Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Construction and Commissioning of the Lebong Tandai Gold Mine and Treatment Plant

    By West RF, Pooley RH

    An underground mine, a treatment plant and supporting facilities have been constructed at Lebong Tandai in Sumatra, Indonesia by PT Lusang Mining. Throughput is initially 50,000 tonnes per annum

    Jan 1, 1986

  • AUSIMM
    Modelling of the Chemical Speciation of Cyanide Species û Application to Effluent Treatment

    By Tran T, Young D

    During the processing of gold, effluents that are discharged into the tailing dams contain free cyanide, metal cyanide complexes of zinc, copper, iron, etc and their oxidised products such as ammoni

    Jan 1, 1991

  • AUSIMM
    Novel Processes for the Treatment of Sulphidic Refractory Gold Concentrates

    By Bourne R. W, Smith T

    This paper presents initial findings of a project examining novel processes for the treatment of refractory sulphidic gold concentrates. Non-oxidative roasting of such concentrates for 12 hours at 7

    Jan 1, 1991

  • AUSIMM
    Cloning and Expression of Thiocyanate Resistance Genes in Iron/Sulphur Oxidising Bacteria

    By M Wilkes, C-Q Liu

    Microbial oxidation of refractory sulphide ores (particularly gold and copper ores) are well-established techniques that are increasingly employed because of their low capital and operating costs and

    Jan 1, 2002

  • AUSIMM
    Process Options Using Solvent Extraction for the Processing of Laterites

    The treatment of nickel ores and concentrates and the subsequent processing to recover separate products of nickel and cobalt is one of the major interests at present in the mining industry. The inc

    Jan 1, 1996

  • AUSIMM
    Strategic Development of the Stage 5 Pit at Kidston

    The originally estimated mine life at Kidston (starting 1984) was 12 years. Through a continuing process of re-evaluation and improvement in the operation and by expanding the geological knowledge i

    Jan 1, 1994

  • AUSIMM
    Beneficiation of a Turkish Bastnaesite Ore with Associated Fluospar and Barite

    By Ghiani M, Currelli L, Fuganti A

    the results of an experimental study aimed at beneficiating a complex ore containing bastnaesite and other rare-earth minerals, with associated barite and fluospar are illustrated. Owing to its mine

    Jan 1, 1993

  • AUSIMM
    Station Electrical and Mechanical Design

    This paper forms part of a series of papers relating to the Melbourne Underground Rail Loop and presented to the Fourth Australian Tunnelling Conference in Melbourne, March 1981. The Design of Ele

    Jan 1, 1981

  • AUSIMM
    Solid State Reduction of Australian Chromite with Coal

    By Johnston R. F

    The factors which influence the reduction of chromite are investigated with special reference to Coobina chromite. This was compared with a South African chromite ore. The reduction characteristics ar

    Jan 1, 1994

  • AUSIMM
    Optimisation in Underground Mine Design

    Optimisation and sensitivity analysis of final pit limits is now an accepted procedure for open pit planning studies. Tools to assist the design engineer in an underground metalliferous mine to make

    Jan 1, 1995

  • AUSIMM
    Complex Strombolian and Phreatomagmatic Volcanism of Rothenberg Scoria Cone, East Eifel Volcanic Field

    By Schmincke H-U

    The Pleistocene basanite-tephrite Rothenberg cone complex was built by an alter- nation of strombolian and phreatomagmatic phases of explosive eruption. Two main centres, on a one km long NNE-trend

    Jan 1, 1987

  • AUSIMM
    Catacylsmic Emission Controlled by Organic Residues During Mineralisation of Upper Devonian Extinction Envrironments

    Cataclysmic or flood-like release of gas-charged brines, hydrocarbons and slurries accompanied widespread mineralisation of Upper Devonian environments. These are well represented in the Canning and B

    Jan 1, 1990

  • AUSIMM
    Reliability Centered Maintenance for Mining Equipment

    By Granholm S

    The current emphasis within the mining industry to reduce the cost of production has stimulated interest in the field of maintenance and operational reliability of capital intensive mining equipue

    Jan 1, 1988

  • AUSIMM
    In-Situ Leaching of Oxide Gold Deposits

    In-situ leaching of gold deposits has not become an option largely as a result the lack of suitability of cyanide as a lixiviant due to sluggish kinetics and high dependence on the availability of o

    Jan 1, 1991

  • AUSIMM
    Contributed Discussion to "Optimization Techniques for the Open Pit Limit Problem" by L. Caccetta and L. M. Giannini (Bulletin and Proceedings, Vol. 291, December, 1986).

    The authors have succeeded in providing additional rigour and clarity to the formulation and execution of the dynamic programming algorithm for optimum open pit limit determination. The inclusion of t

    Jan 1, 1987

  • AUSIMM
    An Integrated Approach to Evaluation of Blasts - A Case Study

    By Chung S

    The problems associated with equating calculated and measured properties of explosives with blast results are examined. The results from six full-scale test blasts in a limestone quarry are describe

    Jan 1, 1990

  • AUSIMM
    Geology and Ore Characterisation in Gold Heap Leaching

    By Roberts C

    The satisfactory testing and characterisation of mineralisation amenable to heap leaching, is of prime importance to successful operation of a project. This paper outlines a methodology for assessin

    Jan 1, 1994

  • AUSIMM
    Mining and Treament of Gold Bearing Clayey Ores at Golden Ridges, new Guinea

    The extraction of the values from gold bearing clay or clayey ores has always presented difficulties. A description of the successful operation of a mill working on material of this nature is here giv

    Jan 1, 1951

  • AUSIMM
    using Simulation to Assess the Impact of Improvements in Drill and Blast on Down Stream Processes

    A simulation model of the load and haul process where the loader cycle has been subdivided into its individual components is used to consider the benefits derived from improved drill and blast metho

    Jan 1, 1998

  • AUSIMM
    Supergene sulphide ore from the Mutooroo mine, South Australia: characterization and dissolution of copper

    By Davey P. T, Tsambourakis G

    Mineralogical analysis of supergene sulphide ore recovered from areas close to the underground workings at the abandoned Mutooroo (South Australia) mine shows that the original sulphide minerals have

    Jan 1, 1986