Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Construction of the Seven Thousand Tonne per Day – Big Gossan Production ShaftBy N Herault
PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro
Mar 21, 2011
-
Durability Planning for Underground InfrastructureBy D Wimpenny
Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur
Mar 8, 2011
-
Interdisciplinary Approach to the Analysis of Acid Mine Drainage at an Underground Lead Zinc MineBy Williams RE, Ralston DR
Acid mine drainage is a serious environmental and economic concern, resulting in regulation of the mining industry and significant water treatment costs. An interdisciplinary approach is needed to a
Jan 1, 1988
-
New Zealand's Geological FrameworkBy R L. Brathwaite
The rocks of New Zealand can be grouped into three main elements: the Early to Mid Paleozoic Western Province, Late Paleozoic to Early Cretaceous Eastern Province, and several overlying Late Cretaceou
Jan 1, 1997
-
The Application of AS 61508 to Road Tunnel Fire and Life Safety SystemsBy M Taylor
The Project Specification and Technical Requirements documents associated with several recent large road tunnel projects within Australia have specified the application of AS/IEC 61508 – FunctionalSaf
Mar 8, 2011
-
Environmental Impact Modelling for In Situ Leaching of UraniumBy A Roshal
It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th
Jan 1, 2008
-
The effect of iron oxide on sulfide capacities of CaO-based molten slagsBy K Saito, M Hasegawa
Removing sulfur and phosphorus from molten iron can be expressed by the following reactions, respectively. [S]Fe + (O2-)slag = (S2-)slag + [O]Fe [P]Fe + (3/2) (O2-)slag + (5/2) (FeO)slag = (PO43-)slag
Jun 19, 2024
-
Implementing condition-based wear surface managementBy P Velletri, N Gaylard
The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi
Nov 8, 2021
-
In-Pit Crushing and Conveying Bench OperationsBy T Atchison
In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v
Jul 11, 2011
-
Improving Consistency of Delivery at Mt Rawdon OperationBy M Boon, M Franklin
This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2
Jun 22, 2016
-
Geometallurgy in Mineral Sands Deposits – Linking Geological Artifacts to Metallurgy and Mine PlanningBy G Williams
Somewhat to the surprise of many heavy mineral sands (TiO2 and zircon) producers, there are important geological structures within their typical placers and aeolian sands deposits that affect plant me
Oct 5, 2011
-
Understanding the causes of dilution in narrow vein stopesBy S Thomas, S Ricketts, R Hassell
Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d
Mar 15, 2021
-
Measuring spatial domain models’ uncertainty for mining industriesBy S A. McManus
With the advances in software speed and capability, many of us now are running multiple scenarios on entire models rather than just testing small areas or a few blocks. In the authors experience both
Mar 22, 2022
-
Simulation of Flotation Feed Pre-ClassificationBy J Arola, B Kettunen, W M. Bond
Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s
Jan 1, 2005
-
The Impact of Fluidised-bed Flotation for Treating Coarse SulfidesBy H Thanasekaran, M J. Mankosa, J N. Kohmuench, G H. Luttrell
"Fluidised-bed flotation has been demonstrated over the last 16 years as an effective method for improving the flotation recovery of coarse particles. This technology has been successfully deployed in
Oct 10, 2016
-
Precast Concrete Segmental Tunnel Linings – The State-of-the-artBy A Harding, M Chappell
Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig
Sep 17, 2014
-
Ventilation Upgrade at the FrogÆs Leg Mine - Case StudyBy A Llewellyn, M Varvari
The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.
Jul 1, 2013
-
Strain-dependent Stiffness of the Weathered Melbourne FormationBy Z Terzic, M Schult, D Chu, S Macklin
The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be
Sep 17, 2014
-
Drift and Fill - The High Value, High Recovery Mining SystemBy M English, M Yumlu
At times of high metal prices, mining projects that have previously been put into the ætoo hard basketÆ are now being more closely examined. Typically these projects include the potential recovery of
Jan 1, 2008
-
Impact testing of raise bore protection meshBy M Doran
The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3
Mar 29, 2023