Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of the SIROLOG Downhole Geophysical Tool at Callide Coalfields ù East Central Queensland

    Callide Coalfields produces a sub-bituminous, very subhydrous, low rank, steaming coal with good combustion properties, primarily for domestic power generation. Geological input into planning of coal

    Jan 1, 2000

  • AUSIMM
    Practical Solutions to Some Grade Control Problems and Why They Work: A Few Case Studies

    Experience in evaluating grade control at operating mines has shown that a number of similar errors re-occur in diverse settings. These can be broadly classed as technical errors, and procedural or gr

    Jan 1, 1993

  • AUSIMM
    Factors Affecting the Catastrophic Swelling of Iron Oxides on Reduction

    By Biswas AK, Hayes P

    During the reduction of iron oxide pellets in the blast furnace it has been found that catastrophic swelling (up to 300% volume increase) can occur. Although the burden preparation conditions can

    Jan 1, 1980

  • AUSIMM
    Introduction of Battery Powered Coal Haulers into Board and Pillar Panel Production

    Powercoal Pty Ltd operates eight underground coal mines in New South Wales and produces coal for both domestic power stations and the export market. Approximately 40% of total production is from conti

    Jan 1, 1998

  • AUSIMM
    Sumps Aids The Broken Hill Proprietary Company Limited In Saxonvale Feasibility Study (4f6b06bb-7b16-41b9-9052-ce170d293140)

    By Kukla G. T

    A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine plannin

    Jan 1, 1980

  • AUSIMM
    Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 2 Utilization of Belt Conveyors

    On the 18th November, 19'58, the first coal was delivered to the Morwell Power Station from the adjacent Open Cut using conveyors for the transport of the coal from the working face to the boiler

    Jan 1, 1960

  • AUSIMM
    The Charging of Slurry Explosive with the Nitro Nobel Cartridge Loader at the Mount Lyell Mining and Railway Co. Ltd., Queenstown, Tasmania

    By Wilson J. R

    The main mining method employed at Mt Lyell is sub-level open stoping with a typical extraction level interval of 100 m and sub-level intervals of 30 m. Currently, pillar blasts provide the major p

    Jan 1, 1977

  • AUSIMM
    The Mount Gordon Pressure Leach Process ù Continuous Improvements in Leaching Capacity and Electrowinning Utilisation

    By T Lancaster

    The Mount Gordon operation, consisting of the Esperanza open cut mine and the unique Mount Gordon Ferric Leach processing plant, is operated by Western Metals Copper Ltd at Mount Gordon, 125 km north

    Jan 1, 2002

  • AUSIMM
    Some Petrographic and Genetic Aspects of Rampura - Agucha Zinc - Lead Deposit, District Bhilwara, Rajasthan, India.

    By Singh TN

    Rampura-Agucha Zinc-Lead deposit is unique as it is reported for the first time in the gneissic terrain with a rich oregrade quality of early to middle Proterozoic of Bhilwara supracrustal belt in the

    Jan 1, 1990

  • AUSIMM
    NorandaÆs Approach to Evaluating a Competent Deposit for Caving

    By A Coulson, J Hussey

    Noranda Inc is a Canadian mining and metallurgical company with its activities managed through businesses in copper and recycling, zinc, aluminum, magnesium and various metals through its interest in

    Jan 1, 2000

  • AUSIMM
    The Importance of the Bosh and Hearth in Influencing Blast Furnace Gas Flow

    The physical phenomena which influence gas flow in the bosh and hearth of a blast furnace are discussed including the hold-up of slag as a mechanism which can result in a flooding condition. An equat

    Jan 1, 1975

  • AUSIMM
    Economic Loss Fucnctions and Geostatistical Simulation for Grade Control Applications

    By Koppe J. C, Dimitrakopoulos R, Costa J. F

    Grade control and the delineation of ore/waste in open pit operations is traditionally based on the comparison of estimated grades with an economic cut-off. This paper deals with an alternative appr

    Jan 1, 1998

  • AUSIMM
    The Rawas Gold Project æSuccessfully Overcoming the ChallengesÆ -- The Task Facing a Junior in Indonesia from Exploration to Production

    By Williams JK, Bolitho BC

    Laverton Gold NL (Laverton) is the first junior Australian mining company to establish a viable mining operation in Indonesia. It successfully commissioned the Rawas plant in Sumatra this year with an

    Jan 1, 1997

  • AUSIMM
    The Geological Setting of Queensland Coal

    Queensland hosts vast deposits of brown and black coal, significant accumulations ranging in age from Permian to early Tertiary. The great diversity of coal resources in the State to some extent re

    Jan 1, 1991

  • AUSIMM
    Sampling and Sample Preparation Systems for Hamersley Iron Ore Products at the Port of Dampier

    Sampling and sample preparation systems at the Hamersley Iron Pty. Limited port of Dampier, W.A., were developed for two separate objectives. 1. The need for rapid determination of physical propert

    Jan 1, 1976

  • AUSIMM
    The Monitoring of Mineral Processing Operations Using Computer Vision and Neural Networks

    By Bezuidenhout M, Moolman D. W

    In the minerals industry numerous problems cannot be solved by conventional mathematical models owing to their complexity or a lack of phenomenological understanding. Neural networks provide one way

    Jan 1, 1997

  • AUSIMM
    Understanding Mine Site Water and Salt Dynamics to Support Integrated Water Quality and Quantity Management

    By S D. Golding, K Baublys, V Nanjappa, C J. Moran

    Water reuse is becoming an integral component of the water management strategy on mine sites. This practise is being driven by corporate sustainability goals, community and societal pressures to demon

    Jan 1, 2009

  • AUSIMM
    Optimisation of copper treatment at Mount Isa Mines Limited

    By Canning RL, Pritchard J

    The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes

    Jan 1, 1986

  • AUSIMM
    The Porphyry Gold Mine, W.A. From Prediction to Production

    The Porphyry Gold Mine (150km NE of Kalgoorlie) was reopened in November 1983 with production commencing in April 1984. Original reserves quoted for the open pit were 822000 tonnes at 5.2 g/t Au based

    Jan 1, 1986

  • AUSIMM
    Thermal Analysis In The Study Of The Firing Behaviour Of Magnetite

    By Beech-Jones J. M

    At Port Latta in Tasmania, Savage River Mines operates vertical shaft furnaces for the firing of pelletised magnetite concentrates. At times the temperature profile of the furnace has changed marked

    Jan 1, 1974