Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Brief Outline of Mount Isa Copper Smelter

    The equipment and general smelter layout for the Mount Isa Copper Smelter were designed by engineers associated with the American Smelting and Refining Company and by Mount Isa staff engineers. The fi

    Jan 1, 1953

  • AUSIMM
    New Non-Cyanide Technology for Processing Massive Copper-Zinc Ores

    By T Ye Koltunova an, L A. Otrozhdyonnova

    This paper presents the results of studies on the development of an efficient non-cyanide technology for processing massive, finely disseminated, copper-zinc ores of the Urals deposits. Copper is main

    Jan 1, 2005

  • AUSIMM
    Tectonic Controls on Magmatic-Hydrothermal Gold Mineralisation in the Magmatic Arcs of SE Asia and the SW Pacific

    By R Hall

    The magmatic arcs of SE Asia and SW Pacific contain some of the worldÆs major magmatic-hydrothermal gold deposits. Most gold deposits in SE Asian and SW Pacific arcs formed during periods of plate reo

    Jan 1, 2005

  • AUSIMM
    The Stabilization of Arsenic by Its Incorporation Into Lead-Zinc Smelter Slag

    By Lawson F

    Arsenic-containing waste was dissolved into molten slags and the leaching behaviour of the quenched arsenic-doped slags (containing up to 2.3 wt per cent arsenic) was ascertained to evaluate the poten

    Jan 1, 1996

  • AUSIMM
    The Toka Tindung Gold Project Northern Sulawesi, Indonesia

    By Tuckey SH, Wake BA, Ariti J

    Astute exploration on the northern Minahasa Peninsula, North Sulawesi, resulted in the discovery of the Toka Tindung, Pajajaran, Blambagan and Araren low-sulphidation quartz-adularia vein and stockwor

    Jan 1, 1997

  • AUSIMM
    The Progera Gold Project: Development of a Resource, Resource for Development?

    The Porgera gold project is now in its seventh year of operation as one of the world's prime gold mining projects in one of the most underdeveloped and remote regions of the world. The unique g

    Jan 1, 1997

  • AUSIMM
    A new test method for directional propagation of type-I rock cracks

    By W Y. Guo, L X. Chen, D X. Zhang

    To obtain the rock type-I crack propagation process accurately, a novel fixture is used to make the prefabricated crack of rock propagation along the predetermined direction. In this study, the crack

    Nov 29, 2022

  • AUSIMM
    Multi-physical field coupling model development and parameter analysis of natural gas hydrate considering mechanical damage

    By Z R. Guo, Y Qiu, X F. Wang

    Mechanical damage leads to the increase of effective stress of sediments, and pore closure hinders the discharge of methane gas. Ignoring the influence of mechanical damage leads to an excessive predi

    Nov 29, 2022

  • AUSIMM
    Developing the West Pilbara Iron Ore Project

    By K Watters

    API Management Pty Ltd (API) is currently developing the West Pilbara Iron Project (the ‘Project’). The Project is a substantial greenfi elds mining and infrastructure development proposed for the wes

    Jul 11, 2011

  • AUSIMM
    Underground Mine Fire Prevention at the South Mine, Broken Hill

    SINCE 1900, five underground fires of consequence have beenrecorded in the Broken Hill mines. These occurred at the Junction(1906), Proprietary (1906 and 1916), Block 14 (1906), and Centralmines (1923

    Jan 1, 1929

  • AUSIMM
    Velocities of Particles and Bubbles in Grid Turbulence Measured by Particle Image Velocimetry

    By D P. Telionis, P P. Vlachos, R-H Yoon

    Industrial processes involving multi-phase flows such as flotation require understanding of the relationships between bubbles, solid particles and the flow. Modern experimental tools are employed in t

    Jan 1, 2005

  • AUSIMM
    Case studies for integrating rehabilitation planning with mine planning in strip mining

    By I Neilsen, A Walker, A Hooper

    Final landform planning in Deswik software was used to determine if integration into the mine plans could achieve better closure outcomes. Using the dump surface outputs from the Deswik Landform and H

    Jul 25, 2018

  • AUSIMM
    The Toowong process for treatment of complex ores

    By L MacDonald, D Molver, D Pepper

    Increasing contamination/impurity levels (including arsenic, antimony, mercury etc.) of concentrates is an issue of global commercial and health / environmental significance. With increasing environme

    Nov 21, 2018

  • AUSIMM
    Optimisaiton in the Resources Industry : A Financial Perpective

    Management at all levels continually strive to optimise, or make the most of resources available to them. Daily, decisions are being made on how to most efficiently locate and exploit an ore body, t

    Jan 1, 1991

  • AUSIMM
    Selection, Training and Performance Management

    There are three major human resource management activities which, depending on how well they are done, impact on the performance of people and therefore the bottom line. These are: ò recruitment; ò

    Jan 1, 1995

  • AUSIMM
    Developing technologies for a complex orebody

    By G Anderson, V Lawson, P Voigt

    Glencore operates zinc concentrators at both Mount Isa and McArthur River. Both orebodies have a history of complexity and required the development of new technologies to maximise the value from thes

    Nov 21, 2018

  • AUSIMM
    Synergistic defoaming/anti-foaming in zinc leaching with surfactant and silicone based defoamers

    By Q Zhou, H Nordberg, W Wang-Geissler

    Efficiently controlling foam/froth within mineral processing continues to pose a challenge to the mining sector. The foaming characteristics of aqueous solutions for two-phase systems of air/liquid ar

    Aug 24, 2022

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Ulan a Resource Development

    All aspects of the development of Ulan Coal Mines are covered - from a small pit pony mine in 1975 to an efficient mechanised underground and open cut operation today.

    Jan 1, 1983

  • AUSIMM
    Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine Closure

    By K White, C Ferguson, M Harding

    Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif

    Jun 28, 2016