Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Engineering Excellence into Large Diameter Drill and Blast Shaft Sinking Stages and Galloways for Safety and Productivity

    By T. E. Wakefield

    "Final Galloway (stage) designs for vertical drill and blast shaft sinking projects evolve from complex thought patterns which integrate operational processes, systems and methods of communication, po

    Jan 1, 2019

  • CIM
    New Facilities for Calibrating Gamma-Ray Spectrometric Logging and Surface Exploration Equipment

    By P. G. Killeen

    Proper calibration of portable gammaray spectrometers and spectrometric logging equipment is essential if they are to be used for accurate quantitative determinations of radioelement concentrations. I

    Jan 1, 1978

  • CIM
    Teniente Converter- A Decade of Achievements at the Southern Peru Ilo Smelter

    By E. Herrera Alarcón, L. Mariscal Samaniego

    The Teniente Converter (wet charge type) was commissioned in august 1995 and was designed to smelt 744 tpd (metric tons per day) of dry copper concentrates. Its products are white metal (73% Cu) that

    Jan 1, 2007

  • CIM
    Two Years? Experience With Copper Anode Casting At Hudson Bay Mining and Smelting Co., Ltd.

    By A. A. McDonald

    Anode casting has been in operation for two years in Hudson Bay Mining and Smelting's Flin Flon smelter. The new plant allows all casting to be done on one shift and so achieves considerable labo

    Jan 1, 1977

  • CIM
    Full-Face Boring by the Undercutting Method

    By P. O. Sandstrom

    "Atlas Copco is introducing a new patented method for full-face boring. This paper presents the basic principles of the boring action and discusses the present experience regarding performance and cos

    Jan 1, 1971

  • CIM
    The Co-operative Committee System of the Consolidated Mining and Smelting Company of Canada, Limited

    By Selwyn G. Blaylock

    I.-THE HISTORY OF THE SYSTEM TO trace the history of the development of the Co-operative Committee System in The Consolidated Mining and Smelting Company of Canada, Limited, one must look backward a

    Jan 1, 1936

  • CIM
    Pulverized Coal as a National Asset

    By N. T. Avard

    THE profitable disposal and utilization of much of our slack coal, lignite, and other low-grade fuels is one of the major problems facing the coal mining industry of Canada today. It is my belief that

    Jan 1, 1937

  • CIM
    Modeling & Software for Control Purposes of a Direct Blister Smelter

    By Tuula Mäkinen, Lauri Pesonen, Peter Björklund, Jouni Pihlasalo, Mikko Korpi

    Outotec Direct Blister Flash Smelting technology has proved to be an efficient and environmentally friendly way to treat copper concentrates from the Zambian Copperbelt at Konkola Copper Mines' (

    Jan 1, 2011

  • CIM
    Water – An Industrial Raw Material

    By J. F. J. Thomas

    "AbstractBoth the quantity and quality of waters available as raw materials are important to Canadian industry and to the national economy. The huge demands of many Canadian industries is illustrated

    Jan 1, 1952

  • CIM
    Geochemical methods for the discovery of blind mineral deposits (7d3f5bad-e4f1-459a-85b8-0e3f33752c98)

    By R. W. Boyle

    "EDITOR'S NOTEPart 1 of this paper, published in the August issue, covered lithochemical surveys based on major, minor and trace elements in whole-rock samples from primary enveloping halos.Part

    Jan 1, 1982

  • CIM
    Distribution and Characteristics of the Sulphide Ores of the Timmins Area

    By D. R. Pyke, R. S. Middleton

    "Three main types of base metal sulphide mineralization are present in the Timmins area:(1) -Massive and stringer-type copper-zinc deposits occurring mainly in pyroclastic rocks, as typified by the mi

    Jan 1, 1971

  • CIM
    Temperature Gradients in the Canadian Shield

    By A. D. Misener

    Introduction Temperature gradients have been determined for numerous locations in the Canadian Shield in connection with mining operations (1, 2, 12, 13, 14, 15). As part of a programme of geophysi

    Jan 1, 1949

  • CIM
    Geology and exploration history of the gold mineralization in the star lake area, saskatchewan

    By W. L. Murphy

    The Star Lake property, located 115 km northeast of La Ronge, Saskatchewan is underlain by metamorphosed andesitic tuffs and flows which have been intruded by the dioritic to granitic Star Lake Pluton

    Jan 1, 1986

  • CIM
    Effective Mine Ventilation Management without Compromising Mine Health & Safety and Productivity

    By W. E. Oching, M. M. Ghomshei

    "Collaboration among Ventilation Engineers, Mine Inspectors, worker representatives, health and safety officers and management is key to an effective operational mine ventilation management. Mine vent

    Jan 1, 2019

  • CIM
    The Assurance of Mineral Supplies for Canadian Industry

    By L. L. Sirois

    Because segments of the Canadian mineral-based economy are dependent totally or in part on foreign sources of certain minerals, their well-being may well be affected by inability to obtain these miner

    Jan 1, 1977

  • CIM
    The Canada Tungsten Property, Flat River Area, Northwest Territories

    By L G. White

    During 1958, prospecting parties working for the Mackenzie Syndicate in the Flat River area of the Mackenzie mountains, Northwest Territories, identified tungsten mineralization and located the proper

    Jan 1, 1963

  • CIM
    Installation of Shaft Bottom Steel Prior to Shaft Sinking

    By D. M. Ziebarth

    "Normal sequence of operations to develop a new underground mine is: construct and outfit headframe for shaft sinking, sink shaft, construct and outfit shaft sump, develop shaft station and shaft bott

    Jan 1, 2019

  • CIM
    Review of High Pressure Tuyere Injection

    By A. E. M. Warner, I. E. Hills, C. L. Harris

    Since the late Dr. Keith Brimacombe, et al, performed tests at the now-closed Asarco Tacoma smelter and the Inco Copper Cliff Smelter on Peirce-Smith copper converters almost thirty years ago, many Py

    Jan 1, 2007

  • CIM
    Continuous Improvement Initiatives at the Newmont Ghana Gold Limited Ahafo Gold Mine

    By J. van Huyssteen, M. Cantor

    Newmont Ghana Gold Limited's Ahafo Operation has matured from its project ramp up stage into steady state operations after three years of operation. Management focus has shifted from addressing c

    Jan 1, 2011

  • CIM
    Framework for Resource Uncertainty Prediction and Data Valuation: An Application to Diamond Deposits

    By J. G. Manchuk, M. Thurston

    "The degree of uncertainty associated with a natural diamond resource is important to quantify from the time of discovery through the production lifetime. Data collection occurs during the discovery,

    Jan 1, 2015