The large Derni Cu-Co (-Zn) deposit in Qinghai Province exhibits unusual geological features, and its genesis is controversial. Based on previous research and detailed field investigations,

    Jan 1, 2000

  • CIM
    Hydroxamate Collectors for Rare Earth Minerals Flotation

    By L. Xia, B. Hart, K. Douglas1, S. C. Chelgani

    Development work to optimize a flotation flowsheet for rare earth element (REE) recovery is underway. The original approach used alkyl phosphates and phosphoric acid ester as collectors to concentrate

    Jan 1, 2014