Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Some Radioisotope Applications in Mineral Processing

    By Wilkinson LR

    The object of this paper is to present a brief overview of applications of radioisotopes in mineral processing. The emphasis is towards on-line applications, and is to present the broad picture rat

    Jan 1, 1978

  • AUSIMM
    Peak Downs Mine Operations with Special Reference to Multi-Seam Stripping

    By Seymour C. A

    Peak Downs Mine, a five million tonnes a year coking coal operation, strip mines a, series of Permian coal seams. Seam thickness ranges from 0.5m to 5.0m, and seams consist of multiple coal plies w

    Jan 1, 1974

  • AUSIMM
    The Permian Coal Deposits of New South Wales

    By Shiels O. J

    The major Permian coal deposits of N.S.W. are in the Sydney-Bowen Basin and associated small deposits occur in structurally isolated areas; a further deposit is present in the Oaklands Basin. - The S

    Jan 1, 1975

  • AUSIMM
    Island Arc Geodynamics: A Model with Implications for Seismic and Magmatic Processes

    By Demin SS

    Slow seismotectonic movements along the in-clined deep fault zone under the compressional horizontal stresses are supposed to be the prin-cipal mechanism controlling the structure and processes in the

    Jan 1, 1990

  • AUSIMM
    High Pulp Density Hydraulic Fills

    By Fuller P. G, Miller D. R

    Hydraulic fill using surface sand deposits or cycloned tailings has been used in underground mining for at least fifty years. Current technology requires a permeable fill and high cement additions

    Jan 1, 1986

  • AUSIMM
    New Developments to Lead Mechanical Underground Excavation Toward the Year 2000

    Drill and blast excavation in underground mining and. civil engineering projects has grad- ually given ground to mechanical boring of tun- nels, shafts and raises during the past twenty years. The us

    Jan 1, 1981

  • AUSIMM
    Pilbara Iron Ore Classification - A Proposal for a Common Classification for BIF-Derived Supergene Iron Ore

    A co-operative research project, combining Commonwealth Scientific and Industrial Research Organisation (CSIRO) research scientists findings and company iron ore geologists' expertise, resulted i

    Jan 1, 1984

  • AUSIMM
    Tectonic Features of Sumatra and New Zealand in Relation to Active and Fossil Hydrothermal Systems: A Comparison (03fbbe41-bfa7-4f63-a332-5ec59c058031)

    By Bogie I, White P. J

    Active geothermal systems occur widely in Sumatra and in the Taupo Volcanic Zone (TVZ) of New Zealand. There are also many occurrences of epithermal gold mineralisation in Sumatra, some of which are

    Jan 1, 1995

  • AUSIMM
    Oceanographic Preparations for Offshore Operations

    By Nilsson C

    Man has always been and will always be part of his environment, in ,a good, bad or indifferent manner. Until quite recently, this environment has been the atmospheric boundary layer above the land m

    Jan 1, 1970

  • AUSIMM
    Quality Control at Hamersley Iron

    By Hammond J. R, Ward T. A

    The Tom Price orebody, in the Hamersley Ranges of North West of Western Australia, is mined by Hamersley Iron Pty. Limited. The orebody is a folded sequence of hematite and shale bands capped with

    Jan 1, 1973

  • AUSIMM
    The Main Hydrogeological Characteristics of Mineral Deposits in China

    It is very apparent that the hydrogeotogicat characteristics of mineral deposits in China be dominated by meteoric factors, terrain factors and the kind of karstic aquifers as a main source threaten

    Jan 1, 1988

  • AUSIMM
    Virtual Hailage Trucks: Improving the Safety of Surface Mines

    By Denby B, Hollands R. Schofield D

    Surface mines are in operation worldwide, the vast majority employ large haul trucks for the transfer of material both to the outside world and around the site. The sheer size of these trucks and th

    Jan 1, 1998

  • AUSIMM
    Model Studies of Mining Pillar Stability

    By Szwedzicki T

    Uniaxial testing was performed on model pillars to determine the effect of width to height ratio on pillar and surrounding rock mass stability. Samples were modelled in a shape similar to that of du

    Jan 1, 1994

  • AUSIMM
    How to Obtain Cost-Effective Continuous High Production from TBMs

    By Jones A

    Today there is a vast amount of information available relative to the performance of tunnel boring machines, and associated systems. The data referred to here consists of project reports, manufacturer

    Jan 1, 1993

  • AUSIMM
    Uralite Dolerite Dykes in Relation to the Broken Hill Lode

    By Edwards A. B

    Re-opening of the old Proprietary mine has provided new exposures of the system of uralite dolerite dykes observed in 19110 by the Geological Sub-Committee of the Scientific Society of Broken Hill. Th

    Jan 1, 1956

  • AUSIMM
    Geological Controls on the Flow of Groundwater into Underground Excavations

    By Culshaw MG, Deaves AP, Bell FG

    The accurate prediction both of the water ingress into sub-surface excavations and the nearby groundwater pressures is of fundamental importance to the control of the stability and flooding of tunne

    Jan 1, 1988

  • AUSIMM
    Resource Estimation Practice at The Granites Gold Mine, Northern Territory

    The development of the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves is a significan step towards informing the financial community and the public about the futur

    Jan 1, 1990

  • AUSIMM
    Dartbrook Mine- Greenfield Opportunities in the Upper Hunter Valley

    Dartbrook mine is a new greenfields thermal coal longwall mine located n the Upper Hunter Valley ten kilometres north of Muswellbrook Figure 1). Construction began in April 1993 with coal extraction

    Jan 1, 1995

  • AUSIMM
    The Practical Design of a Hydraulic Hoist

    The intention of this work was to con struct a machine on a pilot scale which could hoist a mixture of ore and water through a height of 300 metres and to operate the mach- ine to determine the para

    Jan 1, 1973

  • AUSIMM
    Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project

    By Johns A. L

    The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victor

    Jan 1, 1981