Predicting and modelling Bond Work Index using chemistry (as a proxy for mineralogy)By K Gardner, R Fraval, V Singh
Using new technology to create optimised infill drill programs in underground or open pit settings, it is possible to quantify the value of a drill program. The computer designed programs are optimise
Mar 22, 2022
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Application of Lateral Crater Test in Open Pit Blasting Parameters OptimisationBy Y M. Wang, W Z. Liu, L F. Li, X L. Zhang
Based on the blasting crater theory, the equation between k under typical cases and burden line, charge height was obtained by open pit bench blasting analysis model. The model was calculated with min
Aug 24, 2015
-
Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022
-
Sublevel Open and Fill Stoping Method Used in the Hedong Gold Mine (9bf3555f-32de-4bf1-9441-2d6607584635)By Wang J, Ma Y, Jia H
The Hedong Gold Mine is located in the Yan(ai area, tihandong hroo%ill, e. China. It is an underground mine with an annual gold output of some 700 0(H) grams. The orebody is located on the edge of t
Jan 1, 1998
-
An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore finesBy T Walkemeyer, R Elliott, D Chang-Martin
Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins
Sep 18, 2023
-
Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel ProcessingBy A Tawadrous, B Wheeler, D S. Preece, S A. Silling
The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical
Aug 24, 2015
-
Reduction in Diesel Particulate Matter at Oaky NorthBy A Melloy, D Holt, M Jurak
Oaky North is AustraliaÆs highest producing underground coal mine. In 2011, the mine produced 8.7 Mt of high-quality coking coal. The high quantities are a result of the constant strive for optimising
Jul 1, 2013
-
Is the Python Right for Me? PythonGekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr
Aug 1, 2010
-
Carrapateena project to date – Geotechnical risks and managementBy G Balog, T Ormerod, D Cox
This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana
Mar 15, 2021
-
Operational deployment of sensor technologies for bulk ore sorting at Mogalakwena PGE MineBy J Rutter, J du Plessis, er, M Scott, D Alex
It is generally acknowledged that bulk ore sorting is an attractive prospect for the mining industry. However, uncertainties relating to the operational performance of sensor technologies, the grade h
Nov 10, 2020
-
Assessing corrosion of reinforcement on a large scaleBy N Power, R Hassell, E Jones
Wiluna Mining Corporation are progressively re-entering the old Wiluna underground mining complex. The existing underground was abandoned in 2013 by previous owners and left to flood with water levels
Nov 29, 2022
-
A Review of the Influence of Gas Pressure on Block Stability during Rock BlastingBlasting is an essential component of most mining operations, and is used to reduce the rock mass to a workable size distribution, as well as to create stable openings and pit walls. Frequently, there
Jan 1, 1999
-
Physical and Technical Evaluation of Possibility Using Low-density Explosives in Smooth BlastingBy I Y. Maslov, S A. Gorinov
It was demonstrated that the stable propagation of the explosive process is possible in low-density emulsion explosives (EEs) obtained through mixing of emulsion with a significant amount of expanded
Aug 24, 2015
-
Sensors and Systems for the Measurement of Tunnel Movements During and After ConstructionBy W Ward, J Clegg, R Barnes, T Zhong
This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case
Sep 17, 2014
-
An explosion of variety in the DeGrussa structural vineyardBy P J. Willems, B J. Junor
Blackwater Mine is in the central-southern Bowen Basin, immediately south of the township of Blackwater on the Capricorn Highway. The current open cut operation extracts coal from three main seams, de
Mar 22, 2022
-
Recent Iron Making Topics in JapanBy N Takamatsu
The environments surrounding the iron and steel industry have changed greatly in recent years. Reported in this paper are the technologies adopted by the Japanese iron and steel industry to fititself
Jul 11, 2011
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
A methodology for assessing stope design modifying factors for the Olympic Dam MineBy S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant
The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order
Mar 15, 2021
-
Geohazmap Implementation in Block Cave MinesBy S Talu, E Savage, S Howe
Major falls of ground, strainbursts, airblast and mudrush events are the major hazards in block caving environments, resulting in both safety and financial consequences and losses. Rio Tinto mines hav
May 9, 2016