Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Chevron Niugini's Approach to Land and Community RelationsBy Rokot M
In a little over three years, Chevron Niugini has built up a team of relatively young, hard working men and women, mostly Papua New Guineans, who spend most of their working days out among people
Jan 1, 1991
-
Transforming the Rope Haulage Concept into the 21st CenturyBy B R. Castley
Consumable materials used in mines are often transported to the working areas down shallow angle decline shafts, typically at anywhere between 10¦ and 30¦ to the horizontal. The winding equipment is u
Jan 1, 2005
-
Raisebore drill string recovery case studyBy M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021
-
The Pre-Feasibility Study – Big Choices, Little TimeBy D J. Logan, J Jackson
"As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin
Mar 8, 2016
-
A Review of ISO 5802:2001 Industrial Fans - Performance Testing In SituBy K J. Lownie, T Rafferty
The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test
Jul 1, 2013
-
Use of Metallurgical Test Data in Resource Evaluation for Magnetite DepositsBy J N. Farrell
Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge
Jul 11, 2011
-
An Automated System for Flyrock and Fume Monitoring of BlastsBy C K. McKenzie, P Popov, B E. Papillon, I Kharitonenko
Flyrock produced by blasts in surface mining and quarrying is a major hazard that can result in serious injuries or property damage. This paper presents a fully integrated and automated approach for r
Aug 24, 2015
-
Ball Mill Poly-Met Liner Evaluation at PT Newmont Nusa Tenggara – Batu Hijau MineBy G Pasin, F Wirfiyata, G Khomaeni, W Valery, A Maclean, A Jankovic
The grinding circuit at PT Newmont Nusa Tenggara (PTNNT) – Batu Hijau mine consists of two SABC (semi-autogenous milling, ball milling, pebble crushing) trains, including four 20'?×?33'6? ball mills t
Sep 1, 2014
-
Flexigel™ – A Variable-density SolutionBy D R. Andrew, K T. Morrison, J F. Tiedgen
Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to
Jul 13, 2015
-
New Technologies for Measurement of Operator Fatigue Helping to Deliver Improved Operator Health, Safety and Performance at the Mt Keith OperationsThe Mt Keith Mining Alliance operates a fleet of large capacity hydraulic face shovels and more than 40 X 240 t capacity haul trucks to deliver annual production in excess of 40 Mbcm per annum. The Mt
Jan 1, 2007
-
Modern Mining GeologyBy G Fahey, S Rose
"Mining geology as a defined profession is only about 100 years old. The successful modern mine geologist needs to be a multidisciplinarian, but also needs to maintain a focus on the key outputs of th
Aug 18, 2014
-
Virtual Reality Scientific Visualisation – A Solution for Big Data Analysis of the Block Cave Mining SystemBy J Tibbett, A Colebourn, B Hebblewhite, F Suorineni
The concept of Big Data refers to data sets that are so large, variable and/or complex that traditional data processing applications struggle to integrate the data for effective investigation, analysi
Nov 4, 2015
-
Geometallurgical Modelling Techniques Applicable to Prefeasibility Projects – La Colosa Case StudyBy P A. Montoya
La Colosa is a world-class porphyry Au project located in Colombia, currently undergoing prefeasibility analysis. As part of collaboration between AngloGold Ashanti and the AMIRA P843A GeMIII Project,
Sep 5, 2011
-
The Influence of Geology on Blasting Hazards and ResultsBy T N. Little
The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini
Aug 22, 2011
-
The Evolution of Diamond Drilling Practices at Olympic DamBy J Taylor, A Dubowik
To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a
Aug 18, 2014
-
Local uncertainty benchmarking – a coal case studyBy R Saha, D Barry, C Mawdesley, O Bertoli
Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often
Sep 20, 2017
-
Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional AreaBy A Bagis
Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while
Mar 8, 2011
-
Geometallurgy at Rio Tinto Iron Ore – a New Angle on an Old ConceptBy C M. W Boyle, E K. C Phuak, A Lewan, E Ryan, M D. Paine, P H. Mackenzie
"Rio Tinto Iron Ore (RTIO) has an extensive history in the application of geometallurgy to the iron ore value chain. Fundamental to this has been the geological logging of material types which are ass
Jun 15, 2016
-
Mines versus Mineralisation – Deposit Quality, Mineral Exploration Strategy and the Role of ‘Boundary Spanners’By J P. Sykes, T C. McCuaig, J E. Vann
Resources added to the global metal inventory through exploration over the past 15 years have been generally of poor quality (declining grades, recoveries and lack of acceptable financial return). Sim
Aug 18, 2014
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016